The method of potash salt interchamber pillars stability control
About authors
- 1 — Ph.D., Dr.Sci. director Ural branch of the RAS
- 2 — Ph.D., Dr.Sci. laboratory head Ural branch of the RAS
- 3 — Ph.D., Dr.Sci. deputy director Ural branch of the RAS
Abstract
The research of potash salt rock deforming and damaging features has made it possible to develop the method of load bearing element state examination by chamber-and-pillar system. This method consists in instrumental control of pillars by geophysical and in situ methods with following prognosis of their residual life by mathematical simulation methods.
Область исследования:
(Archived) Innovation in designing of mining plants
Similar articles
Factors of alumina dust formation in primary aluminum production
2012 V. M. Sizyakov, A. A. Vlasov, V. Yu. Bazhin, V. V. Gembitskii
Reflectionless observation technique of deforming edges of open-pit mines and spoil dumps
2012 P. V. Koltsov
Experience in ore reserves extraction in open-pit borders and bottom in transition from open-pit to underground mining
2012 M. S. Tankov, I. S. Shelkovyi