To the question of maintenance of permanent workings ventilation-waste floor in techtonic stressed zones «Big Gorst» of «Taimyr» mine

Authors:
V. A. Zvezdkin1
V. N. Karelin2
T. S. Mushtekenov3
About authors
  • 1 — Ph.D. leading research assistant National Mineral Resources University (Mining University)
  • 2 — deputy director of the mineral complex ZF OJSC MMK «Norilsk Nickel»
  • 3 — chief engineer of «Taimyr» mine ZF OJSC MMK «Norilsk Nickel»
Date submitted:
2011-10-12
Date accepted:
2011-12-10
Date published:
2012-11-19

Abstract

Factors complicating drifting processes and barring in situ, disintegrated by tectonic burst- ing are considered. The analysis of stress-strain state formation of rock massif in the vicinity of tectonic disturbance is presented and practical recommendations concerning drifting and barring are given.

Область исследования:
(Archived) Innovation in designing of mining plants
Keywords:
mine capital developments fastening pressure deformation recommendation
Funding:

None

Go to volume 198

References

  1. Advice on safe mining at Talnakhskiy and Oktyabrsky deposits prone and dangerous to rock bursts. Norilsk, 2001. 107 p.

Similar articles

Blasting charge diameter influence on the blasting efficiency
2012 Yu. I. Vinogradov, V. A. Artemov
Problem solving of design and planning of open pit mining in Mineframe system
2012 O. V. Nagovitsyn, S. V. Lukichev, A. Yu. Alisov
The method of potash salt interchamber pillars stability control
2012 A. A. Baryakh, V. A. Asanov, I. A. Sanfirov
Mechanizаtion of steep thick coal seams working
2012 L. F. Kozhukhov, K. V. Struk
Generalized schemes of interaction between the powered support and roof
2012 M. A. Rozenbaum, S. G. Baranov, M. A. Loginov
Mechanism of infuence on the powered roof support of rocks under different schemes of its failure above the mined-out space
2012 S. G. Baranov, M. A. Rozenbaum