The method of potash salt interchamber pillars stability control
About authors
- 1 — Ph.D., Dr.Sci. director Ural branch of the RAS
- 2 — Ph.D., Dr.Sci. laboratory head Ural branch of the RAS
- 3 — Ph.D., Dr.Sci. deputy director Ural branch of the RAS
Abstract
The research of potash salt rock deforming and damaging features has made it possible to develop the method of load bearing element state examination by chamber-and-pillar system. This method consists in instrumental control of pillars by geophysical and in situ methods with following prognosis of their residual life by mathematical simulation methods.
Область исследования:
(Archived) Innovation in designing of mining plants
Similar articles
Optimization of drainage systems of developed and perspective polymetallic deposits of Leninogorsky area of Rudniy Altai
2012 V. B. Kolpakov
Provision of geodynamic safety in mining the Barentsburg coal deposit
2012 M. V. Shvankin, M. A. Rozenbaum, Yu. Ya. Minin, V. P. Stetsenko, A. V. Bondarev
Experience in ore reserves extraction in open-pit borders and bottom in transition from open-pit to underground mining
2012 M. S. Tankov, I. S. Shelkovyi