Submit an Article
Become a reviewer
Vol 198
Pages:
55-60
Download volume:
RUS
Article

Peculiarities of prof. S.D.Korobov’s algorithm appliance in open-pit boundaries determination and mining operation regime justification

Authors:
A. L. Bilin
About authors
  • Ph.D. senior research assistant Mining Institute of the Kola Research Center of the RAS
Date submitted:
2011-10-18
Date accepted:
2011-12-02
Date published:
2012-11-19

Abstract

System of embedded contours applied in computer-aided mining-geometrical analysis is appropriate both for open-pit boundaries determination and for optimal advance direction with justification of mining operation regime.

Область исследования:
(Archived) Innovation in designing of mining plants
Keywords:
boundary stripping ratio open-pit boundaries advance direction mining operation regime
Funding:

None

Go to volume 198

References

  1. Bilin A.L. Substantiation of transition from natural economic conditions to the calculated ones. Mining in the Arctic Regions: 8 Int.Symp. Apatity, 20-23 June 2005. Saint Petersburg: Publ. Ivan Fyodorov. 2005. P.252-256.
  2. Lukichen S.V., Nagovitsyn O.V., Morozov A.V.Modeling of ore and bedded deposits in the MineFrame System// Mining Information Buletin. 2004. N.5. P.296-301.
  3. Nagovitsyn O.V., Bilin A.L., Sma gin A.V. Optimization of open-pit mine bounda ries based on prof. S.D.Korobov algorithm// Mining Information Buletin. 2002. N.7. P.244-246.

Similar articles

Studies of the stress-strain state of intrusion in the process of joint mining of ore deposits of the Oktyabrskiy and Talnakhskiy deposits
2012 A. N. Shabarov, V. A. Zvezdkin, A. G. Anokhin
Innovative technologies in disigning of mining enterprises
2012 G. Yu. Sedykh
To the question of maintenance of permanent workings ventilation-waste floor in techtonic stressed zones «Big Gorst» of «Taimyr» mine
2012 V. A. Zvezdkin, V. N. Karelin, T. S. Mushtekenov
New ore and coal extracting and processing technologies at arcelormittal temirtau JSC mining plants
2012 F. Pannir, A. M. Gazaliev
Experience in ore reserves extraction in open-pit borders and bottom in transition from open-pit to underground mining
2012 M. S. Tankov, I. S. Shelkovyi
Problem solving of design and planning of open pit mining in Mineframe system
2012 O. V. Nagovitsyn, S. V. Lukichev, A. Yu. Alisov