Particularities of gold ore deposit development in complex environment

Authors:
V. A. Bakhtin1
L. I. Boguslavskaya2
S. V. Kiryukov3
E. N. Kozlov4
T. A. Prolomova5
A. D. Fomenko6
About authors
  • 1 — CJSC «Saint Petersburg Mining Project and Engineering Company»
  • 2 — CJSC «Saint Petersburg Mining Project and Engineering Company»
  • 3 — CJSC «Saint Petersburg Mining Project and Engineering Company»
  • 4 — CJSC «Saint Petersburg Mining Project and Engineering Company»
  • 5 — CJSC «Saint Petersburg Mining Project and Engineering Company»
  • 6 — CJSC «Saint Petersburg Mining Project and Engineering Company»
Date submitted:
2011-10-18
Date accepted:
2011-12-09
Date published:
2012-04-01

Abstract

Review of the design experience in the open-cut development of a very large gold ore steeply pitching deposit are given. Complicating factors are previous underground workings and pressure subpermafrost waters. Opening of depth horizons by ore and rock incline conveyor shafts. Crushing of ore and rock in an open-pit mine before they are delivered to conveyors by semi-mobile crushers. Water depression by ring-type workings with transportation of the collected water by conveyor shafts.

Go to volume 198

Similar articles

Laboratory equipment for research in mineral processing
2012 A. V. Bortnikov, A. D. Samukov, A. S. Stepanyan, A. O. Mezenin
Interaction between seismic activity in Kuzbass and open-pit operations
2012 S. V. Tsirel, A. A. Pavlovich
Experience in ore reserves extraction in open-pit borders and bottom in transition from open-pit to underground mining
2012 M. S. Tankov, I. S. Shelkovyi
Controls allowed earth deformation construction vertical openings in built-up area
2012 M. G. Mustafin, A. S. Naumov
Prognosis and effective prevention of rock bursts in underground coal mines in Slovakia
2012 Zh. V. Zhurov, Zh. Khizh
Experience in application of geophysical methods for stress-strain state of rock mass control with the goal of altering design solutions in liquidation the flooding of the emergency section of mine № 1-5 of the Barentsburg coal deposit
2012 M. V. Shvankin, S. N. Mulev, A. P. Skakun, E. N. Rabota