Crustal movement model in the ITRF2020 – a case study in Northern Vietnam

Article preview

In the North area of Vietnam, the crustal movement velocity of 38 GNSS points belonging to different international Earth reference frames (ITRF2000, ITRF2005, ITRF2008) is adjusted to the international Earth reference frame ITRF2020. This is the latest frame up to now. Since then, the picture of crustal movement in the North area of Vietnam has been unified in a dynamic coordinate system. In the study area, the rate of crustal movement is about 35 mm/year, and the direction of displacement is from northwest to southeast. To build a model of the crustal movement of the Earth in the northern area of Vietnam, the movement velocity data of 38 stations in ITRF2020 is evaluated with high accuracy. All points are also satisfactory. And then, the crustal movement velocity model is built by using the collocation method in the form of the 3-order Markov function. Within 38 stations, 34 stations are used to build the model and 4 remaining stations are used as checked stations. The obtained results show that the Earth's crust movement velocity model has an accuracy of about 2 mm/year for movement velocity and 2 deg for movement direction. This is the first model of Earth's crust movement in the North of Vietnam that has been built in the latest dynamic coordinate system ITRF2020. These results have important significance in the research and practical application of the movement of the Earth's crust. The steps of building the movement velocity model in this study can be applied to other experimental areas in the territory of Vietnam.

How to cite: Tham B.T.H., Thanh P.T. Crustal movement model in the ITRF2020 – a case study in Northern Vietnam // Journal of Mining Institute. 2025. Vol. 271 . p. 120-130. EDN PHHTOE
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2023-09-29
  • Date accepted
    2023-10-25
  • Date published
    2024-08-26

Laboratory studies of transformation of porosity and permeability and chemical composition of terrigenous reservoir rocks at exposure to hydrogen (using the example of the Bobrikovskii formations in the oil field in the northeast Volga-Ural oil and gas province)

Article preview

The article describes the methodology for laboratory studies of reservoir rock exposure to hydrogen. The stages of sample research and the instruments used in the experiments are considered. A comparative analysis of the results of studies on porosity and permeability of core samples was performed. It was shown that after exposure to hydrogen, the porosity decreased by 4.6 %, and the permeability by 7.9 %. The analysis of correlation dependencies demonstrated a typical change in the relationship of these characteristics: after the samples exposure to hydrogen the scatter of the values increased and the correlation coefficient decreased, which indicates a change in the structure of the void space. Based on the research results, it was concluded that the decrease in porosity and permeability of the core samples occurred due to their minor compaction under the action of effective stresses. The chemical analysis of the rock showed no major difference in the composition of the basic oxides before and after exposure to hydrogen, which points to the chemical resistance of the studied formation to hydrogen. The experimental results showed that the horizon under consideration can be a storage of the hydrogen-methane mixture.

How to cite: Popov S.N., Chernyshov S.E., Abukova L.A. Laboratory studies of transformation of porosity and permeability and chemical composition of terrigenous reservoir rocks at exposure to hydrogen (using the example of the Bobrikovskii formations in the oil field in the northeast Volga-Ural oil and gas province) // Journal of Mining Institute. 2024. Vol. 268 . p. 646-655. EDN MFPSXV
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2023-06-01
  • Date accepted
    2024-03-05
  • Date published
    2024-08-26

Analyzing friction bolts load bearing capacity in varying rock masses: an experimental study in Anti Atlas Imiter silver mining region, Morocco

Article preview

This study analyzes how key factors impact friction rock bolt capacity using standard pull-out tests, focusing on 39 mm diameter, 180 cm long split-tube bolts. We investigate bolt performance dependence on rock mass rating (RMR), time after installation, schistosity orientation, surface roughness, and installation quality. The aim is optimizing bolt design and implementation for enhanced underground stability and safety. Results show RMR strongly exponentially correlates with pull-out resistance; higher quality rock masses increase capacity. Anchorage capacity significantly rises over time, especially for RMR above 70. Increasing angle between bolt axis and rock foliation from 0 to 90° boosts pull-out response. Reducing borehole diameter below bolt diameter grows bolt-ground friction. Empirical models estimate load capacity based on RMR, time, orientation, diameter, roughness and installation quality. These reliably predict bolt performance from site conditions, significantly improving on basic RMR methods. Experiments provide practical friction bolt behavior insights for typical rock masses. The data-driven analysis ensures models are applicable to actual underground scenarios. This enables tailored optimization of bolting configurations and supports. Methodologies presented should improve safety, efficiency and cost-effectiveness of reinforced mining and tunneling. Overall, this study fundamentally furthers friction bolt performance understanding, enabling superior underground support design.

How to cite: Amine S., Latifa O., Mohammed S., Youssef Z., Anas B. Analyzing friction bolts load bearing capacity in varying rock masses: an experimental study in Anti Atlas Imiter silver mining region, Morocco // Journal of Mining Institute. 2024. Vol. 268 . p. 669-682.
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2021-12-20
  • Date accepted
    2024-05-02
  • Date published
    2024-08-26

A new formula for calculating the required thickness of the frozen wall based on the strength criterion

Article preview

The study delves into the elastoplastic deformation of a frozen wall (FW) with an unrestricted advance height, initially articulated by S.S.Vyalov. It scrutinizes the stress and displacement fields within the FW induced by external loads across various boundary scenarios, notably focusing on the inception and propagation of a plastic deformation zone throughout the FW's thickness. This delineation of the plastic deformation zone aligns with the FW's state of equilibrium, for which S.S.Vyalov derived a formula for FW thickness based on the strength criterion. These findings serve as a pivotal launchpad for the shift from a one-dimensional (1D) to a two-dimensional (2D) exploration of FW system deformation with finite advance height. The numerical simulation of FW deformation employs FreeFEM++ software, adopting a 2D axisymmetric approach and exploring two design schemes with distinct boundary conditions at the FW cylinder's upper base. The initial scheme fixes both vertical and radial displacements at the upper base, while the latter applies a vertical load equivalent to the weight of overlying soil layers. Building upon the research outcomes, a refined version of S.S.Vyalov's formula emerges, integrating the Mohr – Coulomb strength criterion and introducing a novel parameter – the advance height. The study elucidates conditions across various soil layers wherein the ultimate advance height minimally impacts the calculated FW thickness. This enables the pragmatic utilization of S.S.Vyalov's classical formula for FW thickness computation, predicated on the strength criterion and assuming an unrestricted advance height.

How to cite: Semin M.А., Levin L.Y. A new formula for calculating the required thickness of the frozen wall based on the strength criterion // Journal of Mining Institute. 2024. Vol. 268 . p. 656-668. EDN WEJUBT
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2023-07-27
  • Date accepted
    2024-06-03
  • Date published
    2024-12-25

Normalized impulse response testing in underground constructions monitoring

Article preview

Impulse Response testing is a widespread geophysical technique of monolithic plate-like structures (foundation slabs, tunnel lining, and supports for vertical, inclined and horizontal mine shafts, retaining walls) contact state and grouting quality evaluation. Novel approach to data processing based on normalized response attributes analysis is presented. It is proposed to use the energy of the normalized signal calculated in the time domain and the normalized spectrum area and the average-weighted frequency calculated in the frequency domain as informative parameters of the signal. The proposed technique allows users a rapid and robust evaluation of underground structure’s grouting or contact state quality. The advantage of this approach is the possibility of using geophysical equipment designed for low strain impact testing of piles length and integrity to collect data. Experimental study has been carried out on the application of the technique in examining a tunnel lining physical model with a known position of the loose contact area. As examples of the application of the methodology, the results of the several monolitic structures of operating municipal and transport infrastructure underground structures survey are presented. The applicability of the technique for examining the grouting of the tunnel lining and the control of injection under the foundation slabs is confirmed. For data interpretation the modified three-sigma criteria and the joint analysis of the attribute’s behavior were successfully used. The features of the field work methodology, data collection and analysis are discussed in detail. Approaches to the techniques' development and its application in the framework of underground constructions monitoring are outlined. The issues arising during acoustic examination of reinforced concrete plate-like structures are outlined.

How to cite: Churkin A.A., Kapustin V.V., Pleshko M.S. Normalized impulse response testing in underground constructions monitoring // Journal of Mining Institute. 2024. Vol. 270 . p. 963-976. EDN BPIOTO
Geology
  • Date submitted
    2022-10-29
  • Date accepted
    2023-10-25
  • Date published
    2024-04-25

Assessment of rock massif sustainability in the area of the underground research laboratory (Nizhnekanskii Massif, Enisei site)

Article preview

The study presents the results of the research on geodynamic and geological conditions of the Enisei site (Krasnoyarsk Krai), chosen for the construction of an underground research laboratory. The laboratory is being built at a depth of 500 m to assess the suitability of the rock mass for burying high-level radioactive waste. The rocks consist of weakly fractured gneisses, granites, and dikes of metadolerites. Field observations were conducted on bedrock outcrops. They included the determination of rock mass quality indicators, measurement of rock fracturing, and a rating classification of stability using N.Barton's method. GNSS observations were also made to monitor surface deformations. These data were used to develop a three-dimensional structural model, including lithology, fault disruptions, intrusive bodies, elastic-strength properties of rocks, and the sizes of zones influenced by faulting. It will serve as a basis for boundary conditions and the construction of three-dimensional variational models of stress-strain states, identifying zones of concentration of hazardous stresses, and planning in situ geomechanical experiments in underground mines of the laboratory. The obtained values of the modified QR index for the main types of rocks allowed their classification as stable and moderately stable, corresponding to strong and very strong rocks on Barton's scale and the massif rating according to geomechanical classification.

How to cite: Akmatov D.Z., Manevich A.I., Tatarinov V.N., Shevchuk R.V., Zabrodin S.M. Assessment of rock massif sustainability in the area of the underground research laboratory (Nizhnekanskii Massif, Enisei site) // Journal of Mining Institute. 2024. Vol. 266 . p. 167-178. EDN ECCWUV
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2023-07-04
  • Date accepted
    2023-09-20
  • Date published
    2023-10-27

Structure maintenance experience and the need to control the soils thermal regime in permafrost areas

Article preview

The risks of reducing the stability of buildings and structures are increasing in conditions of climate change and the active development of the territories under the influence of natural and anthropogenic factors. The main causes include: loss of the bearing capacity of frozen soils, various geocryological processes, errors at the stages of design, construction and operation of facilities. Main actual task when conducting research and industrial operations in the cryolithozone is monitoring and, if necessary, managing thermal processes in the permafrost layers interacting with facilities. In this article the obtained positive experience of various technologies applying at various stages of the life cycle of civil and industrial facilities was analyzed. It helps to eliminate or prevent the structure deformation or destruction under the influence of climate change. The methods of permafrost stabilization used in the oil and gas industry in process of industrial infrastructure development of the fields have been studied – freezing (cooling) of foundation soils during construction on heterogeneous foundations. The solution to the problems of minimizing accidents when locating production wells in the permafrost zone of the Yamal Peninsula is considered using the example of an oil and gas condensate field and restoring of the temperature regime of perennial unfrozen soils in areas of valve units of main gas pipelines. An assessment of methods used to maintain the industrial and residential infrastructure within the northern municipalities that ensure the functioning of the fuel and energy complex of the Russian Federation in the Arctic was made. The systems of thermal stabilization in the foundations of buildings and industrial facilities built and operated on permafrost soils allow to fully use the high strength and low deformability of frozen grounds. It ensures the state's long-term plans of the industrial development in the Arctic.

How to cite: Brushkov A.V., Alekseev A.G., Badina S.V., Drozdov D.S., Dubrovin V.A., Zhdaneev O.V., Zheleznyak M.N., Melnikov V.P., Okunev S.N., Osokin A.B., Ostarkov N.A., Sadurtinov M.R., Sergeev D.O., Fedorov R.Y., Frolov K.N. Structure maintenance experience and the need to control the soils thermal regime in permafrost areas // Journal of Mining Institute. 2023. Vol. 263 . p. 742-756. EDN IMQTQY
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2022-06-27
  • Date accepted
    2023-06-20
  • Date published
    2023-12-25

Analysis of the problems of high-quality drinking water extraction from underground water intakes on Vysotsky Island in the Vyborg district of the Leningrad region

Article preview

This article presents the results of drilling, experimental filtration work and laboratory studies aimed at assessing the resources and quality of groundwater in the licensed area of Vysotsky Island located in the Leningrad region, in the Gulf of Finland in accordance with the requirements of regulatory documents. Analysis of the results of hydrochemical studies and their comparison with data on water intakes in adjacent areas gives the right to conclude that it is possible to classify a hydrogeological unit as a different type of resource formation than those located in the surrounding areas. Groundwater in this area is confined to an unexplored deep fractured regional high-pressure zone. According to the received data, the explored water intake can be attributed to a unique groundwater deposit, which has an uncharacteristic composition of groundwater in the north of the Leningrad region, which may be due to the mixing of modern sediments and relict waters of the Baltic glacial lake. The stability of groundwater characteristics is confirmed by long-term monitoring.

How to cite: Nikishin V.V., Blinov P.A., Fedorov V.V., Nikishina E.K., Tokarev I.V. Analysis of the problems of high-quality drinking water extraction from underground water intakes on Vysotsky Island in the Vyborg district of the Leningrad region // Journal of Mining Institute. 2023. Vol. 264 . p. 937-948. EDN ZGVJSR
Energy industry
  • Date submitted
    2021-05-12
  • Date accepted
    2022-05-11
  • Date published
    2023-07-19

Application of the cybernetic approach to price-dependent demand response for underground mining enterprise electricity consumption

Article preview

The article considers a cybernetic model for the price-dependent demand response (DR) consumed by an underground mining enterprise (UGME), in particular, the main fan unit (MFU). A scheme of the model for managing the energy consumption of a MFU in the DR mode and the implementation of the cybernetic approach to the DR based on the IoT platform are proposed. The main functional requirements and the algorithm of the platform operation are described, the interaction of the platform with the UGME digital model simulator, on which the processes associated with the implementation of the technological process of ventilation and electricity demand response will be simulated in advance, is shown. The results of modeling the reduction in the load on the MFU of a mining enterprise for the day ahead are given. The presented solution makes it possible to determine in advance the necessary power consumption for the operation of the main power supply unit, manage its operation in an energy-saving mode and take into account the predicted changes in the planned one (e.g., when men hoisting along an air shaft) and unscheduled (e.g., when changing outdoor air parameters) modes. The results of the study can be used to reduce the cost of UGME without compromising the safety of technological processes, both through the implementation of energy-saving technical, technological or other measures, and with the participation of enterprises in the DR market. The proposed model ensures a guaranteed receipt of financial compensation for the UGME due to a reasonable change in the power consumption profile of the MFU during the hours of high demand for electricity, set by the system operator of the Unified Energy System.

How to cite: Nikolaev A.V., Vöth S., Kychkin A.V. Application of the cybernetic approach to price-dependent demand response for underground mining enterprise electricity consumption // Journal of Mining Institute. 2023. Vol. 261 . p. 403-414. DOI: 10.31897/PMI.2022.33
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2022-04-03
  • Date accepted
    2023-03-02
  • Date published
    2023-12-25

Specifics of geotechnical risk control in the design of underground structures

Article preview

The underground space development is associated with the emergence of complex and dangerous situations, often leading to accidents. The condition for their development is the potential geotechnical risks. High-quality execution and analysis of design work at all the stages of design, starting from the early stages, is one of the effective ways to control risks. Clarification of the characteristics and features of the rock mass adjacent to the projected underground structure makes it possible to identify the potential cause of the occurrence of an adverse event with a certain probability during the construction and operation of an underground structure. The purpose of a qualitative risk analysis is to identify risk factors in underground construction. The value of the total geotechnical risk, expressed by the sum of each of the possible risks, should be numerically estimated at the design stage of a specific underground facility. At the same time, it is extremely important to develop a methodology for managing geotechnical risks, which would make it possible to assess their probability of development at an early stage of project preparation and propose measures to reduce or prevent them. This technique is given in the article. The results of the study conducted in accordance with the presented methodology showed that geotechnical risk control proved an effective method in preventing accidents during underground construction.

How to cite: Kulikova E.Y., Polyankin A.G., Potokina A.M. Specifics of geotechnical risk control in the design of underground structures // Journal of Mining Institute. 2023. Vol. 264 . p. 895-905. EDN DGEAGK
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2022-09-27
  • Date accepted
    2023-04-03
  • Date published
    2023-12-25

The study of displacing ability of lignosulfonate aqueous solutions on sand packed tubes

Article preview

This paper presents the findings of laboratory studies of rheological properties and oil displacing ability of aqueous solutions of technical grade lignosulfonate done on the sand packed tube models. The solutions containing lignosulfonate can be useful as displacement agents in development of watered reservoirs with heterogeneous porosity and permeability. When used at high concentrations, technical grade lignosulfonate can achieve selective shut-off while maintaining the reservoir pressure. The oil displacement efficiency is improved by means of redistributing the flows and selective isolation of high-permeability zones. The use of such compositions allows increasing the sweep of low-permeability reservoir zones by created pressure differential and displacing the residual oil.

How to cite: Dorfman M.B., Sentemov A.А., Belozerov I.P. The study of displacing ability of lignosulfonate aqueous solutions on sand packed tubes // Journal of Mining Institute. 2023. Vol. 264 . p. 865-873. EDN DZDUVM
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2021-10-31
  • Date accepted
    2023-03-02
  • Date published
    2023-12-25

Improvement of technological schemes of mining of coal seams prone to spontaneous combustion and rock bumps

Article preview

On the example of the Alardinskaya mine, the problem of underground mining of seams prone to spontaneous combustion and rock bumps in the conditions of the Kondomsky geological and economic region of the Kuznetsk coal basin is considered. The contradictions in the requirements of regulatory documents for the width of the inter-panel coal pillars in the mining of seams with longwalls in conditions of endogenous fire hazard and in the mining of seams that are dangerous due to geodynamical phenomena are discussed. These contradictions impede the safe mining of seams using traditionally used layouts with the danger of spontaneous combustion of coal and rock bumps. A mining-geomechanical model is presented, which is used for numerical three-dimensional simulation of the stress-strain state of a rock mass with various layouts for longwall panels using the finite element method. The results of the numerical analysis of the stress state of the rock mass immediately before the rock bump are presented, and the main factors that contributed to its occurrence during the mining of the seam are established. A dangerous degree of stress concentration in the coal seam near the leading diagonal entries is shown, especially in conditions of application of abutment pressure from the edge of panels’ gob. The analysis of the features of stress distribution in the inter-panel pillar at different widths is carried out. Recommendations for improving the layout for the development and mining of coal seams that are prone to spontaneous combustion and dangerous in terms of rock bumps in the conditions of Alardiskaya mine have been developed. The need for further studies of the influence of pillars for various purposes, formed during the mining of adjacent seams, on the stress-strain state of previously overmined and undermined seams is shown.

How to cite: Sidorenko A.A., Dmitriev P.N., Alekseev V.Y., Sidorenko S.A. Improvement of technological schemes of mining of coal seams prone to spontaneous combustion and rock bumps // Journal of Mining Institute. 2023. Vol. 264 . p. 949-961. EDN SCAFOE
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2022-08-10
  • Date accepted
    2023-02-28
  • Date published
    2024-02-29

Selection of the required number of circulating subs in a special assembly and investigation of their performance during drilling of radial branching channels by sectional positive displacement motors

Article preview

The task of sludge removal to the surface during construction of directional and horizontal wells and strongly curved radial channels is relevant. For stable operation of technical system “Perfobore”, it is proposed to use a circulating sub that ensures efficient cleaning of channel wellbore from the drilled rock. Two schemes of technical system “Perfobore” are considered, consisting of two seven-meter coiled tubing, a positive displacement motor, a bit and one circulating sub in the first scheme and two subs in the second scheme. For each of the schemes CFD modeling was implemented to determine values of pressure and speed. It was found out that the use of two circulating subs in the assembly is more efficient. In order to confirm the numerical experiment, bench tests were carried out. It was determined that the designed circulating sub can eject up to 25 % of pumped drilling fluid. The bench tests of full-size technical system “Perfobore” for drilling 14-meter channels with two circulating subs showed that the axial load on positive displacement motor produced by hydraulic loader was 3000 N and pressure drop depending on flow rate was 1.5-2.0 MPa. This allows the motor to operate at maximum power.

How to cite: Lyagov I.А., Lyagov A.V., Isangulov D.R., Lyagova А.А. Selection of the required number of circulating subs in a special assembly and investigation of their performance during drilling of radial branching channels by sectional positive displacement motors // Journal of Mining Institute. 2024. Vol. 265 . p. 78-86. EDN ZBPWKU
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2022-10-17
  • Date accepted
    2023-02-13
  • Date published
    2023-04-25

Environmental geotechnology for low-grade ore mining with the creation of conditions for the concurrent disposal of mining waste

Article preview

Due to the constantly deteriorating environmental situation in the regions with mining enterprises, the article considers the topical issue of disposing the maximum possible volume of waste from the mining and processing of low-grade ferrous ores through the creation of an effective underground environmental geotechnology. Traditional procedure with descending mining of reserves with a caving system does not allow waste to be disposed of in a gob. The idea is to use geotechnology based on the ascending order of mining the ore body, room excavation, leaving truncated pillars, and staggered arrangement of adjacent rooms in height, which makes it possible to form containers for waste disposal in the form of a cementless backfill. The main characteristics of the proposed procedure are investigated and compared with the traditional procedure of low-grade iron ores mining. It was established that from the point of view of the complete extraction of reserves and the unit costs for the preparatory-development operations, the processes are comparable, while in terms of the mining quality, the proposed option is much more efficient. Evaluation of environmental geotechnology by the criterion of waste disposal, performed according to the proposed methodology, showed that the combination of these technical solutions ensures the placement in the formed gob from 80 to 140% of all waste generated during the mining and beneficiation of low-grade iron ores.

How to cite: Sokolov I.V., Antipin Y.G., Rozhkov A.A., Solomein Y.M. Environmental geotechnology for low-grade ore mining with the creation of conditions for the concurrent disposal of mining waste // Journal of Mining Institute. 2023. Vol. 260 . p. 289-296. DOI: 10.31897/PMI.2023.21
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2022-09-30
  • Date accepted
    2023-02-13
  • Date published
    2023-04-25

Hydrogeoecological conditions of technogenic groundwater in waste disposal sites

Article preview

The specific hydrogeoecological conditions of aquifers of some technogenic formations, mainly iron ore skarn-magnetite and titanium-magnetite formations, are considered. The resulting wastes, which are stored in waste disposal sites during development of deposits, due to the impact of a number of factors (natural and technogenic) form technogenic waters. Waste disposal facilities are complex engineering structures (dumps and sludge storages), which in turn create their own hydrogeoecological conditions, which must be investigated in order to prevent and minimize environmental and economic damage caused by these objects to the aquatic environment. The paper presents long-term field and laboratory studies of the aquatic environment under the influence of a waste disposal facility in the Middle Urals – one of the largest tailings, representing a potential environmental and man-made hazard. This tailing dump contains tens of tons of waste – enrichment tailings and creates specific hydrogeoecological conditions on the territory. Based on many years of monitoring studies, an analysis of these conditions was carried out – the quality of groundwater affected by the tailings was assessed. It is shown that groundwater is of technogenic nature, i.e. are man-made waters that have a significant impact on the surface and underground hydrospheres of the territory.

How to cite: Semyachkov A.I., Pochechun V.A., Semyachkov K.A. Hydrogeoecological conditions of technogenic groundwater in waste disposal sites // Journal of Mining Institute. 2023. Vol. 260 . p. 168-179. DOI: 10.31897/PMI.2023.24
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2022-07-15
  • Date accepted
    2022-12-13
  • Date published
    2023-02-27

Mathematical modelling of displacement during the potash ores mining by longwall faces

Article preview

In favourable mining conditions, in particular at the Starobinskoye potash deposit (Belarus), longwall mining systems are used. They cause a high human-induced load on the subsoil, including intense deformation of the ground surface. The presented investigations are aimed at studying the dynamics of the ground surface displacement during the longwall face advance. Mathematical modelling was carried out in an elastic-plastic formulation with numerical implementation by the finite element method. The condition for the roof rocks collapse was opening of the contact between the seams when its boundaries were reached by shear fractures or formation of the tensile stresses area at the outcrop. With the working front advance, an increase in subsidence is observed, followed by its stabilization to a value determined by the process parameters of mining operations and the physical and mechanical properties of collapsed rocks. In this case, each point of the ground surface experiences sign-alternating horizontal deformations: when the front approaches, it causes tension, and when it moves away, compression. The obtained results of mathematical modelling are in good agreement with the data of instrumental measurements of the ground surface displacements, which indicates the adequate description of the rock mass deformation during the slice excavation of sylvinite seams by longwall faces.

How to cite: Baryakh A.A., Devyatkov S.Y., Denkevich E.T. Mathematical modelling of displacement during the potash ores mining by longwall faces // Journal of Mining Institute. 2023. Vol. 259 . p. 13-20. DOI: 10.31897/PMI.2023.11
Modern Trends in Hydrocarbon Resources Development
  • Date submitted
    2022-05-12
  • Date accepted
    2022-09-15
  • Date published
    2022-12-29

Problem solution analysis on finding the velocity distribution for laminar flow of a non-linear viscous flushing fluid in the annular space of a well

Article preview

Modern drilling fluids are non-linear viscous media with an initial shear stress. In classical scientific works on hydromechanical modeling of drilling fluids motion in pipes and annular channels the Shvedov – Bingham approximation and Ostwald – de Waale power-law model were used, which did not fully account for behavior of technological fluids in a wide range of shear rates. This article presents a numerical solution for a mathematical model of drilling fluid motion of the three-parameter Herschel – Bulkley rheological model in the annular space of the well. The Herschel – Bulkley model in the rheological equation takes into account the presence of initial shear stress and a tendency for viscosity to change with shear rate, which distinguishes it from the Ostwald – de Waale and Shvedov – Bingham models. The target function in solving the equation of motion is the velocity distribution in the radial direction of the upward flow of the flushing fluid. The analysis of obtained solution is based on the theory of velocity profile influence on quality of cuttings removal during wellbore cleaning. Due to peculiarities of mathematical statement of the task, which supposes necessity of differential equation of motion solution, Wolfram Mathematica computational software has been used as a calculation tool. The analysis of numerical solution allowed to draw conclusions about the possibility of its application in evaluation of velocity profile when drilling fluid moves in annular space of the well. The possibility for application of modified excess coefficient as a relative quantitative parameter for evaluation of velocity profile uniformity was substantiated.

How to cite: Nikitin V.I. Problem solution analysis on finding the velocity distribution for laminar flow of a non-linear viscous flushing fluid in the annular space of a well // Journal of Mining Institute. 2022. Vol. 258 . p. 964-975. DOI: 10.31897/PMI.2022.93
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2021-12-16
  • Date accepted
    2022-04-07
  • Date published
    2022-07-13

The Upper Kotlin clays of the Saint Petersburg region as a foundation and medium for unique facilities: an engineering-geological and geotechnical analysis

Article preview

The article reviews the issues concerned with correctness of the engineering-geological and hydrogeological assessment of the Upper Kotlin clays, which serve as the foundation or host medium for facilities of various applications. It is claimed that the Upper Kotlin clays should be regarded as a fissured-block medium and, consequently, their assessment as an absolutely impermeablestratum should be totally excluded. Presence of a high-pressure Vendian aquifer in the lower part of the geological profile of the Vendian sediments causes inflow of these saline waters through the fissured clay strata, which promotes upheaval of tunnels as well as corrosion of their lining. The nature of the corrosion processes is defined not only by the chemical composition and physical and chemical features of these waters, but also by the biochemical factor, i.e. the availability of a rich microbial community. For the first time ever, the effect of saline water inflow into the Vendian complex on negative transformation of the clay blocks was studied. Experimental results revealed a decrease in the clay shear resistance caused by transformation of the structural bonds and microbial activity with the clay’s physical state being unchanged. Typification of the Upper Kotlin clay section has been performed for the region of Saint Petersburg in terms of the complexity of surface and underground building conditions. Fissuring of the bedclays, the possibility of confined groundwater inflow through the fissured strata and the consequent reduction of the block strength as well as the active corrosion of underground load-bearing structures must be taken into account in designing unique and typical surface and underground facilities and have to be incorporated into the normative documents.

How to cite: Dashko R.E., Lokhmatikov G.A. The Upper Kotlin clays of the Saint Petersburg region as a foundation and medium for unique facilities: an engineering-geological and geotechnical analysis // Journal of Mining Institute. 2022. Vol. 254 . p. 180-190. DOI: 10.31897/PMI.2022.13
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2022-01-24
  • Date accepted
    2022-04-26
  • Date published
    2023-04-25

Forecast of radionuclide migration in groundwater of the zone affected by construction drainage at the Leningrad NPP-2

Article preview

The distribution of natural (at the level of global background) and technogenic radionuclides in groundwater of the industrial zone in Sosnovy Bor town, where several nuclear power facilities are operating, was analyzed. The main technogenic radionuclides recorded in groundwater samples are cesium ( 137 Cs), strontium ( 90 Sr), and tritium isotopes. The first two aquifers from the surface are subject to contamination: the Quaternary and the upper zone of the Lomonosov aquifer. Based on extensive material on the engineering and geological studies of the work area, a 3D geological model and hydrodynamic and geomigration models of the industrial zone were constructed. By means of modeling, the extent and nature of changes in hydrogeological conditions of area resulting from the construction and operational drainage of the new stage of the Leningrad Nuclear Power Plant (LNPP-2) were determined. The “historical” halo of radioactive contamination of groundwater forming (1970-1990) at the site adjacent to the NPP, where the storage facility of low- and medium-level radioactive waste is located, falls into the zone of influence. Interpretation of monitoring data allowed obtaining the migration parameters for predictive estimates. Modeling has shown that during the time of the LNPP-2 operation there was no intake of contaminated water by the drainage system of the new power plant.

How to cite: Erzova V.A., Rumynin V.G., Nikulenkov A.M., Vladimirov K.V., Sudarikov S.M., Vilkina M.V. Forecast of radionuclide migration in groundwater of the zone affected by construction drainage at the Leningrad NPP-2 // Journal of Mining Institute. 2023. Vol. 260 . p. 194-211. DOI: 10.31897/PMI.2022.27
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2021-07-05
  • Date accepted
    2022-01-24
  • Date published
    2022-04-29

Ensuring the excavation workings stability when developing excavation sites of flat-lying coal seams by three workings

Article preview

On the basis of analysis of mining plans and field studies at mines of JSC SUEK-Kuzbass, it is shown that in conditions of increasing the size of excavation columns during the development of flat-lying coal seams the stress-strain state of the rock mass along the workings length changes significantly. The necessity of predicting the stress-strain state at the design stage of the workings timbering standards, as well as subsequent monitoring of the workings roof state and its changes in the mining operations using video endoscopes, is noted. The results of numerical studies of the stress-strain state of the rock mass during the development of excavation sites by three workings for various combinations of width of the pillars between the workings for mining-geological and mining-technical conditions of the “Taldinskaya-Zapadnaya-2” mine are provided. The stresses in the vicinity of the three workings are compared with the values obtained during the development of the excavation sites by double drift. A set of recommendations on the choice of the location of the workings, the width of pillars, timbering standards that ensure the stable condition of the workings throughout the entire service life at the minimal losses of coal in the pillars is presented.

How to cite: Kazanin O.I., Ilinets A.A. Ensuring the excavation workings stability when developing excavation sites of flat-lying coal seams by three workings // Journal of Mining Institute. 2022. Vol. 253 . p. 41-48. DOI: 10.31897/PMI.2022.1
Geology
  • Date submitted
    2021-06-08
  • Date accepted
    2021-11-30
  • Date published
    2021-12-27

Management of groundwater resources in transboundary territories (on the example of the Russian Federation and the Republic of Estonia)

Article preview

Groundwater, as a source of water supply, the most important mineral and geopolitical resource, , is often the only source of high-quality drinking water that is protected from pollution under conditions of increasing deterioration of surface water quality. Transboundary groundwaters are the focus of hydrogeological researchers for a number of reasons, including the reduction and pollution of water resources as a result of economic activities. The increased controversy between states over transboundary water issues has necessitated the development of international legal documents on issues related to water conflict prevention and the sustainable use of fresh water. As part of the analysis of the problem of legal regulation of groundwater extraction from transboundary aquifers and complexes, it is proposed to consider this aspect on the example of Russia. The problems of regulation of rational use and protection of fresh water in the bilateral treaties of the Russian Federation were revealed; a methodology for the management of groundwater extraction in the territory of the transboundary aquifer was developed, the size, parameters, and factors influencing the formation of the transboundary zone have been determined (based on research and analysis of water intake activities in the border areas of the Russian Federation and the Republic of Estonia) were determined.

How to cite: Golovina E.I., Grebneva A.V. Management of groundwater resources in transboundary territories (on the example of the Russian Federation and the Republic of Estonia) // Journal of Mining Institute. 2021. Vol. 252 . p. 788-800. DOI: 10.31897/PMI.2021.6.2
Geology
  • Date submitted
    2021-03-18
  • Date accepted
    2021-11-30
  • Date published
    2021-12-27

Deformations assessment during subway escalator tunnels construction by the method of artificial freezing of soil for the stage of ice wall formation

Article preview

The work is devoted to the study of the processes of displacement and deformation of the surface during the escalator tunnels construction of the subway by the method of artificial freezing of soils. The features of the construction and freezing technology, the rocks characteristics in which the escalator tunnels made are considered. The data of specially organized, full-scale surveying observations of deformations on the earth surface are presented. The main factors influencing deformation processes in the frozen strata of a layered inhomogeneous rock mass with inclined tunneling are determined, the complexity of the predictive task and the need to simplify the design scheme are shown. The work is focused on the assessment of the least studied geomechanical processes of soil heaving-uplifts and deformations during the periods of active and passive freezing stages. When studying the displacements processes of the earth surface and rock mass, the finite element method and analysis of the obtained data using field observations of displacements were used. A simplified calculation scheme is proposed for modeling, which allows taking into account the uneven influence of frozen rocks of an inhomogeneous layered rock mass with a large inclined tunneling. The satisfactory convergence of the data of field surveying observations on the earth surface and the results of modeling geomechanical processes for the period of active and passive freezing stages is shown. The proposed calculation scheme is recommended for the prediction of deformation at the stages of underground construction, characterized by the development of the most dangerous tensile deformations of buildings and structures on the surface.

How to cite: Volokhov E.M., Mukminova D.Z. Deformations assessment during subway escalator tunnels construction by the method of artificial freezing of soil for the stage of ice wall formation // Journal of Mining Institute. 2021. Vol. 252 . p. 826-839. DOI: 10.31897/PMI.2021.6.5
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2021-04-23
  • Date accepted
    2021-09-07
  • Date published
    2021-12-16

Development of the concept of an innovative laboratory installation for the study of dust-forming surfaces

Article preview

Currently, the determination of the emission rate of suspended solids from a unit of the surface area of a man-made mass at various parameters of the wind flow is not sufficiently described. The analysis of the world experience of researchers shows that existing laboratory installations have various design features that do not allow to correctly determine the mass of the dust being flapped and wind-blown. Based on the analysis results, the concept of an innovative laboratory installation for the study of dust-forming surfaces has been developed. It takes into account the influence of wind shadows, the deturbulization of an artificially created air flow, the possibility of regulating not only the flow velocity mode, but also the creation of a vacuum or disturbance in the area of sample placement, as well as the formation of a certain angle of wind flow attack relative to the surface. The concept provides for the possibility of determining the volume of dust emissions by the values of the lost dust masses in the sample and by the values of dust concentrations in the outgoing stream. The calculation of the main basic elements of the installation using the ANSYS FLUENT software package was carried out. The model and configuration of the wind tunnel have been developed and calculated, the main geometric parameters and functional elements for the possibility of use in scientific work have been determined. For practical use of the empirical roughness value of the underlying surface, its values are recommended in a wide range – from zero for the water surface to 0.44 for large cities with tall buildings and skyscrapers.

How to cite: Ivanov A.V., Smirnov Y.D., Chupin S.A. Development of the concept of an innovative laboratory installation for the study of dust-forming surfaces // Journal of Mining Institute. 2021. Vol. 251 . p. 757-766. DOI: 10.31897/PMI.2021.5.15
Mining
  • Date submitted
    2021-06-15
  • Date accepted
    2021-08-27
  • Date published
    2021-10-21

Prospects for the use of modern technological solutions in the flat-lying coal seams development, taking into account the danger of the formation of the places of its spontaneous combustion

Article preview

Spontaneous combustion of coal remains an important problem for coal mines, which can lead to an explosion of methane and coal dust. Accidents associated with spontaneous combustion of coal can cause significant economic losses to coal mining companies, as well as entail social damage – injuries and loss of life. Accidents are known at the Kuzbass mines, which occurred as a result of negligent attitude to the danger of spontaneous combustion of coal, the victims of which were dozens of people. The analysis of emergency situations associated with spontaneous combustion of coal shows that the existing wide range of means of preventing endogenous fires does not provide complete safety when working out coal seams prone to spontaneous combustion, therefore, spontaneous combustion places continue to occur in mines. The consequences that may arise as a result of a methane explosion initiated by a self-ignition place indicate the need to improve the used technologies. The purpose of the work is to determine the impact of modern technological solutions used in functioning mines during underground mining of flat-lying coal seams prone to spontaneous combustion, and to develop new solutions that reduce endogenous fire hazard. Conclusions on the influence of leaving coal pillars in the developed space, isolated air removal from the stoping face through the developed space, the length of the stoping face and the excavation pillar, and other factors on the danger of the formation of spontaneous combustion places are presented. Conclusions about the possibility of using modern technological solutions in future are also drawn.

How to cite: Zubov V.P., Golubev D.D. Prospects for the use of modern technological solutions in the flat-lying coal seams development, taking into account the danger of the formation of the places of its spontaneous combustion // Journal of Mining Institute. 2021. Vol. 250 . p. 534-541. DOI: 10.31897/PMI.2021.4.6
Mining
  • Date submitted
    2021-01-18
  • Date accepted
    2021-05-21
  • Date published
    2021-09-20

Improving the efficiency of the technology and organization of the longwall face move during the intensive flat-lying coal seams mining at the Kuzbass mines

Article preview

The reasons for the lag of the indicators of the leading Russian coal mines engaged in the longwall mining of the flat-lying coal seams from similar foreign mines are considered. The analysis of the efficiency of the longwall face move operations at the JSC SUEK-Kuzbass mines was carried out. A significant excess of the planned deadlines for the longwall face move during the thick flat-lying seams mining, the reasons for the low efficiency of disassembling operations and the main directions for improving the technology of disassembling operations are revealed. The directions of ensuring the operational condition of the recovery room formed by the longwall face are considered. The recommended scheme of converged coal seams mining and a three-dimensional model of a rock mass to justify its parameters are presented. Numerical studies using the finite element method are performed. The results of modeling the stress-strain state of a rock mass in the vicinity of a recovery room formed under conditions of increased stresses from the boundary part of a previously mined overlying seam are shown. The main factors determining the possibility of ensuring the operational condition of the recovery rooms are established. It is shown that it is necessary to take into account the influence of the increased stresses zone when choosing timbering standards and organizing disassembling operations at a interbed thickness of 60 m or less. A sufficient distance from the gob of above- or undermined seams was determined to ensure the operational condition of the recovery room of 50 m, for the set-up room – 30 m. Recommendations are given for improving technology and organization of the longwall face move operations at the mines applied longwall mining of flat-lying coal seams with the formation of a recovery room by the longwall face.

How to cite: Meshkov А.A., Kazanin O.I., Sidorenko A.A. Improving the efficiency of the technology and organization of the longwall face move during the intensive flat-lying coal seams mining at the Kuzbass mines // Journal of Mining Institute. 2021. Vol. 249 . p. 342-350. DOI: 10.31897/PMI.2021.3.3