Submit an Article
Become a reviewer
Vol 198
Pages:
223-226
Download volume:
RUS
Article

Particularities of gold ore deposit development in complex environment

Authors:
V. A. Bakhtin1
L. I. Boguslavskaya2
S. V. Kiryukov3
E. N. Kozlov4
T. A. Prolomova5
A. D. Fomenko6
About authors
  • 1 — deputy head of mining board for open-cut min CJSC «Saint Petersburg Mining Project and Engineering Company»
  • 2 — chief engineering manager CJSC «Saint Petersburg Mining Project and Engineering Company»
  • 3 — Ph.D. director in projects development CJSC «Saint Petersburg Mining Project and Engineering Company»
  • 4 — Ph.D. deputy head of mining board for underground mining CJSC «Saint Petersburg Mining Project and Engineering Company»
  • 5 — Ph.D. chief specialist in open-cut mining CJSC «Saint Petersburg Mining Project and Engineering Company»
  • 6 — chief engineer of design engineering directorate CJSC «Saint Petersburg Mining Project and Engineering Company»
Date submitted:
2011-10-18
Date accepted:
2011-12-09
Date published:
2012-11-19

Abstract

Review of the design experience in the open-cut development of a very large gold ore steeply pitching deposit are given. Complicating factors are previous underground workings and pressure subpermafrost waters. Opening of depth horizons by ore and rock incline conveyor shafts. Crushing of ore and rock in an open-pit mine before they are delivered to conveyors by semi-mobile crushers. Water depression by ring-type workings with transportation of the collected water by conveyor shafts.

Область исследования:
(Archived) Innovation activity and advances for higher efficiency of production ad plants оf mining-metallurgical complex
Keywords:
o pen- cut mine previous underground workings pressure subpermafrost waters incline conveyor shafts cyclical-and -continuous method semi-mobile crushers motor transport
Go to volume 198

Similar articles

Reflectionless observation technique of deforming edges of open-pit mines and spoil dumps
2012 P. V. Koltsov
Mechanism of infuence on the powered roof support of rocks under different schemes of its failure above the mined-out space
2012 S. G. Baranov, M. A. Rozenbaum
Innovative technologies in disigning of mining enterprises
2012 G. Yu. Sedykh
Some results of innovations in mining at the OJSC «KNAUF GIPS NOVOMOSKOVSK»
2012 Yu. V. Kovtun
Influence of drilling facilities quality on the level of ocupational diseases
2012 G. V. Rudenko, I. A. Panchenko, D. A. Yungmeister, V. A. Pivnev
Safety problems of mining operations in high-stress hard rock massif
2012 A. A. Kozyrev, V. I. Panin, Yu. V. Fedotova