Submit an Article
Become a reviewer
Vol 198
Pages:
86-90
Download volume:
RUS
Article

Designing of complex mining operations in coal mines

Authors:
O. V. Kovalev1
S. P. Mozer2
I. Yu. Tkhorikov3
About authors
  • 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
  • 2 — Ph.D. associate professor National Mineral Resources University (Mining University)
  • 3 — Ph.D. research assistant National Mineral Resources University (Mining University)
Date submitted:
2011-10-19
Date accepted:
2011-12-13
Date published:
2012-11-19

Abstract

The basic laws of gas filtration at different stages of coal deposit mining are considered. The technique used for studying complex development of power resources of coal deposits, allowing with reference to concrete conditions to receive engineering dependences for a quantitative estimation of all key parametres of investigated processes is given. On the basis of the developed approach to complex development the algorithm of the practical solution of the problem is offered.

Область исследования:
(Archived) Innovation in designing of mining plants
Keywords:
gas filtration coal deposit engineering dependences algorithm of the practical solution of a problem
Go to volume 198

References

  1. Mozer S.P., Kurtukov E.B. Rock mechanics: basic physics and mechanism of occurrence of geomechanical processes in underground mining / Saint Petersburg: Nedra, 2009.136 p.
  2. Petrenko E.V. Development of innovative activity in Russia coal branch // Ugol. 2006. No 1. Р.30- 34.
  3. Puchkov L.A., Slastunov S.V. Decision of problems of coal methane: methane-safety, an industrial gas produc-tion, ecology // Ugol . 2005. No 5. Р . 5-7.

Similar articles

The method of potash salt interchamber pillars stability control
2012 A. A. Baryakh, V. A. Asanov, I. A. Sanfirov
Scientific provision of disigning mineral deposit mining
2012 A. V. Kotenkov, I. G. Kharisov
Feasibility study of optimal parameters of pillars in designing rockburst-hazardous ore deposits development
2012 D. V. Sidorov, T. V. Ponomarenko
Valuation of sustainable of pit wall
2012 M. G. Mustafin, A. P. Sannikova, P. I. Yushmanov
Geomechanic assessment of technological decisions for designing mining operations in of burst hazrdous conditions
2012 I. Yu. Rasskazov, G. A. Kursakin, M. I. Potapchuk, M. I. Rasskazov
Experience in application of geophysical methods for stress-strain state of rock mass control with the goal of altering design solutions in liquidation the flooding of the emergency section of mine № 1-5 of the Barentsburg coal deposit
2012 M. V. Shvankin, S. N. Mulev, A. P. Skakun, E. N. Rabota