To the question of maintenance of permanent workings ventilation-waste floor in techtonic stressed zones «Big Gorst» of «Taimyr» mine
About authors
- 1 — Ph.D. leading research assistant National Mineral Resources University (Mining University)
- 2 — deputy director of the mineral complex ZF OJSC MMK «Norilsk Nickel»
- 3 — chief engineer of «Taimyr» mine ZF OJSC MMK «Norilsk Nickel»
Abstract
Factors complicating drifting processes and barring in situ, disintegrated by tectonic burst- ing are considered. The analysis of stress-strain state formation of rock massif in the vicinity of tectonic disturbance is presented and practical recommendations concerning drifting and barring are given.
Область исследования:
(Archived) Innovation in designing of mining plants
References
- Advice on safe mining at Talnakhskiy and Oktyabrsky deposits prone and dangerous to rock bursts. Norilsk, 2001. 107 p.
Similar articles
Studies of the stress-strain state of intrusion in the process of joint mining of ore deposits of the Oktyabrskiy and Talnakhskiy deposits
2012 A. N. Shabarov, V. A. Zvezdkin, A. G. Anokhin
Experience in expert systems application for estimation of stress- strain state of rock mass for selection of safe methods of ore deposits mining
2012 A. A. Kozyrev, V. I. Panin, I. E. Semenova
Influence of drilling facilities quality on the level of ocupational diseases
2012 G. V. Rudenko, I. A. Panchenko, D. A. Yungmeister, V. A. Pivnev
Problem solving of design and planning of open pit mining in Mineframe system
2012 O. V. Nagovitsyn, S. V. Lukichev, A. Yu. Alisov