Optimization of protective pillars parameters of mine shafts at the ore mines of OJSC «MMK «Norilsk Nickel»
About authors
- 1 — National Mineral Resources University (Mining University)
- 2 — National Mineral Resources University (Mining University)
- 3 — National Mineral Resources University (Mining University)
- 4 — National Mineral Resources University (Mining University)
- 5 — ZF OJSC MMK «Norilsk nickel»
Abstract
The Article presents the results of long-term investigations of the problem concerning the protection of shafts with pillars of reduced sizes under conditions of the Talnakh and Oktiabrsky deposits. The principal potentiality of partial mining of shaft-bottom pillars VS-3 and GS has been proved at the Oktiabrsky ore mine. Certain recommendations are given on optimization of parameters of shaft-bottom protective pillars.
References
- Указания по охране сооружений и природных объектов, находящихся в зоне влияния подземных горных работ на горных отводах Талнахского и Октябрьского месторождений. Норильск, 2006. 45 с.
Similar articles
Experience in application of geophysical methods for stress-strain state of rock mass control with the goal of altering design solutions in liquidation the flooding of the emergency section of mine № 1-5 of the Barentsburg coal deposit
2012 M. V. Shvankin, S. N. Mulev, A. P. Skakun, E. N. Rabota
Interaction between seismic activity in Kuzbass and open-pit operations
2012 S. V. Tsirel, A. A. Pavlovich
Science-based procedural guidelines for coalmine methane drainage under conditions of higly gas-bearing seam intensive mining
2012 V. B. Artemev, A. D. Ruban, V. N. Zakharov, V. S. Zaburyadev