Blasting charge diameter influence on the blasting efficiency

Authors:
Yu. I. Vinogradov1
V. A. Artemov2
About authors
  • 1 — Ph.D. associate professor National Mineral Resources University (Mining University)
  • 2 — National Mineral Resources University (Mining University)
Date submitted:
2011-10-19
Date accepted:
2011-12-24
Date published:
2012-11-19

Abstract

Research carried out proves that blast seismic effect i.e. displacement velocity in a seismic wave and efficiency are the function of specific charge with rock mass contact surface. Dependence of blasting fragmentation coefficient from diameters and charge density variation is given.

Область исследования:
(Archived) Innovation in designing of mining plants
Keywords:
diameters charge density charge surface displacement velocity blasting fragmentation efficiency blasting
Funding:

None

Go to volume 198

References

  1. Vinogradov Y.I. The investigation of specific power inputs and boreholes arrangement influence on the blasting rock fragmentation efficiency: Research Paper / Leningrad Mining Institute. Leningrad, 1976. 23 p.
  2. Vinogradov Y.I. Possibility main work forms of blasting energy distribution // New mining researches / Len-ingrad Mining Institute. Leningrad, 1975. N 8. P.7-9.
  3. Makariev V.P. Seismic waves measurement in the rock during blasting of explosive charge with constant energy and changing diameter // Y.I.Vinogradov, M.A.Nefedov, E.A.Deev // Blasting work. 1983. N 85/42. P.124 -127.

Similar articles

To the question of maintenance of permanent workings ventilation-waste floor in techtonic stressed zones «Big Gorst» of «Taimyr» mine
2012 V. A. Zvezdkin, V. N. Karelin, T. S. Mushtekenov
Substantiation of the necessity of solving the problem of technogeneous deformation phenomena prevention in pit quarries and coal sections
2012 S. P. Bryakov
Interaction between seismic activity in Kuzbass and open-pit operations
2012 S. V. Tsirel, A. A. Pavlovich
Optimization of protective pillars parameters of mine shafts at the ore mines of OJSC «MMK «Norilsk Nickel»
2012 Yu. I. Zuev, S. N. Zelentsov, E. I. Kuznetsova, V. A. Zvezdkin, V. N. Karelin
Controls allowed earth deformation construction vertical openings in built-up area
2012 M. G. Mustafin, A. S. Naumov
Experience in expert systems application for estimation of stress- strain state of rock mass for selection of safe methods of ore deposits mining
2012 A. A. Kozyrev, V. I. Panin, I. E. Semenova