Submit an Article
Become a reviewer
emerging sources
citation index
clarivate analytics
citescore
5.4
scopus

Vol 198

Previous
Vol 197
Innovation in designing of mining plants
  • Date submitted
    2011-10-24
  • Date accepted
    2011-12-24
  • Date published
    2012-04-01

Optimization of protective pillars parameters of mine shafts at the ore mines of OJSC «MMK «Norilsk Nickel»

Article preview

The Article presents the results of long-term investigations of the problem concerning the protection of shafts with pillars of reduced sizes under conditions of the Talnakh and Oktiabrsky deposits. The principal potentiality of partial mining of shaft-bottom pillars VS-3 and GS has been proved at the Oktiabrsky ore mine. Certain recommendations are given on optimization of parameters of shaft-bottom protective pillars.

How to cite: Zuev Y.I., Zelentsov S.N., Kuznetsova E.I., Zvezdkin V.A., Karelin V.N. Optimization of protective pillars parameters of mine shafts at the ore mines of OJSC «MMK «Norilsk Nickel» // Journal of Mining Institute. 2012. Vol. 198. p. 7.
Innovation in designing of mining plants
  • Date submitted
    2011-10-24
  • Date accepted
    2011-12-21
  • Date published
    2012-04-01

Feasibility study of optimal parameters of pillars in designing rockburst-hazardous ore deposits development

Article preview

The safe parameters of temporary interchamber pillars have been determined for the chamber-and-pillar method with ore discharge on trenches in designing of underground mining  of the Koashva apatite-nepheline deposit. The results of calculation of economical efficiency of comparable parameters are presented. It was substantiated that the economical efficiency of application of the chamber-and-pillar method up to the depth of 800 m is related to the increase of natural yielding of interchamber pillars.

How to cite: Sidorov D.V., Ponomarenko T.V. Feasibility study of optimal parameters of pillars in designing rockburst-hazardous ore deposits development // Journal of Mining Institute. 2012. Vol. 198. p. 11.
Innovation in designing of mining plants
  • Date submitted
    2011-10-20
  • Date accepted
    2011-12-02
  • Date published
    2012-04-01

Experience in expert systems application for estimation of stress- strain state of rock mass for selection of safe methods of ore deposits mining

Article preview

The method of successive geomechanical estimation of stress-strain state of rock mass at different scale levels was developed. This method allows to carry out the regional and local prediction of formation of stress concentrated zones, and also to develop and adopt technology, which provides the decrease of dynamic rock pressure manifestations and rock burst prevention at mineral deposits.

How to cite: Kozyrev A.A., Panin V.I., Semenova I.E. Experience in expert systems application for estimation of stress- strain state of rock mass for selection of safe methods of ore deposits mining // Journal of Mining Institute. 2012. Vol. 198. p. 16.
Innovation in designing of mining plants
  • Date submitted
    2011-10-25
  • Date accepted
    2011-12-06
  • Date published
    2012-04-01

Science-based procedural guidelines for coalmine methane drainage under conditions of higly gas-bearing seam intensive mining

Article preview

Efficient Production of coal faces and safety of coal mining in relation to gas content while mining the highly gas-bearing coal seams shall be provided by using the highly efficient drain-age and clearing means of the coalmine methane emission sources. In order to provide efficient basis for decision making and validating of technical solutions while designing the coalmine drainage systems there have been developed the Technical Regulations for Methane Extraction and Recovery under conditions of active highly gas-bearing seam mining. These Technical Regulations were successfully tested in course of process design of the coalmine methane drain- age systems for Kirov and Kotinskaya Mines owned by SUEK-Kuzbass.

How to cite: Artemev V.B., Ruban A.D., Zakharov V.N., Zaburyadev V.S. Science-based procedural guidelines for coalmine methane drainage under conditions of higly gas-bearing seam intensive mining // Journal of Mining Institute. 2012. Vol. 198. p. 24.
Innovation in designing of mining plants
  • Date submitted
    2011-10-04
  • Date accepted
    2011-12-25
  • Date published
    2012-04-01

Substantiation of techniques and methods of technogeneous deposits forming represented by rock refuse and waste rock dumps at open pit mining

Article preview

There are large waste rock dumps and uneconomical ore storages when open pit mining is used. Mining companies must create these dumps and storages observing special rules, if mineral deposits might be utilized in future. The technological properties of ores and rocks as  well as the conditions of forming and storage should be taken  into consideration. It is possible to reach high productive efficiency if the market will demand these commodities.

How to cite: Reshetnyak S.P., Arkhipov A.V. Substantiation of techniques and methods of technogeneous deposits forming represented by rock refuse and waste rock dumps at open pit mining // Journal of Mining Institute. 2012. Vol. 198. p. 30.
Innovation in designing of mining plants
  • Date submitted
    2011-10-07
  • Date accepted
    2011-12-16
  • Date published
    2012-04-01

Experience in ore reserves extraction in open-pit borders and bottom in transition from open-pit to underground mining

Article preview

The article presents the results of industrial-experimental tests of technology for extraction of open-pit border and bottom reserves of copper sulphide ores under different conditions at ore mines of OJSC «Uchalinsk MDK». Description is given to the technology of extraction of border reserves at the Sibay under- ground ore mine with the use of the open chamber with ore discharge through underground workings, as well as to the order of ore reserves extraction at the Uchalinsk underground ore mine.

How to cite: Tankov M.S., Shelkovyi I.S. Experience in ore reserves extraction in open-pit borders and bottom in transition from open-pit to underground mining // Journal of Mining Institute. 2012. Vol. 198. p. 37.
Innovation in designing of mining plants
  • Date submitted
    2011-10-22
  • Date accepted
    2011-12-03
  • Date published
    2012-04-01

Scientific provision of disigning mineral deposit mining

Article preview

The modern approach of OJCS «Uralmekhanobr» to publication  of design  documentation on a new level of designing with the use of state-of-the-art information technologies, scientific potential in technology concepts is  presented. A number of specific innovations of specialists being realized in practice in  extraction  of ore reserves at several ore mines is  given.

How to cite: Kotenkov A.V., Kharisov I.G. Scientific provision of disigning mineral deposit mining // Journal of Mining Institute. 2012. Vol. 198. p. 43.
Innovation in designing of mining plants
  • Date submitted
    2011-10-29
  • Date accepted
    2011-12-26
  • Date published
    2012-04-01

Problem solving of design and planning of open pit mining in Mineframe system

Article preview

The article presents the results of development for computer-aided design and planning of open-pit mines with the Mineframe software. There have been shown such peculiarities of computer-aided planning process as horizon reserves, development of annual cutbacks, searching of quarterly (monthly) volumes, monthly scheduling of equipment operation placed on benches, solution of the problems of ten-day periods, daily and shifts planning based on bench modeling.

How to cite: Nagovitsyn O.V., Lukichev S.V., Alisov A.Y. Problem solving of design and planning of open pit mining in Mineframe system // Journal of Mining Institute. 2012. Vol. 198. p. 49.
Innovation in designing of mining plants
  • Date submitted
    2011-10-18
  • Date accepted
    2011-12-02
  • Date published
    2012-04-01

Peculiarities of prof. S.D.Korobov’s algorithm appliance in open-pit boundaries determination and mining operation regime justification

Article preview

System of embedded contours applied in computer-aided mining-geometrical analysis is appropriate both for open-pit boundaries determination and for optimal advance direction with justification of mining operation regime.

How to cite: Bilin A.L. Peculiarities of prof. S.D.Korobov’s algorithm appliance in open-pit boundaries determination and mining operation regime justification // Journal of Mining Institute. 2012. Vol. 198. p. 55.
Innovation in designing of mining plants
  • Date submitted
    2011-10-01
  • Date accepted
    2011-12-23
  • Date published
    2012-04-01

Mechanizатion of steep thick coal seams working

Article preview

  This article presents the data concerning application of techniques and technologies  in mining steep thick coal seams both in domestic mines and abroad. The preference is given to application of mechanized complexes with partings output. The article gives the description of research tasks. The description of flat stand for modeling from equivalent materials and mining technologies with the use of moving drifts complex is also  presented.

How to cite: Kozhukhov L.F., Struk K.V. Mechanizатion of steep thick coal seams working // Journal of Mining Institute. 2012. Vol. 198. p. 61.
Innovation in designing of mining plants
  • Date submitted
    2011-10-13
  • Date accepted
    2011-12-17
  • Date published
    2012-04-01

Reflectionless observation technique of deforming edges of open-pit mines and spoil dumps

Article preview

Application of laser scanning for shooting procedure of open-pit mines’ edges and spoil dumps deformations is offered. The results of traditional observations and measurements obtained with the help of the offered technique are compared. Practical implementation in industrial objects is considered.

How to cite: Koltsov P.V. Reflectionless observation technique of deforming edges of open-pit mines and spoil dumps // Journal of Mining Institute. 2012. Vol. 198. p. 65.
Innovation in designing of mining plants
  • Date submitted
    2011-10-02
  • Date accepted
    2011-12-18
  • Date published
    2012-04-01

Innovative technologies in disigning of mining enterprises

Article preview

At present, the principal instrument in designing and basic means providing the interaction of participants of the innovation process appear to be the innovations on the base of information technologies. Each working place of a designer is equipped with necessary technical and software facilities, allowing to create the common corporative information System of Automated Designing. The author suggests the algorithm for implementing into practice achievements of Russian engineering companies of modern applied information systems. An example is given of completion of items of sections of «Regulations for  underground mining method  of near–bank side and sub-quarry reserves of the Koashva deposit of OJSC "Apatit"» with the application of modern specialized computer geological-and-mining  systems.

How to cite: Sedykh G.Y. Innovative technologies in disigning of mining enterprises // Journal of Mining Institute. 2012. Vol. 198. p. 70.
Innovation in designing of mining plants
  • Date submitted
    2011-10-30
  • Date accepted
    2011-12-06
  • Date published
    2012-04-01

Calendar planning in present-day geological and mining systems

Article preview

The article describes the principles of the calendar planning in the present-day geological-and-mining systems of the open-pit and underground mining. At present, a set of tasks was outlined being solved with using these systems at ore mining plants and design companies. A common approach to data preparation for the calculation of a calendar plan in the open pit and underground mining is described, including the determination of geological, technological and economical parameters to obtain the co-variant results of calculations. The advantages of introduction of geological-and-mining systems into the field of designing work are shown.

How to cite: Bagateev R.A. Calendar planning in present-day geological and mining systems // Journal of Mining Institute. 2012. Vol. 198. p. 75.
Innovation in designing of mining plants
  • Date submitted
    2011-10-22
  • Date accepted
    2011-12-06
  • Date published
    2012-04-01

Geomechanic assessment of technological decisions for designing mining operations in of burst hazrdous conditions

Article preview

Regularities of forming of strained – deformed state in elements of designed variants of systems of development on various mining stages for Nikolaevskoe and Yuzhnoe polymetallic deposits are determined on the results of numerical modeling. Analysis of technogeneous stress field made it possible to discover some potential burst-hazardous sections of the rock massif and  to substantiate effective rock pressure decreasing measures for preventing dynamic rock  pressure occurrences.

How to cite: Rasskazov I.Y., Kursakin G.A., Potapchuk M.I., Rasskazov M.I. Geomechanic assessment of technological decisions for designing mining operations in of burst hazrdous conditions // Journal of Mining Institute. 2012. Vol. 198. p. 80.
Innovation in designing of mining plants
  • Date submitted
    2011-10-19
  • Date accepted
    2011-12-13
  • Date published
    2012-04-01

Designing of complex mining operations in coal mines

Article preview

The basic laws of gas filtration at different stages of coal deposit mining are considered. The technique used for studying complex development of power resources of coal deposits, allowing with reference to concrete conditions to receive engineering dependences for a quantitative estimation of all key parametres of investigated processes is given. On the basis of the developed approach to complex development the algorithm of the practical solution of the problem is offered.

How to cite: Kovalev O.V., Mozer S.P., Tkhorikov I.Y. Designing of complex mining operations in coal mines // Journal of Mining Institute. 2012. Vol. 198. p. 86.
Innovation in designing of mining plants
  • Date submitted
    2011-10-30
  • Date accepted
    2011-12-16
  • Date published
    2012-04-01

Modern information technologies in designing and planning of mining operation

Article preview

The paper present the variant of planning of mining operations at the Central ore mine of OJSC «Apatit» with the use of the MineFrame system. Explanation to the approaches and a tool kit for solution of problems in planning of mining operations are given. The advantages of putting this system of designing into operation oover the existing approaches are shown.

How to cite: Zvonar A.Y., Gortsuev A.M. Modern information technologies in designing and planning of mining operation // Journal of Mining Institute. 2012. Vol. 198. p. 91.
Innovation in designing of mining plants
  • Date submitted
    2011-10-04
  • Date accepted
    2011-12-09
  • Date published
    2012-04-01

Optimization of drainage systems of developed and perspective polymetallic deposits of Leninogorsky area of Rudniy Altai

Article preview

Results of works targeted at the selection and substantiation of optimum drainage systems of polymetallic deposits are presented. The basic stages of process of optimization of drainage systems are designated. Type assessment of polymetallic deposits of Rudniy Altai on hydrogeological conditions of development is given. Recommendations on working out basic schemes of drainage of polymetallic deposits are made.

How to cite: Kolpakov V.B. Optimization of drainage systems of developed and perspective polymetallic deposits of Leninogorsky area of Rudniy Altai // Journal of Mining Institute. 2012. Vol. 198. p. 95.
Innovation in designing of mining plants
  • Date submitted
    2011-10-17
  • Date accepted
    2011-12-29
  • Date published
    2012-04-01

Mechanism of infuence on the powered roof support of rocks under different schemes of its failure above the mined-out space

Article preview

The paper considers three basic schemes of roof failure above the face bottom of long-wall during mining operations covering the whole diversity of mechanisms of support-roof interaction. The relationships are given for the determination of required rated resistance of the powered support with reference to the schemes of roof failure.

How to cite: Baranov S.G., Rozenbaum M.A. Mechanism of infuence on the powered roof support of rocks under different schemes of its failure above the mined-out space // Journal of Mining Institute. 2012. Vol. 198. p. 100.
Innovation in designing of mining plants
  • Date submitted
    2011-10-14
  • Date accepted
    2011-12-26
  • Date published
    2012-04-01

Scientific support of the planning process of intensive coal seams mining technologies

Article preview

The main trends of underground coal mining technology development  at  Russian  coal mines are shown on the basis of analyses of intensive coal panel extraction  experience all  over  the world. The estimation of condition of the state rules and instructions for underground coal mining planning is made, it`s disparity with the modern mining practice is underlined. The necessity of the set of coal mining technologies pattern creation is shown with the purpose of increasing the quality of coal mining  projects.

How to cite: Kazanin O.I., Romashkevich A.A. Scientific support of the planning process of intensive coal seams mining technologies // Journal of Mining Institute. 2012. Vol. 198. p. 104.
Innovation in designing of mining plants
  • Date submitted
    2011-10-20
  • Date accepted
    2011-12-13
  • Date published
    2012-04-01

Generalized schemes of interaction between the powered support and roof

Article preview

The paper considers three basic schemes of roof failure above the face bottom of long-wall during mining operations covering the whole diversity of mechanisms of support-roof interaction. The model of interaction between the powered support and heavy roof is given as well as the calculated scheme for the determination of necessary rated resistance of roof.

How to cite: Rozenbaum M.A., Baranov S.G., Loginov M.A. Generalized schemes of interaction between the powered support and roof // Journal of Mining Institute. 2012. Vol. 198. p. 108.
Innovation in designing of mining plants
  • Date submitted
    2011-10-25
  • Date accepted
    2011-12-15
  • Date published
    2012-04-01

New technologies for analysis and revision of risks in the planetary-cosmic genesis in designing оf mining operations

Article preview

For the first time in practice of providing the safety in mining work consideration is given to the method of due account of the dynamics factors of rock masses of the cosmic genesis. The values of coefficient of rock mass dynamics in the 24-hours, monthly, annual, 11-year and 70- year cycles of geodynamic activity are  given.

How to cite: Shabarov A.N., Tarasov B.G., Mulev S.N., Bugalenko L.N. New technologies for analysis and revision of risks in the planetary-cosmic genesis in designing оf mining operations // Journal of Mining Institute. 2012. Vol. 198. p. 114.
Innovation in designing of mining plants
  • Date submitted
    2011-10-05
  • Date accepted
    2011-12-08
  • Date published
    2012-04-01

Provision of geodynamic safety in mining the Barentsburg coal deposit

Article preview

The minable seam «Verkhny» within the Barentsburg coal deposit is geodynamically hazardous, its geodynamic phenomena manifest itself in the form of proper rock bursts,  shocks in the marginal zones and dynamic faults of  ground. Due to rockburst-hazardous situation the application of the areal relief of rock mass with transition to technological variants of mining with leaving the extended rib pillars at the boundary with the mined-out space, with their cutting by drivage of additional working is applied. Consideration  is  given  to the recommended  variants of pillar leaving  with  the data  of their assignment and applicability to geological-and-mining conditions of mine field sections. Description is given to the calculation of pillar sizes and parameters used for their calculations. Some examples are given of pillar leaving at different sections of mine field with geometrical parameters as well as the information is given on the seam extraction with prospecting  routes (paths) with leaving the support rib and barrier pillars. The leaving of safety support and barrier pillars with substantiation of their sizes is recommended as the method for providing the safe condition  of mining the «Verkhny» coal seam

How to cite: Shvankin M.V., Rozenbaum M.A., Minin Y.Y., Stetsenko V.P., Bondarev A.V. Provision of geodynamic safety in mining the Barentsburg coal deposit // Journal of Mining Institute. 2012. Vol. 198. p. 122.
Innovation in designing of mining plants
  • Date submitted
    2011-10-12
  • Date accepted
    2011-12-25
  • Date published
    2012-04-01

Problems and ways of exploration of the raw material resources base of the Subarctic branch of MMK «Norisk nickel»

Article preview

Consideration is given to the geological, mining and operating conditions of the Norilsk industrial district. The analysis is made of the present-day state of mining production of the subarctic branch of MMK «Norilsk Nickel». The principal trends in the safe and efficient exploration of the raw material resources base have been stated within the Norilsk industrial district .

How to cite: Muravev E.I., Karelin V.N., Shabarov A.N. Problems and ways of exploration of the raw material resources base of the Subarctic branch of MMK «Norisk nickel» // Journal of Mining Institute. 2012. Vol. 198. p. 126.
Innovation in designing of mining plants
  • Date submitted
    2011-10-12
  • Date accepted
    2011-12-10
  • Date published
    2012-04-01

To the question of maintenance of permanent workings ventilation-waste floor in techtonic stressed zones «Big Gorst» of «Taimyr» mine

Article preview

Factors complicating drifting processes and barring in situ, disintegrated by tectonic burst- ing are considered. The analysis of stress-strain state formation of rock massif in the vicinity of tectonic disturbance is presented and practical recommendations concerning drifting and barring are given.

How to cite: Zvezkin V.A., Karelin V.N., Mushtekenov T.S. To the question of maintenance of permanent workings ventilation-waste floor in techtonic stressed zones «Big Gorst» of «Taimyr» mine // Journal of Mining Institute. 2012. Vol. 198. p. 131.
Innovation in designing of mining plants
  • Date submitted
    2011-10-22
  • Date accepted
    2011-12-03
  • Date published
    2012-04-01

Some results of innovations in mining at the OJSC «KNAUF GIPS Novomoskovsk»

Article preview

One of the reasons for restraint of the innovative development at mining plants is lagging behind mining machinery-building. OJSC «Knauf Gips Novomoskovsk» plant, where the transition to modern driving equipment and revision of parameters of blasting operations have been performed is an example of successful implementation of innovative approach.

How to cite: Kovtun Y.V. Some results of innovations in mining at the OJSC «KNAUF GIPS Novomoskovsk» // Journal of Mining Institute. 2012. Vol. 198. p. 134.
Innovation in designing of mining plants
  • Date submitted
    2011-10-16
  • Date accepted
    2011-12-15
  • Date published
    2012-04-01

Experience in application of geophysical methods for stress-strain state of rock mass control with the goal of altering design solutions in liquidation the flooding of the emergency section of mine № 1-5 of the Barentsburg coal deposit

Article preview

The paper presents the results of observations  of  stress-strain  state at  the Barentsburg coal deposit by means of the «Angel» equipment with the the purpose of detecting sections prone to manifestation of dynamic forms of rock pressure. The investigated sections of mine field were flooded for a long time, therefore after drainage the original cycles of geophysical measurements have  been  conducted  at all development workings and at production face by applying recording techniques for natural electromagnetic emission, recording of background component of natural electromagnetic field of the Earth, seismoacoustic emission (shock) and seismoacoustic emission (natural), pulsed by points (profiles)  along  the  workings. Parallel with geophysical observations measurements with KDM-1 device were made and visual ob- servations were carried out.

How to cite: Shvankin M.V., Mulev S.N., Skakun A.P., Rabota E.N. Experience in application of geophysical methods for stress-strain state of rock mass control with the goal of altering design solutions in liquidation the flooding of the emergency section of mine № 1-5 of the Barentsburg coal deposit // Journal of Mining Institute. 2012. Vol. 198. p. 137.
Innovation in designing of mining plants
  • Date submitted
    2011-10-11
  • Date accepted
    2011-12-06
  • Date published
    2012-04-01

Substantiation of the necessity of solving the problem of technogeneous deformation phenomena prevention in pit quarries and coal sections

Article preview

The article contains the examples of landslide phenomena in Russian Federation caused  by joint surface and underground mining and also underground slope undermining. Deformation processes occurred as a consequence of deficient and improper study of rock mass. Some examples of investigation of strength and deformation characteristics of the near-pit edge mass at one oreand one coal deposit with application of the combined surface and underground mining methods are given.

How to cite: Bryakov S.P. Substantiation of the necessity of solving the problem of technogeneous deformation phenomena prevention in pit quarries and coal sections // Journal of Mining Institute. 2012. Vol. 198. p. 144.
Innovation in designing of mining plants
  • Date submitted
    2011-10-09
  • Date accepted
    2011-12-13
  • Date published
    2012-04-01

Safety problems of mining operations in high-stress hard rock massif

Article preview

Intensive development of large-scale deposits in high-stressed rock masses results in sharp activation of mining-induced processes in the earth depths and the surface thus initiates increasing of seismic activity in the mining area and hazard of rockbursts and mining-induced earthquakes. As reliable spatial-temporal prediction of dynamic events in the mines is problematic in the current state of methodology and geomechanical experiment technique, therefore, it is required to assess risks of  these events which scale determines corresponding preventive measures.

How to cite: Kozyrev A.A., Panin V.I., Fedotova Y.V. Safety problems of mining operations in high-stress hard rock massif // Journal of Mining Institute. 2012. Vol. 198. p. 150.
Innovation in designing of mining plants
  • Date submitted
    2011-10-09
  • Date accepted
    2011-12-19
  • Date published
    2012-04-01

Monitoring and prognosis of anthropogenic and geomechanical processes in undermined rock mass in the process of mine development

Article preview

Principles of complex monitoring of anthropogenic geomechanical processes of the operating mining enterprise on the basis of geo-information technology are developed. They allow to form and maintain digital geospatial model of mine development timely and effectively. In a mode of real time it allows to carry out geophysical and geomechanical monitoring of an undermine rocks and to plan and operate technological processes timely, to raise mining operation safety.

How to cite: Zakharova V.N., Arshavskii V.V., Kharchenko A.V. Monitoring and prognosis of anthropogenic and geomechanical processes in undermined rock mass in the process of mine development // Journal of Mining Institute. 2012. Vol. 198. p. 157.
Innovation in designing of mining plants
  • Date submitted
    2011-10-18
  • Date accepted
    2011-12-24
  • Date published
    2012-04-01

Studies of the stress-strain state of intrusion in the process of joint mining of ore deposits of the Oktyabrskiy and Talnakhskiy deposits

Article preview

Features of the stress field in the ore-bearing intrusions of the October and Talnakhskiy deposits, with taking into account the depth of the ore deposits and the formation of tectonic disturbances are considered. Analysis of tension underworked and overworked intrusion. The dependencies  of stress  field formation in the intrusion in the joint working out of intrusion ore deposits are obtained. Recommendations on joint working out of intrusion ore deposits Oktyabrskiy and Talnakhskiy deposits are given.

How to cite: Shabarov A.N., Zvezdkin V.A., Anokhin A.G. Studies of the stress-strain state of intrusion in the process of joint mining of ore deposits of the Oktyabrskiy and Talnakhskiy deposits // Journal of Mining Institute. 2012. Vol. 198. p. 161.
Innovation in designing of mining plants
  • Date submitted
    2011-10-03
  • Date accepted
    2011-12-01
  • Date published
    2012-04-01

Prognosis and effective prevention of rock bursts in underground coal mines in Slovakia

Article preview

The mining activities in the territory of Slovakia have a long history. The  mining tech-nique got a fast development in the last centuries. This paper deals not only mining history but  also investigation of stability of the rock massif by underground brown coal mining from safety raise and protection of miners’ point of view and sustainable development of mining industry in  the Slovak Republic.

How to cite: Zhurov Z.V., Khizh Z. Prognosis and effective prevention of rock bursts in underground coal mines in Slovakia // Journal of Mining Institute. 2012. Vol. 198. p. 166.
Innovation in designing of mining plants
  • Date submitted
    2011-10-19
  • Date accepted
    2011-12-24
  • Date published
    2012-04-01

Blasting charge diameter influence on the blasting efficiency

Article preview

Research carried out proves that blast seismic effect i.e. displacement velocity in a seismic wave and efficiency are the function of specific charge with rock mass contact surface. Dependence of blasting fragmentation coefficient from diameters and charge density variation is given.

How to cite: Vinogradov Y.I., Artemov V.A. Blasting charge diameter influence on the blasting efficiency // Journal of Mining Institute. 2012. Vol. 198. p. 170.
Innovation in designing of mining plants
  • Date submitted
    2011-10-27
  • Date accepted
    2011-12-27
  • Date published
    2012-04-01

Interaction between seismic activity in Kuzbass and open-pit operations

Article preview

The analysis of graphs shows seismic events repeatability and seismic events distribution during the day, by days of the week and by months was made. It is shown, that seismic activity in Kuzbass region has a mixed natural and manmade character and figures of repeatability have interim character, the majority of seismic events occur in the time of blasting operations in open   pit mining, but the distribution by month of the year corresponds to planetary pattern – the larg est number of events takes place in March, August and December. It  was suggested that the  spring increase in  seismic activity lead to reduced  stability of mine slopes during the snowmelt  of landslides formation.

How to cite: Tsirel S.V., Pavlovich A.A. Interaction between seismic activity in Kuzbass and open-pit operations // Journal of Mining Institute. 2012. Vol. 198. p. 174.
Innovation in designing of mining plants
  • Date submitted
    2011-10-15
  • Date accepted
    2011-12-01
  • Date published
    2012-04-01

Influence of drilling facilities quality on the level of ocupational diseases

Article preview

The pressing challenge of occupational diseases among miners is considered. The data for different kinds of occupational diseases, their distribution in years and connection of the incidence with the quality of equipment used is  cited.

How to cite: Rudenko G.V., Panchenko I.A., Yungmeister D.A., Pivnev V.A. Influence of drilling facilities quality on the level of ocupational diseases // Journal of Mining Institute. 2012. Vol. 198. p. 180.
Innovation in designing of mining plants
  • Date submitted
    2011-10-26
  • Date accepted
    2011-12-12
  • Date published
    2012-04-01

The method of potash salt interchamber pillars stability control

Article preview

The research of potash salt rock deforming and damaging features has made it possible to develop the method of load bearing element state examination by chamber-and-pillar system.  This method consists in instrumental control of pillars by geophysical and in situ methods with following prognosis of their residual life by mathematical simulation methods.

How to cite: Baryakh A.A., Asanov V.A., Sanfirov I.A. The method of potash salt interchamber pillars stability control // Journal of Mining Institute. 2012. Vol. 198. p. 186.
Innovation in designing of mining plants
  • Date submitted
    2011-10-22
  • Date accepted
    2011-12-29
  • Date published
    2012-04-01

Using of spatial models оf objects for geodetic monitoring of deformation processes

Article preview

The paper presents comparison of classical methods of instrumental observations of slope stability with survey technology based on the use of laser  scanning systems,  as an  example of  the organization of monitoring the stability of the phosphogypsum stack Ltd «Balakovo mineral fertilizers».

How to cite: Mustafin M.G., Kovyazin A.V. Using of spatial models оf objects for geodetic monitoring of deformation processes // Journal of Mining Institute. 2012. Vol. 198. p. 191.
Innovation in designing of mining plants
  • Date submitted
    2011-10-05
  • Date accepted
    2011-12-17
  • Date published
    2012-04-01

Controls allowed earth deformation construction vertical openings in built-up area

Article preview

Article is devoted to predicting the effects of underground facilities  on  the  environment. The system of observations of the deformation of the earth's surface in the construction of the vertical development. Performed a preliminary analysis of the possible development of the deformation process. The comparison of calculated and actual data. Recommendations on the organization of the deformation  monitoring.

How to cite: Mustafin M.G., Naumov A.S. Controls allowed earth deformation construction vertical openings in built-up area // Journal of Mining Institute. 2012. Vol. 198. p. 194.
Innovation in designing of mining plants
  • Date submitted
    2011-10-15
  • Date accepted
    2011-12-29
  • Date published
    2012-04-01

Valuation of sustainable of pit wall

Article preview

This article respond the question about using the digital photographic data in  open-cast mine for specification of structural easing factor and his application for modeling of stsbility in open-cast mines with «Phase2» and  «NEDRA».

How to cite: Mustafin M.G., Sannikova A.P., Yushmanov P.I. Valuation of sustainable of pit wall // Journal of Mining Institute. 2012. Vol. 198. p. 198.
Innovation in designing of mining plants
  • Date submitted
    2011-10-01
  • Date accepted
    2011-12-02
  • Date published
    2012-04-01

Microstructual mechanical behaviour of soils

Article preview

Contact stiffness between two particles is considered. Analysis of interaction between two particles based on the smooth and rough contact is done. Dependence of contact stiffness on normal forces and particles surface roughness is  presented.

How to cite: Karasev M.A. Microstructual mechanical behaviour of soils // Journal of Mining Institute. 2012. Vol. 198. p. 202.
Innovation activity and advances for higher efficiency of production ad plants оf mining-metallurgical complex
  • Date submitted
    2011-10-21
  • Date accepted
    2011-12-12
  • Date published
    2012-04-01

Factors of alumina dust formation in primary aluminum production

Article preview

All types of raw materials used in aluminum production, are finely dispersed structures, which cause dusting during manufacturing operations, which leads to the formation of substandard raw material deposits. Their turnover in primary production contributes to the deterioration of techno-economic parameters of the  process. Alumina dust samples werea  collected  with  a mark of 16,0 meters  on  aluminum smelters in Russia, in the process of various technologies application. While in the upper layers alumina absorbss moisture, fluorides, and carbon. Penetration of fluoride in the amount of alumina particles depends of the crystallographic characteristics of the grains. At high stratification of the particles, fluorides are evenly distributed on the surface, and in the bulk of the particles. Mostly solid fluorides penetrate into cracks and deformation of the grains of alumina  and hydrogen fluoride is adsorbed on the surface with the formation of aluminum   fluoride. Alumina dust produced by the company operating for a long time with the cryolite ratio 2,2-2,35, contains a large amount of silicon. Silicon compound coat grain acicular alumina film.

How to cite: Sizyakov V.M., Vlasov A.A., Bazhin V.Y., Gembitskii V.V. Factors of alumina dust formation in primary aluminum production // Journal of Mining Institute. 2012. Vol. 198. p. 207.
Innovation activity and advances for higher efficiency of production ad plants оf mining-metallurgical complex
  • Date submitted
    2011-10-11
  • Date accepted
    2011-12-25
  • Date published
    2012-04-01

Laboratory equipment for research in mineral processing

Article preview

Main tasks of ore raw material study, requiring special laboratory equipment, are considered Conditions are described, that are required for determination of sample mass and material size, as well as the operations, that include sample preparation, determination of grindability, crushing and grinding products concentration, through implementation of which, raw material characteristics study and processing technology development are accomplished Sample preparation procedures (for mineralogical, phase and substantial analyses), laboratory ore-dressing flow sheets, as well as the recommended optimal set of laboratory equipment for their implementation, are described.

How to cite: Bortnikov A.V., Samukov A.D., Stepanyan A.S., Mezenin A.O. Laboratory equipment for research in mineral processing // Journal of Mining Institute. 2012. Vol. 198. p. 213.
Innovation activity and advances for higher efficiency of production ad plants оf mining-metallurgical complex
  • Date submitted
    2011-10-22
  • Date accepted
    2011-12-29
  • Date published
    2012-04-01

Innovate technologies in waste of extraction and nonmetallic raw materials processing

Article preview

The paper deals with the problems of crushed stone screening wastes recycling and commercial utilization of the products obtained. Application of pulsed vibration technique made it possible to minimize generation of screening wastes in crushed stone production and provided means for obtaining high-quality fillers for production of compact fine-grained concretes and cell concrete.

How to cite: Arsentev V.A., Marmandyan V.Z., Samukov A.D., Kabirov A.M. Innovate technologies in waste of extraction and nonmetallic raw materials processing // Journal of Mining Institute. 2012. Vol. 198. p. 219.
Innovation activity and advances for higher efficiency of production ad plants оf mining-metallurgical complex
  • Date submitted
    2011-10-18
  • Date accepted
    2011-12-09
  • Date published
    2012-04-01

Particularities of gold ore deposit development in complex environment

Article preview

Review of the design experience in the open-cut development of a very large gold ore steeply pitching deposit are given. Complicating factors are previous underground workings and pressure subpermafrost waters. Opening of depth horizons by ore and rock incline conveyor shafts. Crushing of ore and rock in an open-pit mine before they are delivered to conveyors by semi-mobile crushers. Water depression by ring-type workings with transportation of the collected water by conveyor shafts.

How to cite: Bakhtin V.A., Boguslavskaya L.I., Kiryukov S.V., Kozlov E.N., Prolomova T.A., Fomenko A.D. Particularities of gold ore deposit development in complex environment // Journal of Mining Institute. 2012. Vol. 198. p. 223.
Innovation activity and advances for higher efficiency of production ad plants оf mining-metallurgical complex
  • Date submitted
    2011-10-21
  • Date accepted
    2011-12-18
  • Date published
    2012-04-01

New ore and coal extracting and processing technologies at arcelormittal temirtau JSC mining plants

Article preview

Annotation describes recovery and iron ore beneficiation technologies at Lisakovsk minefield, including facilities and concentrate dephosphorisation process. Paper represents development and coal mining technological advancement prospects at Karaganda coal basin (ArcelorMittal Temirtau JSC), in cooperation with DMT Ltd (Germany).

How to cite: Pannir F., Gazaliev A.M. New ore and coal extracting and processing technologies at arcelormittal temirtau JSC mining plants // Journal of Mining Institute. 2012. Vol. 198. p. 227.
Innovation activity and advances for higher efficiency of production ad plants оf mining-metallurgical complex
  • Date submitted
    2011-10-23
  • Date accepted
    2011-12-02
  • Date published
    2012-04-01

Advanced concentration technology of phosfatic- bearing ore of Oleniy ruchey deposit (Kola peninsula)

Article preview

Based on carried out  laboratory investigations and pilot  testing there has been  developed  the technology of phosphate-bearing ores concentration of Oleniy Ruchey deposit with maximum recovery of two concentrates – apatite and nepheline. Environmental safety requirements were observed.

How to cite: Beloborodov V.I., Zakharova I.B., Andronov G.P., Filimonova N.M. Advanced concentration technology of phosfatic- bearing ore of Oleniy ruchey deposit (Kola peninsula) // Journal of Mining Institute. 2012. Vol. 198. p. 232.
Innovation activity and advances for higher efficiency of production ad plants оf mining-metallurgical complex
  • Date submitted
    2011-10-19
  • Date accepted
    2011-12-16
  • Date published
    2012-04-01

The increase of ecological safety and economic efficiency of beryllium fluoride reduction process with magnesium by using granulated bath

Article preview

Beryllium is the first of metals in Mendeleev periodic system, derived by reduction at the stage of low temperatures. The granules dimensioned interval is optimized in analytical research of beryllium fluoride reduction regularities. The maximum dimension for beryllium fluoride is 24 mm, minimum is not less than 1 mm. The optimal value of parameter is in mean value depreciation area (10-18 mm). The maximum dimension for magnesium is 24 mm and corresponds to 1 mol.

How to cite: Pestova G.S. The increase of ecological safety and economic efficiency of beryllium fluoride reduction process with magnesium by using granulated bath // Journal of Mining Institute. 2012. Vol. 198. p. 236.
Innovation activity and advances for higher efficiency of production ad plants оf mining-metallurgical complex
  • Date submitted
    2011-10-27
  • Date accepted
    2011-12-14
  • Date published
    2012-04-01

The design decision of technology of polymetallic ores enrichment in copper concentrating factory of MDK «Khandiza»

Article preview

The article discusses the design decisions and technology of enrichment used in copper-processing plant MDK «Khandiza». It shows the collective-selective enrichment scheme, the performance is supported by a smooth speed control – under bunker feeder on the basis of conveyor scales readings, grinding which is achieved in three stages as well as calculation and selection of equipment and reagents for basic services is considered.

How to cite: Kalandrov P.I., Iskandarov B.I., Abriev B.S. The design decision of technology of polymetallic ores enrichment in copper concentrating factory of MDK «Khandiza» // Journal of Mining Institute. 2012. Vol. 198. p. 243.