Submit an Article
Become a reviewer
Vol 198
Pages:
157-160
Download volume:
RUS
Article

Monitoring and prognosis of anthropogenic and geomechanical processes in undermined rock mass in the process of mine development

Authors:
V. N. Zakharova1
V. V. Arshavskii2
A. V. Kharchenko3
About authors
  • 1 — Ph.D., Dr.Sci. laboratory head Institute of Comprehensive Exploitation of Mineral Resources of the RAS
  • 2 — Ph.D. leading research assistant Institute of Comprehensive Exploitation of Mineral Resources of the RAS
  • 3 — Ph.D. senior research assistant Institute of Comprehensive Exploitation of Mineral Resources of the RAS
Date submitted:
2011-10-09
Date accepted:
2011-12-19
Date published:
2012-11-19

Abstract

Principles of complex monitoring of anthropogenic geomechanical processes of the operating mining enterprise on the basis of geo-information technology are developed. They allow to form and maintain digital geospatial model of mine development timely and effectively. In a mode of real time it allows to carry out geophysical and geomechanical monitoring of an undermine rocks and to plan and operate technological processes timely, to raise mining operation safety.

Область исследования:
(Archived) Innovation in designing of mining plants
Keywords:
rock mass geophysical monitoring geomechanical monitoring geospatial model anthropogenic processes tomography lineament
Funding:

None

Go to volume 198

Similar articles

Problems and ways of exploration of the raw material resources base of the Subarctic branch of MMK «Norisk nickel»
2012 E. I. Muravev, V. N. Karelin, A. N. Shabarov
Generalized schemes of interaction between the powered support and roof
2012 M. A. Rozenbaum, S. G. Baranov, M. A. Loginov
Interaction between seismic activity in Kuzbass and open-pit operations
2012 S. V. Tsirel, A. A. Pavlovich
Calendar planning in present-day geological and mining systems
2012 R. A. Bagateev
Experience in application of geophysical methods for stress-strain state of rock mass control with the goal of altering design solutions in liquidation the flooding of the emergency section of mine № 1-5 of the Barentsburg coal deposit
2012 M. V. Shvankin, S. N. Mulev, A. P. Skakun, E. N. Rabota
Innovative technologies in disigning of mining enterprises
2012 G. Yu. Sedykh