Submit an Article
Become a reviewer
Vol 198
Pages:
16-23
Download volume:
RUS
Article

Experience in expert systems application for estimation of stress- strain state of rock mass for selection of safe methods of ore deposits mining

Authors:
A. A. Kozyrev1
V. I. Panin2
I. E. Semenova3
About authors
  • 1 — Ph.D., Dr.Sci. deputy director in the field of scienrtific researches Mining Institute of the Kola Research Center RAS
  • 2 — Ph.D., Dr.Sci. leading research assistant Mining Institute of the Kola Research Center RAS
  • 3 — Ph.D. senior research assistant Mining Institute of the Kola Research Center RAS
Date submitted:
2011-10-20
Date accepted:
2011-12-02
Date published:
2012-11-19

Abstract

The method of successive geomechanical estimation of stress-strain state of rock mass at different scale levels was developed. This method allows to carry out the regional and local prediction of formation of stress concentrated zones, and also to develop and adopt technology, which provides the decrease of dynamic rock pressure manifestations and rock burst prevention at mineral deposits.

Область исследования:
(Archived) Innovation in designing of mining plants
Keywords:
stress-strain state numerical methods prediction of rockburst -hazard safe mining operations
Funding:

None

Go to volume 198

References

  1. Kozyrev A.A., Panin V.I., Maltsev V.A., Svinin V.S.,Zaporozhets V.Yu., Pavlov D.A. Prediction and prevention of mining-induced seismicity at Khibiny apatite mines // Mining in the Arcitc. Saint Petersburg, 2005. P.15-25
  2. Directions on safe mining in rockburst-prone deposits . Apatity, 2002. 97 p.

Similar articles

Experience in application of geophysical methods for stress-strain state of rock mass control with the goal of altering design solutions in liquidation the flooding of the emergency section of mine № 1-5 of the Barentsburg coal deposit
2012 M. V. Shvankin, S. N. Mulev, A. P. Skakun, E. N. Rabota
Microstructual mechanical behaviour of soils
2012 M. A. Karasev
Advanced concentration technology of phosfatic- bearing ore of Oleniy ruchey deposit (Kola peninsula)
2012 V. I. Beloborodov, I. B. Zakharova, G. P. Andronov, N. M. Filimonova
Blasting charge diameter influence on the blasting efficiency
2012 Yu. I. Vinogradov, V. A. Artemov
Optimization of protective pillars parameters of mine shafts at the ore mines of OJSC «MMK «Norilsk Nickel»
2012 Yu. I. Zuev, S. N. Zelentsov, E. I. Kuznetsova, V. A. Zvezdkin, V. N. Karelin
Optimization of drainage systems of developed and perspective polymetallic deposits of Leninogorsky area of Rudniy Altai
2012 V. B. Kolpakov