Monitoring and prognosis of anthropogenic and geomechanical processes in undermined rock mass in the process of mine development

Authors:
V. N. Zakharova1
V. V. Arshavskii2
A. V. Kharchenko3
About authors
  • 1 — Ph.D., Dr.Sci. laboratory head Institute of Comprehensive Exploitation of Mineral Resources of the RAS
  • 2 — Ph.D. leading research assistant Institute of Comprehensive Exploitation of Mineral Resources of the RAS
  • 3 — Ph.D. senior research assistant Institute of Comprehensive Exploitation of Mineral Resources of the RAS
Date submitted:
2011-10-09
Date accepted:
2011-12-19
Date published:
2012-11-19

Abstract

Principles of complex monitoring of anthropogenic geomechanical processes of the operating mining enterprise on the basis of geo-information technology are developed. They allow to form and maintain digital geospatial model of mine development timely and effectively. In a mode of real time it allows to carry out geophysical and geomechanical monitoring of an undermine rocks and to plan and operate technological processes timely, to raise mining operation safety.

Область исследования:
(Archived) Innovation in designing of mining plants
Keywords:
rock mass geophysical monitoring geomechanical monitoring geospatial model anthropogenic processes tomography lineament
Funding:

None

Go to volume 198

Similar articles

Studies of the stress-strain state of intrusion in the process of joint mining of ore deposits of the Oktyabrskiy and Talnakhskiy deposits
2012 A. N. Shabarov, V. A. Zvezdkin, A. G. Anokhin
Substantiation of techniques and methods of technogeneous deposits forming represented by rock refuse and waste rock dumps at open pit mining
2012 S. P. Reshetnyak, A. V. Arkhipov
New technologies for analysis and revision of risks in the planetary-cosmic genesis in designing оf mining operations
2012 A. N. Shabarov, B. G. Tarasov, S. N. Mulev, L. V. Bugaenko
Scientific provision of disigning mineral deposit mining
2012 A. V. Kotenkov, I. G. Kharisov
Valuation of sustainable of pit wall
2012 M. G. Mustafin, A. P. Sannikova, P. I. Yushmanov
To the question of maintenance of permanent workings ventilation-waste floor in techtonic stressed zones «Big Gorst» of «Taimyr» mine
2012 V. A. Zvezdkin, V. N. Karelin, T. S. Mushtekenov