Submit an Article
Become a reviewer
Vol 198
Pages:
30-36
Download volume:
RUS
Article

Substantiation of techniques and methods of technogeneous deposits forming represented by rock refuse and waste rock dumps at open pit mining

Authors:
S. P. Reshetnyak1
A. V. Arkhipov2
About authors
  • 1 — Ph.D., Dr.Sci. senior research assistant Mining Institute of the Kola Research Centre of the RAS
  • 2 — senior research assistant Mining Institute of the Kola Research Centre of the RAS
Date submitted:
2011-10-04
Date accepted:
2011-12-25
Date published:
2012-11-19

Abstract

There are large waste rock dumps and uneconomical ore storages when open pit mining is used. Mining companies must create these dumps and storages observing special rules, if mineral deposits might be utilized in future. The technological properties of ores and rocks as well as the conditions of forming and storage should be taken into consideration. It is possible to reach high productive efficiency if the market will demand these commodities.

Область исследования:
(Archived) Innovation in designing of mining plants
Keywords:
echnogeneous mineral deposits waste rock dumps ore storages technogeneous raw materials utilization and technogeneous deposits forming
Go to volume 198

References

  1. Reshetnyak S.P., Bilin A.L. Ways for creation of technologies for prepiling treatment of mineral raw materials // Complex mining of ore deposits with powerful deep open-pit mines: Proc. Int. Workshop (Melnikovskie reading)/Kola Research Center of the RAS. Apatity, 1995.

Similar articles

New ore and coal extracting and processing technologies at arcelormittal temirtau JSC mining plants
2012 F. Pannir, A. M. Gazaliev
The method of potash salt interchamber pillars stability control
2012 A. A. Baryakh, V. A. Asanov, I. A. Sanfirov
Peculiarities of prof. S.D.Korobov’s algorithm appliance in open-pit boundaries determination and mining operation regime justification
2012 A. L. Bilin
Studies of the stress-strain state of intrusion in the process of joint mining of ore deposits of the Oktyabrskiy and Talnakhskiy deposits
2012 A. N. Shabarov, V. A. Zvezdkin, A. G. Anokhin
Experience in application of geophysical methods for stress-strain state of rock mass control with the goal of altering design solutions in liquidation the flooding of the emergency section of mine № 1-5 of the Barentsburg coal deposit
2012 M. V. Shvankin, S. N. Mulev, A. P. Skakun, E. N. Rabota
Feasibility study of optimal parameters of pillars in designing rockburst-hazardous ore deposits development
2012 D. V. Sidorov, T. V. Ponomarenko