Modern information technologies in designing and planning of mining operation
About authors
- 1 — technical director – chief engineer OJSC «Apatit»
- 2 — senior engineer of geologic departament of the Tsentralniy ore mine OJSC «Apatit»
Abstract
The paper present the variant of planning of mining operations at the Central ore mine of OJSC «Apatit» with the use of the MineFrame system. Explanation to the approaches and a tool kit for solution of problems in planning of mining operations are given. The advantages of putting this system of designing into operation oover the existing approaches are shown.
Область исследования:
(Archived) Innovation in designing of mining plants
Similar articles
Particularities of gold ore deposit development in complex environment
2012 V. A. Bakhtin, L. I. Boguslavskaya, S. V. Kiryukov, E. N. Kozlov, T. A. Prolomova, A. D. Fomenko
The method of potash salt interchamber pillars stability control
2012 A. A. Baryakh, V. A. Asanov, I. A. Sanfirov
Feasibility study of optimal parameters of pillars in designing rockburst-hazardous ore deposits development
2012 D. V. Sidorov, T. V. Ponomarenko