Assessment of ancylite ore dressability by flotation method
For more than 50 years, most rare earth elements were extracted from carbonatite deposits, which can contain different rare earth phases, but the main extracted minerals are bastnaesite, monazite and xenotime. Many studies focused on the improvement and development of dressing circuits for ores of these minerals. However, in some carbonatite complexes, rare earth deposits are composed partly or mainly of ancylite ores. This type of rare earth ores was very poorly studied in terms of dressability – previous experiments with ancylite ores are rare and not productive enough. Ancylite is the main concentrator of rare earth elements in most carbonatite complexes of the Devonian Kola Alkaline Province (northwest Russia). Dressability of ancylite ore from the Petyayan-Vara carbonatite field in the Vuorijärvi alkaline-ultramafic complex was assessed using the flotation method. The complex is one of the most potential rare earth deposits associated with carbonatites in the Kola Region. Petrographic and mineralogical studies demonstrated the occurrence of abundant iron and barite oxide inclusions in ancylite, which imposes restrictions on physical separation of these three minerals. The study of petrogeochemical and mineralogical composition of fractions formed during mechanical grinding of ores to a size less than 2.0 mm showed that even at this stage of sample preparation, the finest-grained fractions (less than 0.071 mm) were enriched in ancylite (to 19 vol.% or more with a content of 15 vol.% in ore). Three classes of reagents were considered as collectors in flotation experiments: fatty acids, alkyl hydroxamic acids, and amino acid derivatives. The reagent from the amino acid derivative class was highly efficient. The use of such a collector in combination with sodium hexametaphosphate depressant made it possible to obtain a flotation concentrate in an open circuit with total rare earth oxides content 33.4 wt.% at 64.7 % extraction.
-
Date submitted2024-04-11
-
Date accepted2024-11-07
-
Date published2025-01-17
Thyristor booster device for voltage fluctuation reduction in power supply systems of ore mining enterprises
The article is devoted to solving the problem of voltage fluctuations in the power supply systems of ore mining enterprises. The connection of high-power consumers with abruptly variable operating mode (for example, high-voltage mining excavators) causes voltage fluctuations and sags, disabling electrical equipment, communication, and automation devices in the 6-10 kV distribution network, which disrupts technological processes, etc. The use of existing solutions and methods to reduce voltage variations caused by dynamic loads is not effective. To solve the problem, booster transformers with high-speed thyristor switches can be used to work out switching the control steps towards increasing or decreasing the voltage. The authors offer a new circuitry solution for a thyristor booster device (TBD) with a pulse-phase control method. The purpose of the research is to determine the control laws of TBD, which enable to effectively reduce voltage fluctuations from dynamic load in the power supply systems of mining enterprises. The article provides a schematic diagram of the TBD and describes the principle of operation of the device. Some modes of increasing and decreasing the output voltage of the TBD, as well as the basic mode (without voltage addition) are provided. Mathematical modeling of TBD control processes was carried out and adjustment characteristics were set taking into account the load power factor. On a simulation computer model of a 6 kV electric network with a dynamic load, the verification of the adjustment characteristics of TBD obtained during mathematical modeling was carried out. Based on the research results, the laws for regulating the output voltage of TBD were established. The TBD effective control range with normal permissible limits of odd harmonics have been determined. The conducted research will make it possible to implement the device control system.
-
Date submitted2024-05-28
-
Date accepted2024-11-07
-
Date published2024-12-25
Methods of intensification of pipeline transportation of hydraulic mixtures when backfilling mined-out spaces
The paper presents an analysis of the advantages and limitations of additional measures to intensify the transportation of the backfill hydraulic mixture flow. The results of the analysis of the conditions for using pumping equipment to move flows with different rheological properties are shown. Generalizations of the methods for influencing the internal resistance of backfill hydraulic mixtures by means of mechanical activation, as well as increasing fluidity due to the use of chemical additives are given. The article presents the results of studies confirming the feasibility of using pipes with polymer lining, which has proven its efficiency in pumping flows of hydraulic mixtures with different filler concentrations. An analytical model of hydraulic mixture movement in the pipeline of the stowage complex has been developed. The trends in pressure change required to ensure the movement of hydraulic mixture in pipelines of different diameters are exponential, provided that the flow properties are constant. The effect of particle size on the motion mode of the formed heterogeneous flow, as well as on the distribution of flow density over the cross-section, characterizing the stratification and change in the rheological properties of the backfill hydraulic mixture, is assessed. An analytical model of centralized migration of the dispersed phase of the hydraulic mixture flow is formulated, describing the effect of turbulent mixing of the flow on the behavior of solid particles. An assessment of the secondary dispersion of the solid fraction of the hydraulic mixture, which causes a change in the consistency of the flow, was performed. The studies of the influence of the coefficient of consistency of the flow revealed that overgrinding of the fractions of the filler of the hydraulic mixture contributes to an increase in the required pressure in the pipeline system.
-
Date submitted2024-05-08
-
Date accepted2024-11-07
-
Date published2024-12-12
The effect of mechanical and thermal treatment on the characteristics of saponite-containing material
Solving the problems of modern building materials science is reduced to obtaining high-quality materials, expanding and searching for a rational raw material base, which can be carried out through the use of various industrial wastes. In this paper, the possibility of using waste from the mining industry – saponite-containing material (SCM) obtained during the enrichment of kimberlite ores from the Lomonosov diamond deposit, as an active mineral additive for cement binders and concretes is considered. The influence of mechanical and thermal treatment on a number of properties of the material selected from the tailings dump and in its initial state was studied. The study of the surface activity of SCM samples consisted in determining the sorption capacity, acid-base centers and their distribution. An increase in the activity of the surface of the material particles as a result of mechanical activation and its decrease during temperature treatment were determined. These effects are associated with phase rearrangements and structural changes in the sandy-clay rock, which was confirmed during thermal analysis. The temperature effect has no pronounced effect on the microstructure, the “smoothness” of the particles and the formation of a consolidated surface of the structural elements of the saponite-containing material are noted.
-
Date submitted2024-04-12
-
Date accepted2024-09-05
-
Date published2024-11-12
Promising reagents for the extraction of strategic metals from difficult-to-enrich mineral raw materials
The need of the mining and processing industry for new types of directional reagents is due to the deterioration of the material composition of the processed ores. Low Au content (less than 0.5-1.0 g/t), finely dispersed Au inclusions (0.1-10.0 microns) in the ore, similar properties of the separated minerals have an extremely negative effect on flotation performance when using traditional reagents, which leads to significant losses of valuable metal with enrichment tailings. Expanding the range of domestic flotation reagents based on the latest achievements of fundamental research and their targeted application at mining and processing companies will compensate for the negative impact of the mineral composition of raw materials and ensure maximum extraction of strategic metals from difficult-to-enrich ores. The use of modern research methods (scanning electron and laser microscopy, UV spectrophotometry, XRF and chemical analysis) made it possible to visualize the adsorption layer of new reagents-collectors of a number of dithiocarbamates with different structures of a hydrocarbon radical and an organic modifier on the surface of gold-containing sulfides. The amount of adsorbed reagents on the surface of minerals has been experimentally determined. The specific features of the fixation of reagents on minerals of various compositions led to optimal correlations of their consumption in the flotation process. Scientifically based reagent regimes ensured an increase in the gold content in the concentrate and a decrease in the loss of gold with tailings by 5-6 % during flotation enrichment of the refractory ore of the Malinovskoe deposit.
-
Date submitted2024-10-29
-
Date accepted2024-10-29
-
Date published2024-11-12
Study of thermodynamic processes of the Earth from the position of the genesis of hydrocarbons at great depths
In the context of significant depletion of traditional proven oil reserves in the Russian Federation and the inevitability of searching for new directions of study and expansion of the raw material base of hydrocarbon raw materials in hard-to-reach regions and on the Arctic shelf, a scientific search is underway for accumulations in complex geological conditions and in manifestations that differ significantly from traditional ones, which include the processes of oil and gas formation and preservation of oil and gas in low-permeability “shale” strata and in heterogeneous reservoirs at great and super-great depths. Within the oil and gas provinces of the world, drilling of a number of deep and super-deep wells has revealed deposits at great depths, established connections between hydrocarbon deposits and “traces” of hydrocarbon migration left in the core of deep wells, which has made it possible to significantly re-evaluate theoretical ideas on the issue of oil and gas formation conditions and the search for technologies aimed at solving applied problems. Modern geochemical, chromatographic, bituminological, coal petrographic and pyrolytic methods of studying oil and bitumoids extracted from the host rocks of deep well cores give a hope for identifying correlations in the oil-source system, revealing processes that determine the possibility of hydrocarbon formation and accumulation, and defining predictive criteria for oil and gas potential at great depths.
-
Date submitted2023-07-05
-
Date accepted2024-06-03
-
Date published2024-12-25
Complete extraction of conditioned ores from complex-structured blocks due to partial admixture of substandard ores
- Authors:
- Bayan R. Rakishev
The paper presents mining-technological substantiation of complete extraction of conditioned ores from complex-structured blocks of benches by mixing a layer of substandard ores of certain sizes. The relevance of the work consists in the development of innovative methods of establishing the parameters of the substandard layer of ores to be added to the conditioned ores. The main problem is to ensure complete extraction of useful components into concentrate from shipped ore with acceptable deviations from the required ones. A new typification of complex-structured ore blocks of the bench has been carried out. Analytical dependences of mining and geological characteristics of complex-structured ore blocks were obtained. Theoretical dependences for determining the main indicators of mineral processing are derived. Analytical dependences for determination of the content of useful component in shipped ore α' – mixture of conditioned ore with the content of useful component α and admixed layer of substandard ore with the content of useful component α'' are offered. For the first time in mining science, a new approach of complete extraction of conditioned ores from complex-structured blocks of benches by grabbing a certain part of substandard ores during excavation, increasing the volume of extracted ore and expanding the extraction of useful components in the concentrate has been substantiated. The increment of useful components can reach 10-15 % of the total volume of extraction, which allows predicting a significant increase in the completeness of mineral extraction from the Earth's interior.
-
Date submitted2023-03-01
-
Date accepted2024-06-03
-
Date published2025-02-25
Lamprophyres of the Peshchernoe gold deposit, their geological position, material composition, and metasomatic alterations (Northern Urals)
The article presents the first data on biotite-hornblende lamprophyres discovered at the Peshchernoe gold deposit. We consider the geological position of lamprophyre dikes in the deposit structure and the relationship of these rocks with tectonically weakened and mineralized zones. The data on the structural position of mineralized zones, faults, dike bodies, metasomatic halos, and host volcanogenic-sedimentary rocks confirm the tectonic nature of the Peshchernoe deposit alteration system. Lamprophyre dikes are pre-ore, as evidenced by the superimposed metasomatic mineral associations. We assume that dikes of andesitic rocks, lamprophyres, and subsequently hydrothermal fluids, including ore-bearing ones, were intruded along the fault zone of northeastern strike at different geological times. The description of mineralogical and chemical transformations of lamprophyres, which occurred as a result of alteration, is given. Two stages of metasomatism are distinguished: carbon dioxide (beresitization-listvenitization) and subsequent alkaline (sodic metasomatism). During carbon dioxide metasomatism, dark-coloured minerals are replaced by chlorite, albitization and sericitization of plagioclase occur, and ferruginous dolomite is formed under the influence of a significant supply of CO2. Alkaline (sodic) metasomatism is superimposed on the mineral metasomatic paragenesis of the first stage. We consider metasomatic zoning during sodic metasomatism, manifested in one of the spessartite dikes. Chlorite and relics of magmatic dark-coloured minerals are replaced by magnesite, the supply of Na leads to the appearance of newly formed albite, and the supply of S leads to the formation of pyrite, which concentrates iron from other minerals. As a result of the sodic metasomatism, iron content in carbonates decreases in the direction from the outer metasomatic zone to the inner one. We conclude that it was the alkaline-sulphide sodium solutions that performed the ore-bearing function, and beresitization and listvenitization prepared a favourable environment for ore deposition.
-
Date submitted2023-06-21
-
Date accepted2023-10-25
-
Date published2024-08-26
Specific action of collector from phosphoric acid alkyl esters class in flotation of apatite-nepheline ores
Increasing amount of apatite-nepheline ores with complex mineral composition involved in processing, growing content of the associated minerals in ore which are similar in their floatability to apatite lead to the necessity of using highly selective collectors. Non-frothing flotation method gave a comparative assessment of floatability of pure minerals and demonstrated a high selectivity of the action of phosphoric acid esters in relation to apatite. The effect of four reagent modes differing in the number of selective synthetic collectors was studied using the example of flotation of an apatite-nepheline ore sample containing 17.27 % apatite and 40.18 % nepheline. Mineralogical analysis of crushed ore showed that it contained two apatite varieties – coarse-grained free and finer poikilitic as inclusions in rock-forming minerals. Free apatite opens and occurs as open grains even in coarse-grained (+0.16 mm) grades. Poikilitic apatite occurs as intergrowths with different minerals, mainly with nepheline and its alteration products (natrolite, spreustein, sodalite, etc.), and pyroxene. Optical microscopy demonstrated that a growing share of reagent from the phosphoric acid oxyethylated esters class in the composition of the collector mixture allows improving the quality of the produced apatite concentrates by reducing the number of apatite intergrowths with nepheline and pyroxenes in the concentrates. In the concentrate obtained in the most selective reagent mode, the intergrowths are characterized by a 50/50 and higher ratio in favour of apatite. Concentrates of lower quality comprised intergrowths with lower apatite content, to 20/80 or less.
-
Date submitted2024-04-11
-
Date accepted2024-06-03
-
Date published2024-07-04
Assessment of the efficiency of acid mine drainage purification (using the example of copper-pyrite mines in the Middle Urals)
According to the results of the anti-rating of regions with extreme pollution of watercourses in the Sverdlovsk region, the largest number of polluted rivers has been recorded in recent years – more than a quarter of all high and extremely high pollution. One of the sources of pollution of natural water bodies in the Middle Urals are closed and flooded copper-pyrite mines, where acidic mine drainage continue to form and unload to the surface. Several of them have organized collection and a two-stage acidic drainage purification system, including neutralization with lime milk and settling in a clarifier pond. Despite the identical schemes, different indicators of pollutants are recorded during discharge into water bodies. The aim of the work is to evaluate the effectiveness of the applied acid mine drainage purification system and identify the parameters affecting the quality of treated mine water. Laboratory studies were performed using methods of flame emission spectrometry, flame atomic absorption, atomic absorption spectrometry, mass spectrometry with ionization in inductively coupled plasma, potentiometric, etc. It has been established that the existing mine drainage purification system at the Degtyarskii mine makes it possible to significantly reduce the concentrations of most toxic components of mine waters to almost standard values. At the Levikhinskii mine, the multiplicity of exceeding the maximum permissible concentrations reaches hundreds and thousands of times. To achieve a higher degree of purification, it is necessary that the duration of passive purification is sufficient for the reactant to interact with acidic waters. However, to ensure this possibility, it will require the creation of a cascade of ponds with an area of several thousand hectares. If the current two-stage system is quite effective for the Degtyarskii mine, then for Levikhinskii it is necessary to switch to the use of more modern systems, including three stages of purification.
-
Date submitted2024-05-02
-
Date accepted2024-06-03
-
Date published2024-07-04
Iron ore tailings as a raw material for Fe-Al coagulant production
The paper presents the results of experimental research into the recovery of Fe-Al coagulant from iron ore tailings (IOTs). The variables investigated in the laboratory tests included sulphuric acid concentration, temperature, leaching time, solid/liquid phase ratio (S:L) and the presence of stirring. The experiment determined the composition of the coagulant and the solid residue after leaching. The maximum iron content in the solution after leaching was obtained using 40 % H2SO4 at a temperature of 100 °C (or with stirring at 75 °C) and a contact time of 60 minutes. In this case, the iron yield was at the level of 25 % of the total content in the iron ore tailings. Chemical analysis of the solution obtained after leaching showed Fe and Al sulphate contents of 11 and 2 % respectively. In the next step, the efficiency of the coagulant was evaluated on model solutions of colour. The experimental results showed that the coagulant obtained from the iron ore tailings can be used for wastewater treatment in a wide pH range from 4 to 12 pH units. The solid residue after leaching is a fine-grained powder rich in silica, which can potentially be used as an artificial raw material in the construction industry. The research carried out in this thesis has shown that the extraction of coagulants from iron ore tailings can be considered as a way to extend the production chain of iron ore mining and to minimise the amount of tailings to be stored in tailing ponds. The technical solution presented in this work allows to comprehensively solve the problem of environmental protection by creating new target products for wastewater treatment from IOTs.
-
Date submitted2023-07-25
-
Date accepted2024-05-02
-
Date published2024-08-26
Finite element analysis of slope failure in Ouenza open-pit iron mine, NE Algeria: causes and lessons for stability control
Slope failures in mining engineering pose significant risks to slope stability control, necessitating a thorough investigation into their root causes. This paper focuses on a back analysis of a slope failure in the Zerga section of the Ouenza – Algeria open-pit iron mine. The primary objectives are to identify the causes of slope failure, propose preventive measures, and suggest techniques to enhance stability, thereby providing crucial insights for monitoring slope stability during mining operations. The study commenced with a reconstruction of the slopes in the affected zones, followed by a numerical analysis utilizing the Shear strength reduction method within the Finite element method (SSR-FE). This approach enables the examination of slope stability under both static and dynamic loads. The dynamic load assessment incorporated an evaluation of the vibrations induced by the blasting process during excavation, introducing seismic loading into the finite element analysis. The findings reveal that the primary triggering factor for the landslide was the vibration generated by the blasting process. Furthermore, the slope stability was found to be critically compromised under static loads, highlighting a failure to adhere to exploitation operation norms. The challenging geology, particularly the presence of marl layers where maximum shear strain occurs, contributed to the formation of the landslide surface. The study not only identifies the causes of slope failure but also provides valuable lessons for effective slope stability management in mining operations.
-
Date submitted2023-05-31
-
Date accepted2023-12-27
-
Date published2024-04-25
Velocity structure of the Earth’s crust and upper mantle in the Pechenga ore region and adjacent areas in the northwestern part of the Lapland-Kola orogen by the receiver function technique
- Authors:
- Andrei G. Goev
The article presents a study of the Earth’s crust and upper mantle in the Pechenga ore region, as well as areas adjacent to it in the northwestern part of the Kola region. Applying the receiver function technique to data acquired by three broadband seismic stations, we obtained one-dimensional seismic velocity distribution models to a depth of 300 km. The stations are located in the northern parts of Finland and Norway, as well as in the Pechenga region of the Russian Federation. Despite the stations being in relatively close proximity (within 100 km of each other), the velocity models turned out to be significantly different, which indicates structural discontinuity within the lithosphere. Thus, Finland station data set revealed a gradient crust-mantle transition, which is not present in the other two models. At depths of about 150 km, a low-velocity zone was discovered, associated with mid-lithospheric discontinuity, which was not found beneath the Pechenga ore region. Furthermore, the crustal structure of the Pechenga region has an anomalously high Vp/Vs ratio to a depth of about 20 km. Considering the fact that the Pechenga (Nikel) seismic station was installed in close proximity to major copper-nickel deposits, this anomaly can be interpreted as a relic of Proterozoic plume activity.
-
Date submitted2023-08-02
-
Date accepted2023-12-27
-
Date published2024-04-25
Justification of the approaches to improve management strategy of the mining system based on the analysis of data on the mining of complex structural rock blocks
Long-term activity of mining enterprises causes the necessity to substantiate the strategies of management of the mining and technical system functioning in terms of improvement of ore quality control, which is determined by its change in the course of field development due to the priority development of the main reserves and, as a consequence, forced transition to the mining of complex structural rock blocks with a decrease in the recovery percentage, which is typical in case the ore component meets the requirements of the feasibility study in terms of grade at substandard capacity. In this case, it is possible to identify the recovery percentage and the potential for its increase by analyzing the long-term activity of the mining and industrial enterprise, namely, by analyzing the data of mining complex structural rock blocks with the subsequent establishment of the relationship between the primary data on mining and geological conditions and information on the quality of the mineral obtained from the technological equipment. Therefore, the purpose of the research was to substantiate the necessity of improving the management strategy of the mining-technical system functioning, which consists in the fact that on the basis of analyzing the mining data of complex structural rock blocks it is possible to determine the ore mass losses and their quantity and to lay the basis for the development of decisions on its extraction. For this purpose, the collected data on the mining of complex structural rock blocks, accounting the geological and industrial type of extracted ores, were considered in modeling the conditions and studying the parameters of technological processes, the implementation of which provides additional products. It was revealed that the ore mass from substandard thickness layers is delivered to the dumps, and ore mass losses have been estimated at 25-40 % per year. It is proved that determination of ore mass losses based on the analysis of data on mining of complex structural rock blocks, as well as timely solution of this issue can significantly increase the production efficiency of mining and technical system. Taking into account for the results obtained, the options for optimizing the production of the mining and engineering system were proposed.
-
Date submitted2023-03-14
-
Date accepted2023-10-25
-
Date published2024-04-25
Predictive assessment of ore dilution in mining thin steeply dipping deposits by a system of sublevel drifts
The purpose of research is the study of stress-strain state of marginal rock mass around the stope and predictive assessment of ore dilution with regard for changes in ore body thickness in mining thin ore deposits on the example of the Zholymbet mine. Study of the specific features of the stress-strain state development was accomplished applying the methodology based on numerical research methods taking into account the geological strength index (GSI) which allows considering the structural features of rocks, fracturing, lithology, water content and other strength indicators, due to which there is a correct transition from the rock sample strength to the rock mass strength. The results of numerical analysis of the stress-strain state of the marginal part of the rock mass using the finite element method after the Hoek – Brown strength criterion made it possible to assess the geomechanical state in the marginal mass provided there are changes in ore body thickness and to predict the volume of ore dilution. It was ascertained that when mining thin ore deposits, the predicted value of ore dilution is influenced by the ore body thickness and the GSI. The dependence of changes in ore dilution values on the GSI was recorded taking into account changes in ore body thickness from 1 to 3 m. Analysis of the research results showed that the predicted dimensions of rock failure zone around the stopes are quite large, due to which the indicators of the estimated ore dilution are not attained. There is a need to reduce the seismic impact of the blasting force on the marginal rock mass and update the blasting chart.
-
Date submitted2021-04-15
-
Date accepted2022-09-06
-
Date published2023-10-27
Gold-rare metal and associated mineralization in the western part of Bolshevik Island, Severnaya Zemlya archipelago
The presented studies are aimed to determine the formation patterns of the gold-rare metal mineralization within one of the most inaccessible Arctic islands of the Russian Federation, Bolshevik Island of the Severnaya Zemlya archipela-go. The relevance of the work is determined by the high probability of discovering a significant in terms of metal reserves deposit, which is proved by many researchers on the example of known large deposits to be a typical feature of sites with gold-rare metal formation. Obviously, only the possibility of discovering and subsequent development of a deposit of a highly liquid type of mineral, gold, can ensure the profitability of mining production on Severnaya Zemlya. It is established that the main geological, mineralogical, and geochemical features of the gold-rare metal mineralization in the Kropotkinsko-Nikitinskaya metallogenic zone of Bolshevik Island correspond to that of similar ore sites in Russia and the world. The occurrences of other formation types revealed in this metallogenic zone suggest a certain zoning in their distribution: mineralization is located in the apical parts of granitoids and in the nearest halo of hornfelses. At a distance, with an exit from the hornfelsed zone, there are occurrences of a cassiterite-sulphide formation with elevated gold and silver content at the top of the ore column, together with an increased amount of polymetallic ores. Occurrences of gold-quartz and gold-sulphide-quartz formations are localized in fault zones, as a rule, farther from granitoids. The total vertical range of gold mineralization exceeds 300 m. The assignment of all types of mineralization in the Kropotkinsko-Nikitinskaya metallogenic zone of Bolshevik Island to a single hydrothermal process is emphasized by the similar isotope composition of lead galena from heterogeneous occurrences, which determines the age of all mineralization at 200-300 Ma.
-
Date submitted2023-03-14
-
Date accepted2023-06-20
-
Date published2023-07-19
The wireless charging system for mining electric locomotives
The electric vehicles development has a high potential for energy saving: an energy-saving traffic control can reduce energy resource consumption, and integration with the power grid provides the ability of daily load pattern adjustment. These features are also relevant for underground mining. The critical element of vehicle-to-grid integration is the charging infrastructure, where wireless charging is promising to develop. The implementation of such systems in underground mining is associated with energy efficiency issues and explosion safety. The article discusses the development and research of a wireless charging system for mining electric locomotive A-5.5-600-U5. The analytic hierarchy process is used for justification of the circuitry and design solution by a comparison of different technical solutions based on energy efficiency and safety criteria. A complex computer model of the wireless charging system has been developed that gives the transients in the electrical circuit of a wireless charging system and the high-frequency field density distribution near the transmitting and receiving coils in a 3D setting. An approach to ignition risk evaluation based on the analysis of high-frequency field density in the charging area between the coils of the wireless charging system is proposed. The approach using a complex computer model is applied to the developed system. The study showed that the wireless charging system for mining electric locomotives operating in the gaseous-and-dusty mine is technically feasible and there are designs in which it is explosion safe.
-
Date submitted2023-01-12
-
Date accepted2023-06-20
-
Date published2023-07-19
Improvement of energy efficiency of ore-thermal furnaces in smelting of alumosilicic raw materials
The issues of energy saving in pyrometallurgical production during processing of mineral raw materials in ore-thermal furnaces are particularly important for the development of new energy-efficient technologies. The reduction of the specific power consumption during melting at different stages of heating and melting of charge materials when modeling is related to obtaining kinetic curves in the process of kyanite concentrate regeneration in polythermal conditions. Based on practical data of carbo-thermal reduction the mathematical modeling of reduction processes from alumosilicic raw materials – kyanite was carried out. In this work, the nonisothermal method based on a constant rate of charge heating (i.e. a linear dependence between time and temperature) was used for the reduction of kyanite charge, which saves electrical energy. The experiments were carried out on a high-temperature unit with a heater placed in a carbon-graphite crucible. Based on the obtained kinetic dependences of nonisothermal heating of enriched kyanite concentrates in plasma heating conditions we obtained a number of kinetic anamorphoses of the linear form which point to the possibility of describing the reaction rate using the modified Kolmogorov – Erofeev equation for given heating conditions and within a narrow temperature range. The complex of mathematical modeling makes it possible to create a control algorithm of technological process of reduction of kyanite concentrate to a metallized state within the specified temperature range for the full flow of reaction exchange and to reduce the specific power consumption by 15-20 %. With the help of the received kinetic dependences, taking into account the thermodynamics of processes and current state of the art it is possible to create a universal thermal unit for the optimal carbothermal reduction of charge to a metallized state (alloy) with minimum power inputs compared to existing technologies.
-
Date submitted2022-10-28
-
Date accepted2023-03-02
-
Date published2023-04-25
Assessment of the possibility of using iron-magnesium production waste for wastewater treatment from heavy metals (Cd2+, Zn2+, Co2+, Cu2+)
Relevant problems associated with treatment of industrial wastewater from heavy metal ions are considered. Due to industrial development, the amount of wastewater increases as well as the risks of heavy metals getting into surface and groundwater, accumulating in water bodies and becoming aggressive environmental pollutants, which affect the animal and human organisms. To assess the possibility of extracting metal ions (Cd 2+ , Zn 2+ , Co 2+ , Cu 2+ ) from industrial wastewater and their further treatment, studies were carried out on redistribution of heavy metals in the “wastewater – waste” system using iron-magnesium production waste. Samples of the investigated waste weighing 0.1; 0.2; 0.5; 1; 1.5; 2 g were taken for wastewater volume of 50 ml per each subsample. Contact time varied from 5 to 180 min, waste fraction was 1 mm. The interaction process showed that the waste efficiently removes metal ions (Cd 2+ , Zn 2+ , Co 2+ , Cu 2+ ) from industrial wastewater. The efficiency of removing a pollutant from the solution depends on the weight of the waste subsample, initial concentration of metal ions, and contact time.
-
Date submitted2022-01-21
-
Date accepted2022-11-14
-
Date published2023-08-28
Strategy of mine ventilation control in optimal mode using fuzzy logic controllers
- Authors:
- Aleksei V. Kashnikov
- Yuri V. Kruglov
The issues related to improving the efficiency of automatic ventilation control systems of mines that regulate the air supply to the mine in accordance with the need are considered. During the tests of such a system in the 3RU mine of OAO Belaruskali, the shortcomings of its existing, implementation, associated with the incorrect choice of the most difficult-to-ventilate direction, were revealed. The possibilities of implementing a control strategy, in which the system automatically determines the optimal configuration of the operating modes of fans and regulators, are demonstrated. As an alternative to the implemented algorithms, it is proposed to use a fuzzy control device to account for the nonlinearity of the dependence of the input and output parameters of ventilation equipment and to set the conditions for the optimal operating mode of the system in a declarative form. To assess the effectiveness of the proposed approach, the data of simulation modeling of the current ventilation mode and the transition from one ventilation mode to another are analyzed with comparison with the actual data of the system operation. The simulation results show that the use of an upgraded control scheme for the main ventilation fan based on fuzzy logic in the implementation of automatic ventilation control systems makes it possible to eliminate the possibility of a shortage of fresh air in the regulated directions of its movement, as well as excessive power consumption of the main ventilation fan.
-
Date submitted2022-10-17
-
Date accepted2023-02-13
-
Date published2023-04-25
Environmental geotechnology for low-grade ore mining with the creation of conditions for the concurrent disposal of mining waste
Due to the constantly deteriorating environmental situation in the regions with mining enterprises, the article considers the topical issue of disposing the maximum possible volume of waste from the mining and processing of low-grade ferrous ores through the creation of an effective underground environmental geotechnology. Traditional procedure with descending mining of reserves with a caving system does not allow waste to be disposed of in a gob. The idea is to use geotechnology based on the ascending order of mining the ore body, room excavation, leaving truncated pillars, and staggered arrangement of adjacent rooms in height, which makes it possible to form containers for waste disposal in the form of a cementless backfill. The main characteristics of the proposed procedure are investigated and compared with the traditional procedure of low-grade iron ores mining. It was established that from the point of view of the complete extraction of reserves and the unit costs for the preparatory-development operations, the processes are comparable, while in terms of the mining quality, the proposed option is much more efficient. Evaluation of environmental geotechnology by the criterion of waste disposal, performed according to the proposed methodology, showed that the combination of these technical solutions ensures the placement in the formed gob from 80 to 140% of all waste generated during the mining and beneficiation of low-grade iron ores.
-
Date submitted2022-05-06
-
Date accepted2022-11-17
-
Date published2023-02-27
Comprehensive study of filtration properties of pelletized sandy clay ores and filtration modes in the heap leaching stack
There are the results of a study of the factors determining the formation and changes in the filtration properties of a heap leaching stack formed from pelletized poor sandy-clay ores. An analysis of methods of investigation of filtration properties of ore material for different stages of heap leaching plots functioning is carried out. Influence of segregation process during stack dumping on formation of zones with very different permeability parameters of ore has been established by experimental and filtration works. The construction and application of a numerical model of filtration processes in pelletized ores based on laboratory experiments is shown. By means of solution percolation simulation at different irrigation intensities the justification of optimal stack parameters is provided in terms of the geomechanical stability and prevention of solution level rise above the drainage layer.
-
Date submitted2022-06-09
-
Date accepted2022-11-17
-
Date published2022-12-29
Drilling of deep and ultra-deep wells for prospecting and exploration of new raw mineral fields
Scientific and technological progress over the last century has led to an enormous increase in the consumption of minerals, including energy resources. Most of the exploited oil and gas fields are already considerably depleted, so it is necessary to search for new hydrocarbon resources, particularly at great depths. Deep drilling plays a special role in solving this problem. The article considers the world and Russian experience of ultra-deep wells drilling. The methods and technologies used in the construction of wells, as well as complications and accidents occurring during their drilling were analyzed. The analysis revealed that the existing limitations for drilling parameters of deep and ultra-deep wells are caused by the technical characteristics of surface and bottomhole drilling equipment, which do not meet the extreme drilling conditions. The directions for development of deep and ultra-deep well drilling machinery and technologies are suggested. The notion of extreme rock and geological drilling conditions is introduced, which describes drilling in conditions of hydrostatic pressure of flushing fluid column and high bottomhole temperature both at stable and unstable wellbore conditions, coming close to the upper limit of operating technical characteristics of bottomhole assembly, the drill string and flushing fluid.
-
Date submitted2022-04-05
-
Date accepted2022-07-21
-
Date published2022-11-10
Development of resource-saving technology for excavation of flat-lying coal seams with tight roof rocks (on the example of the Quang Ninh coal basin mines)
- Authors:
- Vladimir P. Zubov
- Le Quang Phuc
It is shown that the creation of the variants of resource-saving systems for the development of long-column mining is one of the main directions for improving the technological schemes for mining operations in the mines of the Kuang Nin coal basin. They provide a reduction in coal losses in the inter-column pillars and the cost of maintaining preliminary workings fixed with anchorage. The implementation of these directions is difficult (and in some cases practically impossible) when tight rocks are lying over the coal seam, prone to significant hovering in the developed space. In the Quang Ninh basin, 9-10 % of the workings are anchored, the operational losses of coal reach 30 % or more; up to 50 % of the workings are re-anchored annually. It is concluded that the real conditions for reducing coal losses and the effective use of anchor support as the main support of reusable preliminary workings are created when implementing the idea put forward at the St. Petersburg Mining University: leaving the coal pillar of increased width between the reused mine working and the developed space and its subsequent development on the same line with the stoping face simultaneously with the reclamation of the reused mine working.
-
Date submitted2022-02-22
-
Date accepted2022-05-11
-
Date published2022-11-03
Scientific substantiation and development of innovative processes for the extraction of zirconium and rare earth elements in the deep and comprehensive treatment of eudialyte concentrate
- Authors:
- Valentin A. Chanturiya
Based on a package of modern analysis methods, the influence of various acids and energy effects on the morphology, elemental composition, structural and chemical transformations of the mineral surface, and the efficiency of eudialyte concentrate leaching was studied. The mechanism and the optimal conditions and specific features of the destruction of eudialyte and rock minerals and the extraction of zirconium and REE under the influence of various acids, powerful nanosecond pulses, dielectric barrier discharge, electrochemical processing, mechanochemical activation and ultrasound were revealed. The mechanism of formation and the optimal conditions for the dispersion of silica gel, depending on the methods and parameters of energy effects, was theoretically and experimentally substantiated. A combined three-stage circuit of nitric acid leaching of eudialyte concentrate with ultrasonic treatment of the suspension, providing 97.1 % extraction of zirconium and 94.5 % REE, were scientifically substantiated and tested. The conditions for the selective deposition of zirconium and REE were theoretically and experimentally substantiated.