Feasibility study of optimal parameters of pillars in designing rockburst-hazardous ore deposits development
About authors
- 1 — Ph.D. laboratory head National Mineral Resources University (Mining University)
- 2 — Ph.D. associate professor National Mineral Resources University (Mining University)
Abstract
The safe parameters of temporary interchamber pillars have been determined for the chamber-and-pillar method with ore discharge on trenches in designing of underground mining of the Koashva apatite-nepheline deposit. The results of calculation of economical efficiency of comparable parameters are presented. It was substantiated that the economical efficiency of application of the chamber-and-pillar method up to the depth of 800 m is related to the increase of natural yielding of interchamber pillars.
Область исследования:
(Archived) Innovation in designing of mining plants
References
- Belyaev N.M. Strength of materials. Moscow: Gostechizdat, 1954. 856 p.
- Ilnitskaya E.I., Teder R.I., Vatolin E.S. Rock properties and methods for their determination. Moscow: Nedra, 1969. 392 р.
- Imenitov V.R. Technology, mechanization and production processes in underground mining of ore deposits. Moscow: Nedra, 1973. 495 p.
- Instruction on account of state of reserves, definition, planning and rating of quantitative losses of apatitenepheline ores at ore mines of OJSC «Apatit» / OJSC «Apatit». Apatity. 1992. 80 p.
- Lobanov N.Y., Torshev V.G. Economics, organization and planning of production at ore plants. Moscow: Nedra , 1986. 328 р.
- Lobanov N.Y. Economy of nature utilization in prospecting, mining and enrichment of mineral resources. Economic assessment of mineral resources: Textbook. Saint Petersburg, 2009. 9 9 р.
- Petukhov I.M., Linkov A.M., Sidorov V.S. Calculation methods in the mechanics of rock bursts and outbursts: Refe rence textbook. Moscow: Nedra, 1992. 256 p.
- Directions on safe mining operations at the deposits prone to rockbursts / OJSC «Apatit». Apatity – Kirovsk, 2002. 100 р.
Similar articles
Influence of drilling facilities quality on the level of ocupational diseases
2012 G. V. Rudenko, I. A. Panchenko, D. A. Yungmeister, V. A. Pivnev
Laboratory equipment for research in mineral processing
2012 A. V. Bortnikov, A. D. Samukov, A. S. Stepanyan, A. O. Mezenin
To the question of maintenance of permanent workings ventilation-waste floor in techtonic stressed zones «Big Gorst» of «Taimyr» mine
2012 V. A. Zvezdkin, V. N. Karelin, T. S. Mushtekenov
The method of potash salt interchamber pillars stability control
2012 A. A. Baryakh, V. A. Asanov, I. A. Sanfirov