Submit an Article
Become a reviewer
Vol 198
Pages:
131
Download volume:
RUS

To the question of maintenance of permanent workings ventilation-waste floor in techtonic stressed zones «Big Gorst» of «Taimyr» mine

Authors:
V. A. Zvezkin1
V. N. Karelin2
T. S. Mushtekenov3
About authors
  • 1 — National Mineral Resources University (Mining University)
  • 2 — ZF OJSC MMK «Norilsk Nickel»
  • 3 — ZF OJSC MMK «Norilsk Nickel»
Date submitted:
2011-10-12
Date accepted:
2011-12-10
Date published:
2012-04-01

Abstract

Factors complicating drifting processes and barring in situ, disintegrated by tectonic burst- ing are considered. The analysis of stress-strain state formation of rock massif in the vicinity of tectonic disturbance is presented and practical recommendations concerning drifting and barring are given.

Go to volume 198

References

  1. Указания по безопасному ведению горных работ на Талнахском и Октябрьском месторождениях, склонных и опасных к горным ударам. Норильск, 2001. 107 с.

Similar articles

Experience in application of geophysical methods for stress-strain state of rock mass control with the goal of altering design solutions in liquidation the flooding of the emergency section of mine № 1-5 of the Barentsburg coal deposit
2012 M. V. Shvankin, S. N. Mulev, A. P. Skakun, E. N. Rabota
Laboratory equipment for research in mineral processing
2012 A. V. Bortnikov, A. D. Samukov, A. S. Stepanyan, A. O. Mezenin
Some results of innovations in mining at the OJSC «KNAUF GIPS Novomoskovsk»
2012 Yu. V. Kovtun
Mechanism of infuence on the powered roof support of rocks under different schemes of its failure above the mined-out space
2012 S. G. Baranov, M. A. Rozenbaum
Experience in ore reserves extraction in open-pit borders and bottom in transition from open-pit to underground mining
2012 M. S. Tankov, I. S. Shelkovyi
Scientific support of the planning process of intensive coal seams mining technologies
2012 O. I. Kazanin, A. A. Romashkevich