Abstract

The article describes the principles of the calendar planning in the present-day geological-and-mining systems of the open-pit and underground mining. At present, a set of tasks was outlined being solved with using these systems at ore mining plants and design companies. A common approach to data preparation for the calculation of a calendar plan in the open pit and underground mining is described, including the determination of geological, technological and economical parameters to obtain the co-variant results of calculations. The advantages of introduction of geological-and-mining systems into the field of designing work are shown.

Область исследования:
(Archived) Innovation in designing of mining plants
Keywords:
geological and mining systems calendar planning of mining operations
Funding:

None

Go to volume 198

Similar articles

Optimization of protective pillars parameters of mine shafts at the ore mines of OJSC «MMK «Norilsk Nickel»
2012 Yu. I. Zuev, S. N. Zelentsov, E. I. Kuznetsova, V. A. Zvezdkin, V. N. Karelin
Valuation of sustainable of pit wall
2012 M. G. Mustafin, A. P. Sannikova, P. I. Yushmanov
Innovative technologies in disigning of mining enterprises
2012 G. Yu. Sedykh
Microstructual mechanical behaviour of soils
2012 M. A. Karasev
Optimization of drainage systems of developed and perspective polymetallic deposits of Leninogorsky area of Rudniy Altai
2012 V. B. Kolpakov
To the question of maintenance of permanent workings ventilation-waste floor in techtonic stressed zones «Big Gorst» of «Taimyr» mine
2012 V. A. Zvezdkin, V. N. Karelin, T. S. Mushtekenov