The method of potash salt interchamber pillars stability control
About authors
- 1 — Ph.D., Dr.Sci. director Ural branch of the RAS
- 2 — Ph.D., Dr.Sci. laboratory head Ural branch of the RAS
- 3 — Ph.D., Dr.Sci. deputy director Ural branch of the RAS
Abstract
The research of potash salt rock deforming and damaging features has made it possible to develop the method of load bearing element state examination by chamber-and-pillar system. This method consists in instrumental control of pillars by geophysical and in situ methods with following prognosis of their residual life by mathematical simulation methods.
Область исследования:
(Archived) Innovation in designing of mining plants
Funding:
None
Similar articles
Prognosis and effective prevention of rock bursts in underground coal mines in Slovakia
2012 Zh. V. Durov, Zh. Khizh
The design decision of technology of polymetallic ores enrichment in copper concentrating factory of MDK «Khandiza»
2012 P. I. Kalandrov, B. I. Iskandarov, B. S. Abriev
To the question of maintenance of permanent workings ventilation-waste floor in techtonic stressed zones «Big Gorst» of «Taimyr» mine
2012 V. A. Zvezdkin, V. N. Karelin, T. S. Mushtekenov
Scientific support of the planning process of intensive coal seams mining technologies
2012 O. I. Kazanin, A. A. Romashkevich