Submit an Article
Become a reviewer
Vol 198
Pages:
219-222
Download volume:
RUS
Article

Innovate technologies in waste of extraction and nonmetallic raw materials processing

Authors:
V. A. Arsentev1
V. Z. Marmandyan2
A. D. Samukov3
A. M. Kabirov4
About authors
  • 1 — Ph.D., Dr.Sci. director in research and development Mekhanobr-Tekhnika Research and Engineering Corporation
  • 2 — chief expert Mekhanobr-Tekhnika Research and Engineering Corporation
  • 3 — head of technological department Mekhanobr-Tekhnika Research and Engineering Corporation
  • 4 — chief constructor PDB Automatika Joint-stock company
Date submitted:
2011-10-22
Date accepted:
2011-12-29
Date published:
2012-11-19

Abstract

The paper deals with the problems of crushed stone screening wastes recycling and commercial utilization of the products obtained. Application of pulsed vibration technique made it possible to minimize generation of screening wastes in crushed stone production and provided means for obtaining high-quality fillers for production of compact fine-grained concretes and cell concrete.

Область исследования:
(Archived) Innovation activity and advances for higher efficiency of production ad plants оf mining-metallurgical complex
Keywords:
aggregate production wastes cell concrete fine concrete mechanical activation pulsed vibration crushing vibration classification
Go to volume 198

Similar articles

Microstructual mechanical behaviour of soils
2012 M. A. Karasev
Feasibility study of optimal parameters of pillars in designing rockburst-hazardous ore deposits development
2012 D. V. Sidorov, T. V. Ponomarenko
Experience in application of geophysical methods for stress-strain state of rock mass control with the goal of altering design solutions in liquidation the flooding of the emergency section of mine № 1-5 of the Barentsburg coal deposit
2012 M. V. Shvankin, S. N. Mulev, A. P. Skakun, E. N. Rabota
Problem solving of design and planning of open pit mining in Mineframe system
2012 O. V. Nagovitsyn, S. V. Lukichev, A. Yu. Alisov
Substantiation of techniques and methods of technogeneous deposits forming represented by rock refuse and waste rock dumps at open pit mining
2012 S. P. Reshetnyak, A. V. Arkhipov
To the question of maintenance of permanent workings ventilation-waste floor in techtonic stressed zones «Big Gorst» of «Taimyr» mine
2012 V. A. Zvezdkin, V. N. Karelin, T. S. Mushtekenov