The research of potash salt rock deforming and damaging features has made it possible to develop the method of load bearing element state examination by chamber-and-pillar system. This method consists in instrumental control of pillars by geophysical and in situ methods with following prognosis of their residual life by mathematical simulation methods.
Similar articles
Problem solving of design and planning of open pit mining in Mineframe system
2012 O. V. Nagovitsyn, S. V. Lukichev, A. Yu. Alisov
Substantiation of techniques and methods of technogeneous deposits forming represented by rock refuse and waste rock dumps at open pit mining
2012 S. P. Reshetnyak, A. V. Arkhipov
Experience in expert systems application for estimation of stress- strain state of rock mass for selection of safe methods of ore deposits mining
2012 A. A. Kozyrev, V. I. Panin, I. E. Semenova