Problem solving of design and planning of open pit mining in Mineframe system

Authors:
O. V. Nagovitsyn1
S. V. Lukichev2
A. Yu. Alisov3
About authors
  • 1 — Ph.D. Mining Institute of the Kola Research Center of the RAS
  • 2 — Ph.D., Dr.Sci. Mining Institute of the Kola Research Center of the RAS
  • 3 — post-graduate student Mining Institute of the Kola Research Center of the RAS
Date submitted:
2011-10-29
Date accepted:
2011-12-26
Date published:
2012-11-19

Abstract

The article presents the results of development for computer-aided design and planning of open-pit mines with the Mineframe software. There have been shown such peculiarities of computer-aided planning process as horizon reserves, development of annual cutbacks, searching of quarterly (monthly) volumes, monthly scheduling of equipment operation placed on benches, solution of the problems of ten-day periods, daily and shifts planning based on bench modeling.

Область исследования:
(Archived) Innovation in designing of mining plants
Keywords:
open pit planning design automation modeling
Go to volume 198

References

  1. Kaputin Yu.E. Information technologies of planning of mining operations (for mining engineers). St.Petersburg: Nedra, 2004. 424 p.
  2. Lukichev S.V., Nagovitsyn O.V. Comput er -aided Mine-Frame system 3.0 // J.Mining industry. 2005. N 6. P.32-35 .
  3. Arsentiev A.I., Sovetot A., Khokhryakov V.S., Bevz N.D., Bliznyukov V.Y. Planning of mining operations at open- pit mines. Moscow: N edra, 1972. 152 p.
  4. Improvement of methods for designing and planning of mining operations at open-pit mines / Edited by Acad. Melnikov. Leningrad: Nayka, 1981. 280 p.

Similar articles

Innovative technologies in disigning of mining enterprises
2012 G. Yu. Sedykh
Factors of alumina dust formation in primary aluminum production
2012 V. M. Sizyakov, A. A. Vlasov, V. Yu. Bazhin, V. V. Gembitskii
To the question of maintenance of permanent workings ventilation-waste floor in techtonic stressed zones «Big Gorst» of «Taimyr» mine
2012 V. A. Zvezdkin, V. N. Karelin, T. S. Mushtekenov
Monitoring and prognosis of anthropogenic and geomechanical processes in undermined rock mass in the process of mine development
2012 V. N. Zakharova, V. V. Arshavskii, A. V. Kharchenko
The method of potash salt interchamber pillars stability control
2012 A. A. Baryakh, V. A. Asanov, I. A. Sanfirov
The design decision of technology of polymetallic ores enrichment in copper concentrating factory of MDK «Khandiza»
2012 P. I. Kalandrov, B. I. Iskandarov, B. S. Abriev