способ подземной разработки

Geotechnical Engineering and Engineering Geology
  • Date submitted
    2024-04-24
  • Date accepted
    2024-09-24
  • Date published
    2024-11-12

Study and justification of the combination of beneficiation processes for obtaining flake graphite from technogenic carbon-containing dusts

Article preview

The most important task of modern production development is to provide the mineral and raw materials sector of the economy with resources included in the list of strategic raw materials, including flake graphite. In addition to natural raw materials, the source of its obtaining can be metallurgical production wastes not involved in processing. Development of metallurgical dust beneficiation technology will solve the problem of obtaining high-purity flake graphite with a crystal structure close to ideal and in demand in the production of high-tech materials. It will allow creating a renewable raw material base of graphite and utilising metallurgical production wastes. The research included the study of dust beneficiation by coarseness, magnetic and flotation methods, the influence of dust disintegration processes on beneficiation indicators. Based on the established technological properties of the components of dusts, magnetic, flotation and gravity beneficiation methods can be applied for their separation in different sequence. It is shown that dusts from different sites have different enrichability by these methods, and it should be taken into account when developing a complex technology of their processing. The degree of beneficiation increases in a row of dusts from the blast furnace shop (BF) – electric steel smelting shop (ESS) – oxygen-converter shop (OCS). The method of grinding has a significant influence on the separation indicators – at dry grinding in a centrifugal-impact mill with subsequent pneumatic classification the quality of graphite concentrates increases by 22.7 % of carbon for BF dust and by 13.48 % of carbon for ESS dust. OCS dust beneficiation indicators are high at coarse grinding with steel medium – mass fraction of carbon 96.1 %.

How to cite: Orekhova N.N., Fadeeva N.V., Musatkina E.N. Study and justification of the combination of beneficiation processes for obtaining flake graphite from technogenic carbon-containing dusts // Journal of Mining Institute. 2024. Vol. 269 . p. 777-788. EDN UNUYXS
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2023-06-01
  • Date accepted
    2024-03-05
  • Date published
    2024-08-26

Analyzing friction bolts load bearing capacity in varying rock masses: an experimental study in Anti Atlas Imiter silver mining region, Morocco

Article preview

This study analyzes how key factors impact friction rock bolt capacity using standard pull-out tests, focusing on 39 mm diameter, 180 cm long split-tube bolts. We investigate bolt performance dependence on rock mass rating (RMR), time after installation, schistosity orientation, surface roughness, and installation quality. The aim is optimizing bolt design and implementation for enhanced underground stability and safety. Results show RMR strongly exponentially correlates with pull-out resistance; higher quality rock masses increase capacity. Anchorage capacity significantly rises over time, especially for RMR above 70. Increasing angle between bolt axis and rock foliation from 0 to 90° boosts pull-out response. Reducing borehole diameter below bolt diameter grows bolt-ground friction. Empirical models estimate load capacity based on RMR, time, orientation, diameter, roughness and installation quality. These reliably predict bolt performance from site conditions, significantly improving on basic RMR methods. Experiments provide practical friction bolt behavior insights for typical rock masses. The data-driven analysis ensures models are applicable to actual underground scenarios. This enables tailored optimization of bolting configurations and supports. Methodologies presented should improve safety, efficiency and cost-effectiveness of reinforced mining and tunneling. Overall, this study fundamentally furthers friction bolt performance understanding, enabling superior underground support design.

How to cite: Amine S., Latifa O., Mohammed S., Youssef Z., Anas B. Analyzing friction bolts load bearing capacity in varying rock masses: an experimental study in Anti Atlas Imiter silver mining region, Morocco // Journal of Mining Institute. 2024. Vol. 268 . p. 669-682.
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2022-05-20
  • Date accepted
    2023-06-20
  • Date published
    2024-02-29

Increasing the quality of zeolite-bearing rocks from Eastern Transbaikalia by applying directed energy

Article preview

This paper presents the use of accelerated electrons to treat zeolite-bearing rocks from Eastern Transbaikalia to increase the efficiency of separating zeolites from rock-forming minerals via electromagnetic separation. The effectiveness of the liberation of zeolite minerals using accelerated electrons was analyzed. The results of dry electromagnetic separation of zeolite-bearing rocks are presented. The dependence of the extraction of iron-bearing minerals from zeolite-bearing rocks by electromagnetic separation on the magnetic field intensity for different particle sizes has been established. The main methods of zeolite-bearing rock enrichment and ore preparation were determined. A technological scheme for processing zeolite-bearing rocks, based on the use of accelerated electron treatment at the ore preparation stage, is presented, significantly improving the zeolite production quality.

How to cite: Razmakhnin K.K., Khatkova A.N., Shumilova L.V. Increasing the quality of zeolite-bearing rocks from Eastern Transbaikalia by applying directed energy // Journal of Mining Institute. 2024. Vol. 265 . p. 129-139. EDN VNPZCT
Modern Trends in Hydrocarbon Resources Development
  • Date submitted
    2022-05-31
  • Date accepted
    2022-11-17
  • Date published
    2022-12-29

Estimation of the influence of fracture parameters uncertainty on the dynamics of technological development indicators of the Tournaisian-Famennian oil reservoir in Sukharev oil field

Article preview

Issues related to the influence of reservoir properties uncertainty on oil field development modelling are considered. To increase the reliability of geological-hydrodynamic mathematical model in the course of multivariate matching, the influence of reservoir properties uncertainty on the design technological parameters of development was estimated, and their mutual influence was determined. The optimal conditions for the development of the deposit were determined, and multivariate forecasts were made. The described approach of history matching and calculation of the forecast of technological development indicators allows to obtain a more reliable and a less subjective history match as well as to increase the reliability of long-term and short-term forecasts.

How to cite: Kochnev A.A., Kozyrev N.D., Krivoshchekov S.N. Estimation of the influence of fracture parameters uncertainty on the dynamics of technological development indicators of the Tournaisian-Famennian oil reservoir in Sukharev oil field // Journal of Mining Institute. 2022. Vol. 258 . p. 1026-1037. DOI: 10.31897/PMI.2022.102
Modern Trends in Hydrocarbon Resources Development
  • Date submitted
    2022-03-25
  • Date accepted
    2022-09-06
  • Date published
    2022-12-29

Autoclave modeling of corrosion processes occurring in a gas pipeline during transportation of an unprepared multiphase medium containing CO2

Article preview

The problem of selecting a method for ensuring the reliability of the unprepared fluid transport facilities of an unprepared fluid in the presence of carbon dioxide is considered. Carbon dioxide corrosion is one of the dangerous types of damage to field and main pipelines. It has been shown that dynamic autoclave tests should be carried out during staged laboratory tests in order to determine the intensity of carbon dioxide corrosion and to select the optimal method of protection. A hypothesis about the imperfection of the existing generally accepted approaches to dynamic corrosion testing has been put forward and confirmed. A test procedure based on the use of an autoclave with an overhead stirrer, developed using elements of mathematical modeling, is proposed. The flows created in the autoclave provide corrosive wear of the sample surface similar to the internal surfaces elements wear of the pipelines piping of gas condensate wells. The autoclave makes it possible to simulate the effect of the organic phase on the flow rate and the nature of corrosion damage to the metal surface, as well as the effect of the stirrer rotation speed and, accordingly, the shear stress of the cross section on the corrosion rate in the presence/absence of a corrosion inhibitor. The given results of staged tests make it possible to judge the high efficiency of the developed test procedure.

How to cite: Shaposhnikov N.О., Golubev I.A., Khorobrov S.V., Kolotiy A.I., Ioffe A.V., Revyakin V.А. Autoclave modeling of corrosion processes occurring in a gas pipeline during transportation of an unprepared multiphase medium containing CO2 // Journal of Mining Institute. 2022. Vol. 258 . p. 915-923. DOI: 10.31897/PMI.2022.92
Modern Trends in Hydrocarbon Resources Development
  • Date submitted
    2022-03-24
  • Date accepted
    2022-07-21
  • Date published
    2022-12-29

A probabilistic study on hole cleaning optimization

Article preview

Hole cleaning is considered as one of the most important drilling fluid functions. An efficient hole cleaning ensures a reliable well drilling practice with minimum troublesome problems. In this study, two main steps of hole cleaning, i.e., cuttings removal from under the bit and cuttings transport to the surface are discussed based on the drilling data of a shale formation. The traditional models for optimization of each step are presented. As the models require variety of input data, which are usually subjected to some extent of errors and uncertainties, the output of the model is also an uncertain parameter. Using Monte Carlo simulation, a simple probabilistic study was conducted to quantify the certainty level of the obtained results. Based on the result of this study, it is shown that for the proposed well, a good hole cleaning is expected. However, a more reliable decision for further hole cleaning optimization should be made considering the results of uncertainty analysis.

How to cite: Tabatabaee Moradi S.S. A probabilistic study on hole cleaning optimization // Journal of Mining Institute. 2022. Vol. 258 . p. 956-963. DOI: 10.31897/PMI.2022.67
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2022-04-05
  • Date accepted
    2022-07-21
  • Date published
    2022-11-10

Development of resource-saving technology for excavation of flat-lying coal seams with tight roof rocks (on the example of the Quang Ninh coal basin mines)

Article preview

It is shown that the creation of the variants of resource-saving systems for the development of long-column mining is one of the main directions for improving the technological schemes for mining operations in the mines of the Kuang Nin coal basin. They provide a reduction in coal losses in the inter-column pillars and the cost of maintaining preliminary workings fixed with anchorage. The implementation of these directions is difficult (and in some cases practically impossible) when tight rocks are lying over the coal seam, prone to significant hovering in the developed space. In the Quang Ninh basin, 9-10 % of the workings are anchored, the operational losses of coal reach 30 % or more; up to 50 % of the workings are re-anchored annually. It is concluded that the real conditions for reducing coal losses and the effective use of anchor support as the main support of reusable preliminary workings are created when implementing the idea put forward at the St. Petersburg Mining University: leaving the coal pillar of increased width between the reused mine working and the developed space and its subsequent development on the same line with the stoping face simultaneously with the reclamation of the reused mine working.

How to cite: Zubov V.P., Phuc L.Q. Development of resource-saving technology for excavation of flat-lying coal seams with tight roof rocks (on the example of the Quang Ninh coal basin mines) // Journal of Mining Institute. 2022. Vol. 257 . p. 795-806. DOI: 10.31897/PMI.2022.72
Economic Geology
  • Date submitted
    2022-06-02
  • Date accepted
    2022-07-21
  • Date published
    2022-10-05

Substantiation of the optimal performance parameters for a quarry during the stage-wise development of steeply dipping ore deposits

Article preview

The use of stage-wise schemes in the development of deep quarries is one of the ways to increase the economic efficiency of mining a deposit and determining the optimal stage parameters remains an urgent task. Such parameters are stage depth, bench height, block length, etc. However, there is a wide range of values for these parameters. Therefore, to select the optimal values and evaluate the effectiveness of design solutions, it is advisable to use the net present value, which is an international notion. As a result of the analysis of data on deposits, a large number of variable indicators can be identified that presumably affect the efficiency of mining. The article proposes to divide all parameters of the quarry mining into two types: mine engineering and economic. The importance of each of them is determined by the measure of influence on the net present value. Thus, to assess the measure of influence of mining indicators, the average values of each of them are taken, and as a result of the alternating change of one parameter under study, the measure of its influence on the discounted income received is estimated. The results of the analysis of relevant factors, their evaluation and comparative analysis are important indicators that significantly affect the design decisions made and the effectiveness of the investment project.

How to cite: Fomin S.I., Ovsyannikov M.P. Substantiation of the optimal performance parameters for a quarry during the stage-wise development of steeply dipping ore deposits // Journal of Mining Institute. 2022. p. DOI: 10.31897/PMI.2022.73
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2021-02-24
  • Date accepted
    2021-10-18
  • Date published
    2021-12-16

A probabilistic approach to the dynamic cut-off grade assessment

Article preview

Cut-off grade is an important conditioning parameter that determines the quantity and quality of recoverable reserves and development efficiency. Today, Russian mining companies operate with certified quality requirements. By setting permanent quality requirements, the government seeks to prevent depletion of reserves, reduced production during periods of falling prices, and decreased budget revenues, expressing the interests of all members of society. But to what extent do the permanent quality requirements protect the interests of the state? The answer to this question is ambiguous and does not lie on the surface. The State Commission for Reserves and domestic researchers are working to find a rational solution to the problem of quality requirements. One solution is dynamic quality requirements. The effectiveness of their application has been proven for individual mining companies, but it is incorrect to transfer these conclusions to the entire mineral resource base of the country. This article presents a new approach to determining the dynamic cut-off grade, which varies depending on the price of minerals. The dynamic cut-off grade is proposed to be determined based on the indicators of constant requirements to the quality of exploration work, using the maximum allowable costs in the region. The approach allows to calculate the effect of the introduction of dynamic cut-off grade in the practice of subsurface use for the state (in the form of the amount of taxes received) and for subsoil users (in the form of the amount of income). For a group of gold-bearing deposits with open-pit mining method, it was established that the development of reserves using dynamic values of the cut-off grade in periods of price changes ensures compliance with the interests of the state and subsoil users.

How to cite: Bragin V.I., Kharitonova M.Y., Matsko N.A. A probabilistic approach to the dynamic cut-off grade assessment // Journal of Mining Institute. 2021. Vol. 251 . p. 617-625. DOI: 10.31897/PMI.2021.5.1
Mining
  • Date submitted
    2021-06-15
  • Date accepted
    2021-08-27
  • Date published
    2021-10-21

Prospects for the use of modern technological solutions in the flat-lying coal seams development, taking into account the danger of the formation of the places of its spontaneous combustion

Article preview

Spontaneous combustion of coal remains an important problem for coal mines, which can lead to an explosion of methane and coal dust. Accidents associated with spontaneous combustion of coal can cause significant economic losses to coal mining companies, as well as entail social damage – injuries and loss of life. Accidents are known at the Kuzbass mines, which occurred as a result of negligent attitude to the danger of spontaneous combustion of coal, the victims of which were dozens of people. The analysis of emergency situations associated with spontaneous combustion of coal shows that the existing wide range of means of preventing endogenous fires does not provide complete safety when working out coal seams prone to spontaneous combustion, therefore, spontaneous combustion places continue to occur in mines. The consequences that may arise as a result of a methane explosion initiated by a self-ignition place indicate the need to improve the used technologies. The purpose of the work is to determine the impact of modern technological solutions used in functioning mines during underground mining of flat-lying coal seams prone to spontaneous combustion, and to develop new solutions that reduce endogenous fire hazard. Conclusions on the influence of leaving coal pillars in the developed space, isolated air removal from the stoping face through the developed space, the length of the stoping face and the excavation pillar, and other factors on the danger of the formation of spontaneous combustion places are presented. Conclusions about the possibility of using modern technological solutions in future are also drawn.

How to cite: Zubov V.P., Golubev D.D. Prospects for the use of modern technological solutions in the flat-lying coal seams development, taking into account the danger of the formation of the places of its spontaneous combustion // Journal of Mining Institute. 2021. Vol. 250 . p. 534-541. DOI: 10.31897/PMI.2021.4.6
Mining
  • Date submitted
    2020-06-02
  • Date accepted
    2021-05-21
  • Date published
    2021-09-20

Analysis of technological schemes for creating a geodetic control at the industrial site

Article preview

The article highlights the issues of creating with the necessary accuracy a planned control on the industrial site of the engineering structures under construction using satellite technologies and total stations. Depending on the design features of the engineering structures under construction, as well as the technological scheme for the installation of building constructions and industrial equipment, various schemes for creating such control are considered, based on the application of the inverse linear-angular notch. Errors in the source data are one of the main errors that affect the accuracy of geodetic constructions, including the solution of the inverse linear-angular notch. When creating a geodetic network in several stages, the errors of the initial data of the first stage affect the values of the root-mean-square errors (RMS) of determining the position of the second stage points, the errors of which affect the value of the RMS of the position of the third stage points, etc. The reason for their occurrence is the errors of geodetic measurements that occur at each stage of control creating, as well as the stability violation of the points during the production of excavation, construction and installation works. When determining the coordinates of a separate project point at the stage of its removal in-situ by a total station, the entire network is not equalized in the vast majority of cases, and the coordinates of the starting points to which the total station is oriented are considered error-free. As a result, the RMS determination of the points coordinates of the control network or the removal of the design points of the elements of building structures and equipment will also be considered satisfying the requirements, i.e. the measurement accuracy will be artificially overestimated and will not correspond to the actual one obtained. This is due to the fact that the accumulation of errors in the initial data is not taken into account when the number of steps (stages) of control creating increases. The purpose of this work is to analyze the influence of measurement errors and initial data when creating a geodetic control on an industrial site by several stages of its construction based on inverse linear-angular notches and a priori estimation of the accuracy of the determined points position.

How to cite: Ustavich G.A., Nevolin A.G., Padve V.A., Salnikov V.G., Nikonov A.V. Analysis of technological schemes for creating a geodetic control at the industrial site // Journal of Mining Institute. 2021. Vol. 249 . p. 366-376. DOI: 10.31897/PMI.2021.3.5
Oil and gas
  • Date submitted
    2020-05-13
  • Date accepted
    2020-11-12
  • Date published
    2020-12-29

Improving the efficiency of terrigenous oil-saturated reservoir development by the system of oriented selective slotted channels

Article preview

A comparative assessment of variation in the flow rate of oil production wells was performed taking into account increasing of perforated area of the productive part of the rocks, as well as recover of reservoir rocks permeability due to their unloading by creating slotted channels with the method of oriented slotted hydro-sandblast perforation. Different orientation directions and slotting intervals were analyzed, taking into account water encroachment of individual interlayers and azimuth direction of the majority of remaining reserves in separate blocks of the examined formation. In order to estimate development efficiency of terrigenous oil-saturated porous-type reservoirs by means of oriented slotted hydro-sandblast perforation, calculations were performed on a full-scale geological and hydrodynamic model of an oil field in the Perm Region. The object of modeling was a Visean terrigenous productive forma tion. The modeling of implementing oriented slotted hydro-sandblast perforation was carried out on a 3D filtration model for fourteen marginal wells, located in the zone with excessive density of remaining recoverable reserves and he terogeneous reserve recovery along the section. An optimal layout of slotted channels along the depth of the productive part of the well section was developed. Selective formation of 24 slotted channels was carried out con sidering the intervals of increased oil saturation. Comparative analysis of estimated flow rate of the wells was per formed for cumulative perforation of the examined productive formation and the developed method of slotted perforation. As a result of modeling, an increase in the oil average flow rate of 2.25 t/day was obtained. With oriented slotted hydro-sandblast perforation, incremental cumulative production for two years of prediction calculations per one well reached 0.5 thousand t.

How to cite: CHERNYSHOV S.E., Repina V.A., Krysin N.I., Macdonald D.I.M. Improving the efficiency of terrigenous oil-saturated reservoir development by the system of oriented selective slotted channels // Journal of Mining Institute. 2020. Vol. 246 . p. 660-666. DOI: 10.31897/PMI.2020.6.8
Mining
  • Date submitted
    2020-05-12
  • Date accepted
    2020-09-22
  • Date published
    2020-11-24

Design features of coal mines ventilation using a room-and-pillar development system

Article preview

The safety of mining operations in coal mines for aerological factors depends on the quality of accepted and implemented ventilation design solutions. The current “Design Manual of coal mine ventilation” do not take into account the features of room-and-pillar development systems used in Russia. This increases the risk of explosions, fires, and gassing. The detailed study of foreign experience in designing ventilation for the considered development systems e of coal deposits allowed to formulate recommendations on the ventilation scheme organization for coal mines using a room-and-pillar development system and the procedure for ventilation during multi-entry gateroad development. Observations have shown that the use of the existing Russian procedure for airing mining sites with a room-and-pillar development system complicates the emergency rescue operations conduct. Low speeds and multidirectional air movement, difficult heat outflow, and the abandonment of coal pillars increase the risk of occurrence and late detection of endogenous fire. The results of numerical modeling have shown that the installation (parallel to the drifts) of ventilation structures in inter-chamber pillars will increase the reliability of ventilation by transferring the ventilation scheme from a complex diagonal to a complex parallel. It will also reduce the amount of air required for the mine site and the total aerodynamic drag. The research made it possible to formulate requirements for the design procedure for coal mines ventilation using a room-and-pillar development system, which consist in the order of working out blocks in the panel, and also the additional use of ventilation structures (light brattice clothes or blowing line brattice).

How to cite: Kobylkin S.S., Kharisov A.R. Design features of coal mines ventilation using a room-and-pillar development system // Journal of Mining Institute. 2020. Vol. 245 . p. 531-538. DOI: 10.31897/PMI.2020.5.4
Oil and gas
  • Date submitted
    2020-05-24
  • Date accepted
    2020-05-29
  • Date published
    2020-06-30

Features of permeability anisotropy accounting in the hydrodynamic model

Article preview

Important step in the construction of a geological and hydrodynamic model is to set the correct properties of the formations and further adapt the model to the historical development data. Main source of information on the geological properties of reservoirs is well logging data. Paper describes the application of the method for post-interpretation processing of logging data, with the help of which the lateral anisotropy value of the field site is found. Brief discussion on the algorithm for adapting the hydrodynamic model to the parameters of the formation using one reference well is given. Feature of the logging data application to study the phenomenon of permeability anisotropy is that this type of research is widespread, has sufficient information content, and the geophysical system itself does not require the inclusion of specialized instruments. Based on geophysical study, a volumetric model of the properties for oil and gas bearing formation is constructed, from which the permeability distribution is used, whose gradient allows establishing the directions of improved and deteriorated filtration properties. As a result, during adaption of the model, it was possible to achieve a difference in reserves between the geological and hydrodynamic models of 2.4 %, which is an acceptable deviation for further calculations. It was found that the direction of improved filtration properties has a northeastern direction at an angle of 35°, and the value of lateral anisotropy is 2.2. Obtained results of lateral anisotropy, taking into account the data on values of vertical anisotropy, are included in the field model, where it is planned to further study the effect of permeability anisotropy on formation productivity.

How to cite: Yermekov R.I., Merkulov V.P., Chernova O.S., Korovin M.O. Features of permeability anisotropy accounting in the hydrodynamic model // Journal of Mining Institute. 2020. Vol. 243 . p. 299-304. DOI: 10.31897/PMI.2020.0.299
Electromechanics and mechanical engineering
  • Date submitted
    2020-06-22
  • Date accepted
    2020-07-24
  • Date published
    2020-06-30

Methods for assessing the technical compatibility of heterogeneous elements within a technical system

Article preview

The article provides methods for assessing the compatibility of elements in the design of complex technical systems. The compatibility of the elements is considered as the main indicator that determines the quality of systems including heterogeneous elements. The presented methods make it possible at the design stage to choose a technical solution that is most suitable for the project objectives, taking into account the operating conditions of the system. The methods make it possible to evaluate compatibility by a single and complex indicator. The choice of indicator depends on the purpose of the assessment. An example of methods implementation in the design of systems including an electric drive and pipeline shutoff valves is considered. It has been experimentally proved that in systems with low values ​​of the compatibility level, the actual power characteristics exceed the required values, which leads to additional voltages in the system elements and their breakdowns. The results of the assessment of typical systems allowed to identify the shortcomings of existing structures and propose alternative solutions to problems. The compatibility of elements within the framework of a technical system makes it possible to increase the functional efficiency of systems with minimum weight and size and power characteristics, to optimize the price-quality ratio, and to increase the competitiveness of the final product.

How to cite: Vasin S.A., Vasilev A.S., Plahotnikova E.V. Methods for assessing the technical compatibility of heterogeneous elements within a technical system // Journal of Mining Institute. 2020. Vol. 243 . p. 329-336. DOI: 10.31897/PMI.2020.3.329
Oil and gas
  • Date submitted
    2019-05-14
  • Date accepted
    2019-07-05
  • Date published
    2020-04-24

Development of spacer fluids and cement slurries compositions for lining of wells at high temperatures

Article preview

Article is devoted to creation of new compositions of process solutions for lining of directional wells at high temperatures. Developed compositions provide high durability characteristics of cement stone. It is shown that with an increase in packing density of cementing slurry components durability characteristics increase and porosity and permeability of cement stone decrease, whereas an increase in temperature and pressure leads to a significant increase in compressive and bending durability, which is associated with presence of quartz in them. It has been established that introduction of special structure-forming additives to the composition of developed cementing solutions allows formation of sedimentation-resistant cement systems that can provide an increase in durability characteristics of cement stone and, in general, quality lining of directional wells. Study of rheological properties of developed cementing compositions showed that the systems have high yield strength at increased temperatures and pressures. Developed compositions of water-based spacer fluids increase the cleansing degree for both casing and rocks surfaces from mud and clay cake residues, which improves the cementing quality of oil and gas wells. Mechanism for increasing the washing ability of spacer fluids and durability characteristics of cement stone, depending on composition and properties of their constituent components, is disclosed.

How to cite: Tabatabaee Moradi S.S., Nikolaev N.I., Nikolaeva T.N. Development of spacer fluids and cement slurries compositions for lining of wells at high temperatures // Journal of Mining Institute. 2020. Vol. 242 . p. 174-178. DOI: 10.31897/PMI.2020.2.174
Mining
  • Date submitted
    2019-03-17
  • Date accepted
    2019-05-13
  • Date published
    2019-08-23

Manifestations of Acoustic Emission in Frozen Soils with Simultaneous Influence of Variable Mechanical and Thermal Effects on Them

Article preview

The subject of the research is to establish the fundamental laws of acoustic emission in frozen soils, which allow to create ways to control (monitor) their stability under the influence of variable temperature fields and quasistatic mechanical stress from engineering objects located on these grounds for various purposes. The applied importance of such methods is to increase the speed and reduce the complexity of engineering geological surveys in the northern regions of Russia, carried out with the aim of predicting the loss of stability of the bases of buildings and structures to ensure their safe operation. The study was performed on the original instrumental complex. Its description and characteristics are given. With the use of this complex, thermoacoustic emission effects arising from the repeated alternation of freezing and thawing cycles of the soil during the development of its deformed state, starting from the normal compaction phase and up to the final stage of destruction (the bulging phase), have been studied. It is shown that on the basis of such informative parameters as thermally stimulated activity and duration of acoustic emission pulses, an indicator can be obtained that quantitatively characterizes the stages of the stress-strain state of soils. An experimental dependence of the field of values of this indicator as a function of the mechanical stress and the fractional composition of the test soil is given. The qualitative convergence of this dependence with the classical soil deformation diagram obtained by N.M.Hersevanov is shown, where the stages of compaction, loss of stability (shifts) and destruction are highlighted. Possible physical mechanisms and features of the formation of an acoustic emission response at each of these stages are considered and substantiated. It is noted that the approaches to receiving, processing and interpreting acoustic emission measurement information, which are grounded within the framework of the study, allow to control and monitoring of the carrying capacity and stress-strain state of soils directly in the field.

How to cite: Novikov E.A., Shkuratnik V.I., Zaytsev M.G. Manifestations of Acoustic Emission in Frozen Soils with Simultaneous Influence of Variable Mechanical and Thermal Effects on Them // Journal of Mining Institute. 2019. Vol. 238 . p. 383-391. DOI: 10.31897/PMI.2019.4.383
Metallurgy and concentration
  • Date submitted
    2019-01-16
  • Date accepted
    2019-03-07
  • Date published
    2019-06-25

Sintered sorbent utilization for H2S removal from industrial flue gas in the process of smelter slag granulation

Article preview

Authors suggest removing hydrogen sulfide from the hot industrial gas at temperatures 200-300 °C and its subsequent interaction with Fe 2 O 3 . For this purpose the following sorbents have been proposed: a mixture of iron oxide and fly ash; iron oxide and pumice; different samples of red mud (bauxite treatment residues containing iron oxide). To prevent dusting and loss of absorbing capacity, the sorbents were shaped into porous granules with other metallic oxides. Materials utilized in the study were obtained the following way: mixing of Fe 2 O 3 with fly ash; sintering of the mixture with red mud. The blend contains aluminum oxide and silica, which can act as matrix shapers, alkali oxides and fluxing agents that reduce the temperature during metal sintering. After the samples had been saturated with sulfur, they were positioned in a venting reservoir, where under the temperature 600-700 °C desorption to the initial state occurred by means of passing an air flow through the sorbent layer. In the process of this operation, sulfur dioxide was released and reactive metal oxides re-emerged. Desorption also generated a small amount of elemental sulfur and sulfuric acid. Absorbing capacity was assessed at higher temperatures, efficiency of H 2 S removal reached 95-99.9 %. Proposed technology of air cleaning is recommended to use in metallurgic processes with elevated atmospheric pollution, e.g. granulation of melted blast-furnace slag.

How to cite: Lebedev A.B., Utkov V.A., Khalifa A.A. Sintered sorbent utilization for H2S removal from industrial flue gas in the process of smelter slag granulation // Journal of Mining Institute. 2019. Vol. 237 . p. 292-297. DOI: 10.31897/PMI.2019.3.292
Metallurgy and concentration
  • Date submitted
    2018-09-02
  • Date accepted
    2018-10-28
  • Date published
    2019-02-22

Factors affecting bacterial and chemical processes of sulphide ores processing

Article preview

Extraction of valuable components from sulphide ores using microorganisms is a recognized biotechnological method, combining several advantages over traditional methods of mineral processing. This paper presents the main factors affecting the bacterial-chemical leaching and methods of leaching with the participation of microorganisms. Some physical-chemical (temperature, pH, oxygen, carbon dioxide, nutrients, metals and other chemical elements) and microbial (cell count and microflora activity) properties are given, either directly or indirectly (suppressing or contributing to the growth and oxidative capacity of microorganisms) affecting the kinetics of the process. The paper discusses the characteristics of the mineral substrate, including galvanic interaction of sulfide minerals and the formation of passivating layers on the surface of the ore during oxidation, emphasizing the importance of the electrochemical interaction of the components of the leaching system. Bioleaching is a complex process, which is a combination of mainly chemical reactions mediated by the microbial component, therefore, to improve the kinetics, it is necessary to consider, monitor and regulate the listed range of factors.

How to cite: Khainasova T.S. Factors affecting bacterial and chemical processes of sulphide ores processing // Journal of Mining Institute. 2019. Vol. 235 . p. 47-54. DOI: 10.31897/PMI.2019.1.47
Metallurgy and concentration
  • Date submitted
    2018-09-10
  • Date accepted
    2018-11-06
  • Date published
    2019-02-22

Comparative analysis of zincand tin oxidation with acids at room temperatures

Article preview

The paper analyses the parameters of deep oxidation of zinc and tin by copper (II) compounds and molecular iodine in the presence of molecular oxygen and hydrogen peroxide, as second oxidizers working synchronously with them in various media (aqueous, aqueous-organic and organic) with the participation of mineral and carboxylic acids close to room temperature. The contribution of the reactivity of the metal to its rate of consumption, especially the average, is often much less than the contribution associated with the release characteristics of the working surface, determined by the rates of accumulation of surface deposits of metal oxidation products, their strength and adhesion characteristics their destruction and shifting into the bulk phase.

How to cite: Pozhidaeva S.D., Ageeva L.S., Ivanov A.M. Comparative analysis of zincand tin oxidation with acids at room temperatures // Journal of Mining Institute. 2019. Vol. 235 . p. 38-46. DOI: 10.31897/PMI.2019.1.38
Mining
  • Date submitted
    2017-09-20
  • Date accepted
    2017-10-29
  • Date published
    2018-02-22

Substantiation of strength of the filling mass by taking a blast effect into account for the room-and-pillar methods

Article preview

The development of the uranium ore bodies at the ore mines of PJSC «Priargunsky Industrial Mining and Chemical Union» (PJSC «PIMCU») by room-and-pillar method as high as a pillar between the levels (60 m) without fill, as a rule, leads to the fall of the adjoining rock, to the strong contamination of the ore and to the high yield of the oversize pieces of the barren rock. A longstanding industrial and theoretical research shows that the sizes of the self-sustaining rock escarpments at the ore mines of PJSC «PIMCU» in the solid mass of trachydacites, conglomerates, sandstones, felsites are equal to 20-40 m. Moreover, the sizes of the self-sustaining rock escarpments depend to a great extent on the intensity of fracturing of the adjoining rocks. The stable size of the escarpment does not exceed 5-10 m for the rocks with the size of a jointing up to 0.05 m. Consequently, timely performance of the filling operations of the worked-out space of the chamber is important. However, the question then arises: which characteristic strength should the filling mass have? The calculations of the characteristics of the filling mass in compliance with the reference guide «Shaft filling operations» show underestimated values of the characteristic compressive strength of the fill (1.4 MPa) for the room-and-pillar method, which leads to the increase of the ore contamination by the fill and provokes the additional costs for refilling of the volumes of the rock fall. On the basis of the Russian experience of using of the consolidated fill for the development of the ore bodies of 15 m thickness by chamber method the strength of the fill is taken as 3-5 MPa under the resultant value of the static stresses without taking into account the character of the dynamic loading stresses induced by the sequence blasthole ring initiating in a chamber. Overestimating the characteristic strength of the filling mass results in the high consumption of the cementing materials. On the basis of the theoretical research the authors suggested the theoretical dependence of calculation of the characteristic strength of the filling material with respect to compressive stresses of the fill induced by the blasting operations. The process of designing of the filling mass with the zones of diverse strength for the room-and-pillar extraction with the consolidated rock fill is proven to be economically reasonable. The bottom zone of the solid mass should have high strength (3-4 MPa), and the strength of the upper zone should be up to 2-2.5 MPa.

How to cite: Voronov E.T., Tyupin V.N. Substantiation of strength of the filling mass by taking a blast effect into account for the room-and-pillar methods // Journal of Mining Institute. 2018. Vol. 229 . p. 22-26. DOI: 10.25515/PMI.2018.1.22
Mining
  • Date submitted
    2016-09-04
  • Date accepted
    2016-11-14
  • Date published
    2017-02-22

Methodology of reducing rock bump hazard during room and rillar mining of North Ural deep bauxite deposits

Article preview

The article describes practical experience of using room and pillar mining (RAPM) under conditions of deep horizons and dynamic overburden pressure. It was identified that methods of rock pressure control efficient at high horizons do not meet safety requirements when working at existing depths, that is explained by changes in geodynamic processes during mining. With deeper depth, the geodynamic processes become more intensive and number of pillar and roof failures increase. When working at 800 m the breakage of mine structures became massive and unpredictable, which paused a question of development and implementation of tools for compliance assessment of used elements of RAPM and mining, geological, technical and geodynamic conditions of North Ural bauxite deposits and further development of guidelines for safe mining under conditions of deep horizons and dynamic rock pressure. It describes reasons of mine structure failures in workings depending on natural and man-caused factors, determines possible hazards and objects of geomechanic support. It also includes compliance assessment of tools used for calculations of RAPM structures, forecast and measures for rock tectonic bursts at mines of OAO “Sevuralboksitruda” (SUBR). It describes modernization and development of new geomechanic support of RAPM considering natural and technogenic hazards. The article presents results of experimental testing of new parameters of RAPM construction elements of SUBR mines. It has data on industrial implementation of developed regulatory and guideline documents at these mines for identification of valid parameters of RAPM elements at deep depths.

How to cite: Sidorov D.V. Methodology of reducing rock bump hazard during room and rillar mining of North Ural deep bauxite deposits // Journal of Mining Institute. 2017. Vol. 223 . p. 58-69. DOI: 10.18454/PMI.2017.1.58
Geo-nanomaterials
  • Date submitted
    2015-08-13
  • Date accepted
    2015-10-29
  • Date published
    2016-04-22

Multicriteria estimation of bearing capacity of geomaterials

Article preview

In the article the problem of an estimation of bearing capacity of geomaterials as a deform-able solid is considered in the current configuration, which may be as the reference (undeformed) or the actual (deformed). We propose an original variational approach to the problem for stresses in selected subdomains, in which, depending on different engineering considerations, average in-tegral values of different component of stresses are estimated and from their aggregate the bearing capacity of the current configuration of the solid is estimated regarding to given external influ-ences. In each of the selected subdomain the weakest stress field is obtained which is globally bal-anced with external influences. For example, the assessment of the average integral hydrostatic pressure is needed for study of bearing capacity of geomaterials.

How to cite: Brigadnov I.A. Multicriteria estimation of bearing capacity of geomaterials // Journal of Mining Institute. 2016. Vol. 218 . p. 289-295.
Mining
  • Date submitted
    2014-12-30
  • Date accepted
    2015-02-03
  • Date published
    2015-12-25

Open mining technique for unconventional mineral deposits

Article preview

Nowadays the majority of deposits are successfully exploiting by mining enterprises with the help of traditional excavation and loading equipment. Typically, metals, construction materials, etc. are mined and extracted on these deposits, but modern society is progressing and producing new requirements to metals properties for creating a new type of equipment. The metals with new properties are located in unconventional areas: either in technogenic deposits (overburden dumps, tailings, etc.) or in hard-to-get natural formations. Technogenic mines, being a tailing of Kachkanarsky mining and processing plant, are referred to such unique deposits, which have expensive metals (scandium, gallium, strontium, titanium), as well as the natural deposit – rhenium deposit, located in the crater of an active volcano. Potentialities of open mining in the largest rhenium deposit with complex environmental occurrence have been analyzed in the paper. Temperature measurement results of adjacent strata and a temperature scheme of the host rocks on a separate site and the entire field have been presented. An open mining technique for a primary mining area as well as perspective methods of rock preparation for excavation, applicable to this particular deposit, has been considered.

How to cite: Kholodnyakov G.A., Argimbaev K.R. Open mining technique for unconventional mineral deposits // Journal of Mining Institute. 2015. Vol. 216 . p. 82-88.
Geoeconomics and Management
  • Date submitted
    2014-11-22
  • Date accepted
    2015-01-01
  • Date published
    2015-10-26

Theoretical and methodological bases of forming a program management system for integrated development of a region

Article preview

This article deals with theoretical and methodological bases of forming a program manage-ment system for integrated development of a region. The idea of a program-based management system based on a system of socio-economic transformation is presented. The given bases include monitoring emerging trends in the program management for integrated development of a region of the Russian Federation on basic parameters and involve control of the management process. The concept of forming the mechanism of program management as an integrated system is suggested.

How to cite: Fedoseev S.V., Chzhan S. Theoretical and methodological bases of forming a program management system for integrated development of a region // Journal of Mining Institute. 2015. Vol. 215 . p. 150-159.