Optimization of protective pillars parameters of mine shafts at the ore mines of OJSC «MMK «Norilsk Nickel»

Authors:
Yu. I. Zuev1
S. N. Zelentsov2
E. I. Kuznetsova3
V. A. Zvezdkin4
V. N. Karelin5
About authors
  • 1 — senior research assistant National Mineral Resources University (Mining University)
  • 2 — Ph.D. senior research assistant National Mineral Resources University (Mining University)
  • 3 — senior research assistant National Mineral Resources University (Mining University)
  • 4 — Ph.D. leading research assistant National Mineral Resources University (Mining University)
  • 5 — deputy director ZF OJSC MMK «Norilsk nickel»
Date submitted:
2011-10-24
Date accepted:
2011-12-24
Date published:
2012-11-19

Abstract

The Article presents the results of long-term investigations of the problem concerning the protection of shafts with pillars of reduced sizes under conditions of the Talnakh and Oktiabrsky deposits. The principal potentiality of partial mining of shaft-bottom pillars VS-3 and GS has been proved at the Oktiabrsky ore mine. Certain recommendations are given on optimization of parameters of shaft-bottom protective pillars.

Область исследования:
(Archived) Innovation in designing of mining plants
Keywords:
rock movement shaft-bottom pillar optimization of parameters protection of undermined objects
Funding:

None

Go to volume 198

References

  1. Directions on protection of constructions and natural objects positioned within the zone of influence of under-ground mining operations at the divertions of the Talnakh and Oktiabrsky ore deposits. Norilsk, 2006. 45 p.

Similar articles

Mechanizаtion of steep thick coal seams working
2012 L. F. Kozhukhov, K. V. Struk
Experience in application of geophysical methods for stress-strain state of rock mass control with the goal of altering design solutions in liquidation the flooding of the emergency section of mine № 1-5 of the Barentsburg coal deposit
2012 M. V. Shvankin, S. N. Mulev, A. P. Skakun, E. N. Rabota
Substantiation of the necessity of solving the problem of technogeneous deformation phenomena prevention in pit quarries and coal sections
2012 S. P. Bryakov
Blasting charge diameter influence on the blasting efficiency
2012 Yu. I. Vinogradov, V. A. Artemov
Interaction between seismic activity in Kuzbass and open-pit operations
2012 S. V. Tsirel, A. A. Pavlovich
The method of potash salt interchamber pillars stability control
2012 A. A. Baryakh, V. A. Asanov, I. A. Sanfirov