Submit an Article
Become a reviewer
Vol 198
Pages:
104
Download volume:

Scientific support of the planning process of intensive coal seams mining technologies

Authors:
O. I. Kazanin1
A. A. Romashkevich2
About authors
  • 1 — National Mineral Resources University (Mining University)
  • 2 — National Mineral Resources University (Mining University)
Date submitted:
2011-10-14
Date accepted:
2011-12-26
Date published:
2012-04-01

Abstract

The main trends of underground coal mining technology development  at  Russian  coal mines are shown on the basis of analyses of intensive coal panel extraction  experience all  over  the world. The estimation of condition of the state rules and instructions for underground coal mining planning is made, it`s disparity with the modern mining practice is underlined. The necessity of the set of coal mining technologies pattern creation is shown with the purpose of increasing the quality of coal mining  projects.

Go to volume 198

References

  1. Казанин О.И. Интенсивная отработка высокогазоносных угольных пластов на больших глубинах / О.И.Казанин, Г.Д.Задавин; Международ. академия наук экологии, безопасности человека и природы (МАНЭБ). СПб, 2007. 240 с.
  2. Коршунов Г.И. Многоштрековая подготовка угольных пластов / Г.И.Коршунов, А.К.Логинов, В.М.Шик. СПб: Наука, 2007. 250 с.
  3. Некоторые результаты применения на шахтах России технологических схем высокопроизводительной отработки угольных пластов / Ю.Л.Худин, Е.Ф.Козловчунас, В.Д.Носенко, А.Н.Яковлев // Уголь. 2004. № 10. С.9-15.
  4. Таразанов И. Итоги работы угольной промышленности России в 2008 году // Уголь. 2009. № 3. С.45-52.
  5. Технологические схемы разработки пластов на угольных шахтах / В.Е.Зайденварг, В.В.Соболев, И.И.Сныткин и др.; под ред. В.Е.Зайденварга; ИГД им.А.А.Скочинского. Люберцы, 1991. Ч.1. 206 с.; Ч.2. 415 с.
  6. Fiscor S. Total Number of Longwall Faces Drops Below 50 // Coal Age. 2009. № 2. P.24-32.
  7. Peng S.S. Coal Mine Ground Control / West Virginia University, 2008. 750 p.
  8. Peng S.S. Longwall Mining / West Virginia Univer- sity, 2006. 621 p.

Similar articles

Innovate technologies in waste of extraction and nonmetallic raw materials processing
2012 V. A. Arsentev, V. Z. Marmandyan, A. D. Samukov, A. M. Kabirov
Valuation of sustainable of pit wall
2012 M. G. Mustafin, A. P. Sannikova, P. I. Yushmanov
Particularities of gold ore deposit development in complex environment
2012 V. A. Bakhtin, L. I. Boguslavskaya, S. V. Kiryukov, E. N. Kozlov, T. A. Prolomova, A. D. Fomenko
Provision of geodynamic safety in mining the Barentsburg coal deposit
2012 M. V. Shvankin, M. A. Rozenbaum, Yu. Ya. Minin, V. P. Stetsenko, A. V. Bondarev
Some results of innovations in mining at the OJSC «KNAUF GIPS Novomoskovsk»
2012 Yu. V. Kovtun
Mechanizатion of steep thick coal seams working
2012 L. F. Kozhukhov, K. V. Struk