Particularities of gold ore deposit development in complex environment

Authors:
V. A. Bakhtin1
L. I. Boguslavskaya2
S. V. Kiryukov3
E. N. Kozlov4
T. A. Prolomova5
A. D. Fomenko6
About authors
  • 1 — deputy head of mining board for open-cut min CJSC «Saint Petersburg Mining Project and Engineering Company»
  • 2 — chief engineering manager CJSC «Saint Petersburg Mining Project and Engineering Company»
  • 3 — Ph.D. director in projects development CJSC «Saint Petersburg Mining Project and Engineering Company»
  • 4 — Ph.D. deputy head of mining board for underground mining CJSC «Saint Petersburg Mining Project and Engineering Company»
  • 5 — Ph.D. chief specialist in open-cut mining CJSC «Saint Petersburg Mining Project and Engineering Company»
  • 6 — chief engineer of design engineering directorate CJSC «Saint Petersburg Mining Project and Engineering Company»
Date submitted:
2011-10-18
Date accepted:
2011-12-09
Date published:
2012-11-19

Abstract

Review of the design experience in the open-cut development of a very large gold ore steeply pitching deposit are given. Complicating factors are previous underground workings and pressure subpermafrost waters. Opening of depth horizons by ore and rock incline conveyor shafts. Crushing of ore and rock in an open-pit mine before they are delivered to conveyors by semi-mobile crushers. Water depression by ring-type workings with transportation of the collected water by conveyor shafts.

Область исследования:
(Archived) Innovation activity and advances for higher efficiency of production ad plants оf mining-metallurgical complex
Keywords:
o pen- cut mine previous underground workings pressure subpermafrost waters incline conveyor shafts cyclical-and -continuous method semi-mobile crushers motor transport
Go to volume 198

Similar articles

Experience in ore reserves extraction in open-pit borders and bottom in transition from open-pit to underground mining
2012 M. S. Tankov, I. S. Shelkovyi
Safety problems of mining operations in high-stress hard rock massif
2012 A. A. Kozyrev, V. I. Panin, Yu. V. Fedotova
Optimization of protective pillars parameters of mine shafts at the ore mines of OJSC «MMK «Norilsk Nickel»
2012 Yu. I. Zuev, S. N. Zelentsov, E. I. Kuznetsova, V. A. Zvezdkin, V. N. Karelin
Calendar planning in present-day geological and mining systems
2012 R. A. Bagateev
Feasibility study of optimal parameters of pillars in designing rockburst-hazardous ore deposits development
2012 D. V. Sidorov, T. V. Ponomarenko
Optimization of drainage systems of developed and perspective polymetallic deposits of Leninogorsky area of Rudniy Altai
2012 V. B. Kolpakov