The method of potash salt interchamber pillars stability control
About authors
- 1 — Ph.D., Dr.Sci. director Ural branch of the RAS
- 2 — Ph.D., Dr.Sci. laboratory head Ural branch of the RAS
- 3 — Ph.D., Dr.Sci. deputy director Ural branch of the RAS
Abstract
The research of potash salt rock deforming and damaging features has made it possible to develop the method of load bearing element state examination by chamber-and-pillar system. This method consists in instrumental control of pillars by geophysical and in situ methods with following prognosis of their residual life by mathematical simulation methods.
Область исследования:
(Archived) Innovation in designing of mining plants
Similar articles
Factors of alumina dust formation in primary aluminum production
2012 V. M. Sizyakov, A. A. Vlasov, V. Yu. Bazhin, V. V. Gembitskii
Monitoring and prognosis of anthropogenic and geomechanical processes in undermined rock mass in the process of mine development
2012 V. N. Zakharova, V. V. Arshavskii, A. V. Kharchenko
Peculiarities of prof. S.D.Korobov’s algorithm appliance in open-pit boundaries determination and mining operation regime justification
2012 A. L. Bilin
Interaction between seismic activity in Kuzbass and open-pit operations
2012 S. V. Tsirel, A. A. Pavlovich