Calendar planning in present-day geological and mining systems

Authors:
R. A. Bagateev
About authors
  • National Mineral Resources University (Mining University)
Date submitted:
2011-10-30
Date accepted:
2011-12-06
Date published:
2012-11-19

Abstract

The article describes the principles of the calendar planning in the present-day geological-and-mining systems of the open-pit and underground mining. At present, a set of tasks was outlined being solved with using these systems at ore mining plants and design companies. A common approach to data preparation for the calculation of a calendar plan in the open pit and underground mining is described, including the determination of geological, technological and economical parameters to obtain the co-variant results of calculations. The advantages of introduction of geological-and-mining systems into the field of designing work are shown.

Go to volume 198

Similar articles

Monitoring and prognosis of anthropogenic and geomechanical processes in undermined rock mass in the process of mine development
2012 V. N. Zakharova, V. V. Arshavskii, A. V. Kharchenko
Some results of innovations in mining at the OJSC «KNAUF GIPS Novomoskovsk»
2012 Yu. V. Kovtun
Problem solving of design and planning of open pit mining in Mineframe system
2012 O. V. Nagovitsyn, S. V. Lukichev, A. Yu. Alisov
Influence of drilling facilities quality on the level of ocupational diseases
2012 G. V. Rudenko, I. A. Panchenko, D. A. Yungmeister, V. A. Pivnev
Designing of complex mining operations in coal mines
2012 O. V. Kovalev, S. P. Mozer, I. Yu. Tkhorikov
Substantiation of techniques and methods of technogeneous deposits forming represented by rock refuse and waste rock dumps at open pit mining
2012 S. P. Reshetnyak, A. V. Arkhipov