Particularities of gold ore deposit development in complex environment
Authors:
About authors
- 1 — CJSC «Saint Petersburg Mining Project and Engineering Company»
- 2 — CJSC «Saint Petersburg Mining Project and Engineering Company»
- 3 — CJSC «Saint Petersburg Mining Project and Engineering Company»
- 4 — CJSC «Saint Petersburg Mining Project and Engineering Company»
- 5 — CJSC «Saint Petersburg Mining Project and Engineering Company»
- 6 — CJSC «Saint Petersburg Mining Project and Engineering Company»
Abstract
Review of the design experience in the open-cut development of a very large gold ore steeply pitching deposit are given. Complicating factors are previous underground workings and pressure subpermafrost waters. Opening of depth horizons by ore and rock incline conveyor shafts. Crushing of ore and rock in an open-pit mine before they are delivered to conveyors by semi-mobile crushers. Water depression by ring-type workings with transportation of the collected water by conveyor shafts.
Similar articles
Experience in application of geophysical methods for stress-strain state of rock mass control with the goal of altering design solutions in liquidation the flooding of the emergency section of mine № 1-5 of the Barentsburg coal deposit
2012 M. V. Shvankin, S. N. Mulev, A. P. Skakun, E. N. Rabota
Influence of drilling facilities quality on the level of ocupational diseases
2012 G. V. Rudenko, I. A. Panchenko, D. A. Yungmeister, V. A. Pivnev
Scientific support of the planning process of intensive coal seams mining technologies
2012 O. I. Kazanin, A. A. Romashkevich
Optimization of protective pillars parameters of mine shafts at the ore mines of OJSC «MMK «Norilsk Nickel»
2012 Yu. I. Zuev, S. N. Zelentsov, E. I. Kuznetsova, V. A. Zvezdkin, V. N. Karelin