Submit an Article
Become a reviewer
Vol 198
Pages:
108-113
Download volume:
RUS
Article

Generalized schemes of interaction between the powered support and roof

Authors:
M. A. Rozenbaum1
S. G. Baranov2
M. A. Loginov3
About authors
  • 1 — Ph.D., Dr.Sci. laboratory head National Mineral Resources University (Mining University)
  • 2 — Ph.D., Dr.Sci. leading research assistant National Mineral Resources University (Mining University)
  • 3 — chief engineer The Kirov mine, OJSC «SUEK-Kuzbas»
Date submitted:
2011-10-20
Date accepted:
2011-12-13
Date published:
2012-11-19

Abstract

The paper considers three basic schemes of roof failure above the face bottom of long-wall during mining operations covering the whole diversity of mechanisms of support-roof interaction. The model of interaction between the powered support and heavy roof is given as well as the calculated scheme for the determination of necessary rated resistance of roof.

Область исследования:
(Archived) Innovation in designing of mining plants
Keywords:
roof schemes of failure powered support rated resistance mechanism of support-roof interaction
Go to volume 198

References

  1. Baranov S.G., Polyakov S.V., Galaev A.N. Results of Investigations of Changes in Loading Parameters of Hydraul ic Props of the M 142 Support in Subsidence // Rock pressure Control and Prediction of Safe Conditions in Explora tion of Coal Deposits / VNIMI. Leningrad, 1991. P. 116- 121 .
  2. GOST R 52152-2003. Powered supports for long-walls. Moscow: Publ. Standarts, 2003 38 p.
  3. Orlov A.A., Baranov S.G., Myshlyaev B.K. Roof support and its control in the integrated powered faces. Moscow : Nedra, 1993. P.143- 165.

Similar articles

Controls allowed earth deformation construction vertical openings in built-up area
2012 M. G. Mustafin, A. S. Naumov
Mechanism of infuence on the powered roof support of rocks under different schemes of its failure above the mined-out space
2012 S. G. Baranov, M. A. Rozenbaum
New technologies for analysis and revision of risks in the planetary-cosmic genesis in designing оf mining operations
2012 A. N. Shabarov, B. G. Tarasov, S. N. Mulev, L. V. Bugaenko
To the question of maintenance of permanent workings ventilation-waste floor in techtonic stressed zones «Big Gorst» of «Taimyr» mine
2012 V. A. Zvezdkin, V. N. Karelin, T. S. Mushtekenov
Safety problems of mining operations in high-stress hard rock massif
2012 A. A. Kozyrev, V. I. Panin, Yu. V. Fedotova
Scientific support of the planning process of intensive coal seams mining technologies
2012 O. I. Kazanin, A. A. Romashkevich