Particularities of gold ore deposit development in complex environment

Authors:
V. A. Bakhtin1
L. I. Boguslavskaya2
S. V. Kiryukov3
E. N. Kozlov4
T. A. Prolomova5
A. D. Fomenko6
About authors
  • 1 — deputy head of mining board for open-cut min CJSC «Saint Petersburg Mining Project and Engineering Company»
  • 2 — chief engineering manager CJSC «Saint Petersburg Mining Project and Engineering Company»
  • 3 — Ph.D. director in projects development CJSC «Saint Petersburg Mining Project and Engineering Company»
  • 4 — Ph.D. deputy head of mining board for underground mining CJSC «Saint Petersburg Mining Project and Engineering Company»
  • 5 — Ph.D. chief specialist in open-cut mining CJSC «Saint Petersburg Mining Project and Engineering Company»
  • 6 — chief engineer of design engineering directorate CJSC «Saint Petersburg Mining Project and Engineering Company»
Date submitted:
2011-10-18
Date accepted:
2011-12-09
Date published:
2012-11-19

Abstract

Review of the design experience in the open-cut development of a very large gold ore steeply pitching deposit are given. Complicating factors are previous underground workings and pressure subpermafrost waters. Opening of depth horizons by ore and rock incline conveyor shafts. Crushing of ore and rock in an open-pit mine before they are delivered to conveyors by semi-mobile crushers. Water depression by ring-type workings with transportation of the collected water by conveyor shafts.

Область исследования:
(Archived) Innovation activity and advances for higher efficiency of production ad plants оf mining-metallurgical complex
Keywords:
o pen- cut mine previous underground workings pressure subpermafrost waters incline conveyor shafts cyclical-and -continuous method semi-mobile crushers motor transport
Go to volume 198

Similar articles

Advanced concentration technology of phosfatic- bearing ore of Oleniy ruchey deposit (Kola peninsula)
2012 V. I. Beloborodov, I. B. Zakharova, G. P. Andronov, N. M. Filimonova
The increase of ecological safety and economic efficiency of beryllium fluoride reduction process with magnesium by using granulated bath
2012 G. S. Pestova
To the question of maintenance of permanent workings ventilation-waste floor in techtonic stressed zones «Big Gorst» of «Taimyr» mine
2012 V. A. Zvezdkin, V. N. Karelin, T. S. Mushtekenov
Some results of innovations in mining at the OJSC «KNAUF GIPS NOVOMOSKOVSK»
2012 Yu. V. Kovtun
Influence of drilling facilities quality on the level of ocupational diseases
2012 G. V. Rudenko, I. A. Panchenko, D. A. Yungmeister, V. A. Pivnev
Geomechanic assessment of technological decisions for designing mining operations in of burst hazrdous conditions
2012 I. Yu. Rasskazov, G. A. Kursakin, M. I. Potapchuk, M. I. Rasskazov