Calendar planning in present-day geological and mining systems

Authors:
R. A. Bagateev
About authors
  • National Mineral Resources University (Mining University)
Date submitted:
2011-10-30
Date accepted:
2011-12-06
Date published:
2012-11-19

Abstract

The article describes the principles of the calendar planning in the present-day geological-and-mining systems of the open-pit and underground mining. At present, a set of tasks was outlined being solved with using these systems at ore mining plants and design companies. A common approach to data preparation for the calculation of a calendar plan in the open pit and underground mining is described, including the determination of geological, technological and economical parameters to obtain the co-variant results of calculations. The advantages of introduction of geological-and-mining systems into the field of designing work are shown.

Go to volume 198

Similar articles

Generalized schemes of interaction between the powered support and roof
2012 M. A. Rozenbaum, S. G. Baranov, M. A. Loginov
Using of spatial models оf objects for geodetic monitoring of deformation processes
2012 M. G. Mustafin, A. V. Kovyazin
Laboratory equipment for research in mineral processing
2012 A. V. Bortnikov, A. D. Samukov, A. S. Stepanyan, A. O. Mezenin
Particularities of gold ore deposit development in complex environment
2012 V. A. Bakhtin, L. I. Boguslavskaya, S. V. Kiryukov, E. N. Kozlov, T. A. Prolomova, A. D. Fomenko
Monitoring and prognosis of anthropogenic and geomechanical processes in undermined rock mass in the process of mine development
2012 V. N. Zakharova, V. V. Arshavskii, A. V. Kharchenko
Interaction between seismic activity in Kuzbass and open-pit operations
2012 S. V. Tsirel, A. A. Pavlovich