Submit an Article
Become a reviewer
Vol 198
Pages:
227
Download volume:

New ore and coal extracting and processing technologies at arcelormittal temirtau JSC mining plants

Authors:
F. Pannir1
A. M. Gazaliev2
About authors
  • 1 — JSC ArcelorMittal Temirtau
  • 2 — Karaganda State Technical Univeersity
Date submitted:
2011-10-21
Date accepted:
2011-12-18
Date published:
2012-04-01

Abstract

Annotation describes recovery and iron ore beneficiation technologies at Lisakovsk minefield, including facilities and concentrate dephosphorisation process. Paper represents development and coal mining technological advancement prospects at Karaganda coal basin (ArcelorMittal Temirtau JSC), in cooperation with DMT Ltd (Germany).

Go to volume 198

Similar articles

Problems and ways of exploration of the raw material resources base of the Subarctic branch of MMK «Norisk nickel»
2012 E. I. Muravev, V. N. Karelin, A. N. Shabarov
Problem solving of design and planning of open pit mining in Mineframe system
2012 O. V. Nagovitsyn, S. V. Lukichev, A. Yu. Alisov
Feasibility study of optimal parameters of pillars in designing rockburst-hazardous ore deposits development
2012 D. V. Sidorov, T. V. Ponomarenko
Mechanizатion of steep thick coal seams working
2012 L. F. Kozhukhov, K. V. Struk
Laboratory equipment for research in mineral processing
2012 A. V. Bortnikov, A. D. Samukov, A. S. Stepanyan, A. O. Mezenin
To the question of maintenance of permanent workings ventilation-waste floor in techtonic stressed zones «Big Gorst» of «Taimyr» mine
2012 V. A. Zvezkin, V. N. Karelin, T. S. Mushtekenov