The method of potash salt interchamber pillars stability control
About authors
- 1 — Ph.D., Dr.Sci. director Ural branch of the RAS
- 2 — Ph.D., Dr.Sci. laboratory head Ural branch of the RAS
- 3 — Ph.D., Dr.Sci. deputy director Ural branch of the RAS
Abstract
The research of potash salt rock deforming and damaging features has made it possible to develop the method of load bearing element state examination by chamber-and-pillar system. This method consists in instrumental control of pillars by geophysical and in situ methods with following prognosis of their residual life by mathematical simulation methods.
Область исследования:
(Archived) Innovation in designing of mining plants
Similar articles
Provision of geodynamic safety in mining the Barentsburg coal deposit
2012 M. V. Shvankin, M. A. Rozenbaum, Yu. Ya. Minin, V. P. Stetsenko, A. V. Bondarev
Feasibility study of optimal parameters of pillars in designing rockburst-hazardous ore deposits development
2012 D. V. Sidorov, T. V. Ponomarenko
Studies of the stress-strain state of intrusion in the process of joint mining of ore deposits of the Oktyabrskiy and Talnakhskiy deposits
2012 A. N. Shabarov, V. A. Zvezdkin, A. G. Anokhin
Innovate technologies in waste of extraction and nonmetallic raw materials processing
2012 V. A. Arsentev, V. Z. Marmandyan, A. D. Samukov, A. M. Kabirov