Submit an Article
Become a reviewer
Vol 198
Pages:
75-79
Download volume:
RUS
Article

Calendar planning in present-day geological and mining systems

Authors:
R. A. Bagateev
About authors
  • senior research assistant National Mineral Resources University (Mining University)
Date submitted:
2011-10-30
Date accepted:
2011-12-06
Date published:
2012-11-19

Abstract

The article describes the principles of the calendar planning in the present-day geological-and-mining systems of the open-pit and underground mining. At present, a set of tasks was outlined being solved with using these systems at ore mining plants and design companies. A common approach to data preparation for the calculation of a calendar plan in the open pit and underground mining is described, including the determination of geological, technological and economical parameters to obtain the co-variant results of calculations. The advantages of introduction of geological-and-mining systems into the field of designing work are shown.

Область исследования:
(Archived) Innovation in designing of mining plants
Keywords:
geological and mining systems calendar planning of mining operations
Funding:

None

Go to volume 198

Similar articles

Some results of innovations in mining at the OJSC «KNAUF GIPS NOVOMOSKOVSK»
2012 Yu. V. Kovtun
Peculiarities of prof. S.D.Korobov’s algorithm appliance in open-pit boundaries determination and mining operation regime justification
2012 A. L. Bilin
Factors of alumina dust formation in primary aluminum production
2012 V. M. Sizyakov, A. A. Vlasov, V. Yu. Bazhin, V. V. Gembitskii
Optimization of protective pillars parameters of mine shafts at the ore mines of OJSC «MMK «Norilsk Nickel»
2012 Yu. I. Zuev, S. N. Zelentsov, E. I. Kuznetsova, V. A. Zvezdkin, V. N. Karelin
Scientific provision of disigning mineral deposit mining
2012 A. V. Kotenkov, I. G. Kharisov
The method of potash salt interchamber pillars stability control
2012 A. A. Baryakh, V. A. Asanov, I. A. Sanfirov