Submit an Article
Become a reviewer
Vol 198
Pages:
161-165
Download volume:
RUS
Article

Studies of the stress-strain state of intrusion in the process of joint mining of ore deposits of the Oktyabrskiy and Talnakhskiy deposits

Authors:
A. N. Shabarov1
V. A. Zvezdkin2
A. G. Anokhin3
About authors
  • 1 — Ph.D., Dr.Sci. director of Research center – prorector National Mineral Resources University (Mining University)
  • 2 — Ph.D. leading research assistant National Mineral Resources University (Mining University)
  • 3 — chief engineer of the mine «October» ZF OJSC MMK «Norilsk Nickel»
Date submitted:
2011-10-18
Date accepted:
2011-12-24
Date published:
2012-11-19

Abstract

Features of the stress field in the ore-bearing intrusions of the October and Talnakhskiy deposits, with taking into account the depth of the ore deposits and the formation of tectonic disturbances are considered. Analysis of tension underworked and overworked intrusion. The dependencies of stress field formation in the intrusion in the joint working out of intrusion ore deposits are obtained. Recommendations on joint working out of intrusion ore deposits Oktyabrskiy and Talnakhskiy deposits are given.

Область исследования:
(Archived) Innovation in designing of mining plants
Keywords:
ore -bearing intrusion tectonic disturbances stress field overworking under-working recommendation for carrying out stoping
Funding:

None

Go to volume 198

References

  1. Instructions for mine safety in ore and metal-nkerudnyh storozhdeniyah, objects, construction of under-ground structures, slopes and dangerous on the mountain bumps. RD06-329- 99. Moscow, 2003. 81 p.
  2. Glushihin F.P., Kuznetsov G.N., Shkliarsky M.F. etc. Simulation in geo-mechanics. Moscow: Nedra, 1991. 240 p.
  3. Advice on safe mining at Talnakh and Oktyabrsky fields prone and dangerous on the mountain bumps. Norilsk, 2007. 99 p.

Similar articles

Scientific support of the planning process of intensive coal seams mining technologies
2012 O. I. Kazanin, A. A. Romashkevich
The design decision of technology of polymetallic ores enrichment in copper concentrating factory of MDK «Khandiza»
2012 P. I. Kalandrov, B. I. Iskandarov, B. S. Abriev
Geomechanic assessment of technological decisions for designing mining operations in of burst hazrdous conditions
2012 I. Yu. Rasskazov, G. A. Kursakin, M. I. Potapchuk, M. I. Rasskazov
The method of potash salt interchamber pillars stability control
2012 A. A. Baryakh, V. A. Asanov, I. A. Sanfirov
Experience in application of geophysical methods for stress-strain state of rock mass control with the goal of altering design solutions in liquidation the flooding of the emergency section of mine № 1-5 of the Barentsburg coal deposit
2012 M. V. Shvankin, S. N. Mulev, A. P. Skakun, E. N. Rabota
New technologies for analysis and revision of risks in the planetary-cosmic genesis in designing оf mining operations
2012 A. N. Shabarov, B. G. Tarasov, S. N. Mulev, L. V. Bugaenko