Submit an Article
Become a reviewer
Vol 198
Pages:
95-99
Download volume:
RUS
Article

Optimization of drainage systems of developed and perspective polymetallic deposits of Leninogorsky area of Rudniy Altai

Authors:
V. B. Kolpakov
About authors
  • engineer hydrogeologist GYPROSHAKHT Projection Institute
Date submitted:
2011-10-04
Date accepted:
2011-12-09
Date published:
2012-11-19

Abstract

Results of works targeted at the selection and substantiation of optimum drainage systems of polymetallic deposits are presented. The basic stages of process of optimization of drainage systems are designated. Type assessment of polymetallic deposits of Rudniy Altai on hydrogeological conditions of development is given. Recommendations on working out basic schemes of drainage of polymetallic deposits are made.

Область исследования:
(Archived) Innovation in designing of mining plants
Keywords:
drainage systems optimization polymetallic deposits Rudniy Altai
Go to volume 198

References

  1. Lomakin Е.А, Mironenko V.A, Shestakov V.M. Numerical geofiltration modelling. Moscow, 1988. 228 р.
  2. Norvatov J.A. Studying and the forecast of a technogenic mode of underground waters (at development of mineral deposits). Leningrad, 1988. 261 с.
  3. Plotnikov N.I., Roginets I.I. Hydrogeology of ore deposits. Moscow, 1987. 287 с.
  4. Shannon Robert E. System simulation – the art and science. Moscow, 1978. 420 р.

Similar articles

Innovate technologies in waste of extraction and nonmetallic raw materials processing
2012 V. A. Arsentev, V. Z. Marmandyan, A. D. Samukov, A. M. Kabirov
The increase of ecological safety and economic efficiency of beryllium fluoride reduction process with magnesium by using granulated bath
2012 G. S. Pestova
Experience in application of geophysical methods for stress-strain state of rock mass control with the goal of altering design solutions in liquidation the flooding of the emergency section of mine № 1-5 of the Barentsburg coal deposit
2012 M. V. Shvankin, S. N. Mulev, A. P. Skakun, E. N. Rabota
Optimization of protective pillars parameters of mine shafts at the ore mines of OJSC «MMK «Norilsk Nickel»
2012 Yu. I. Zuev, S. N. Zelentsov, E. I. Kuznetsova, V. A. Zvezdkin, V. N. Karelin
Particularities of gold ore deposit development in complex environment
2012 V. A. Bakhtin, L. I. Boguslavskaya, S. V. Kiryukov, E. N. Kozlov, T. A. Prolomova, A. D. Fomenko
Controls allowed earth deformation construction vertical openings in built-up area
2012 M. G. Mustafin, A. S. Naumov