Submit an Article
Become a reviewer
Anatolii G. Nevolin
Anatolii G. Nevolin
Associate Professor, Ph.D.
Siberian State University of Geosystems and Technologies
Associate Professor, Ph.D.
Siberian State University of Geosystems and Technologies
Novosibirsk
Russia

Articles

Mining
  • Date submitted
    2020-06-02
  • Date accepted
    2021-05-21
  • Date published
    2021-09-20

Analysis of technological schemes for creating a geodetic control at the industrial site

Article preview

The article highlights the issues of creating with the necessary accuracy a planned control on the industrial site of the engineering structures under construction using satellite technologies and total stations. Depending on the design features of the engineering structures under construction, as well as the technological scheme for the installation of building constructions and industrial equipment, various schemes for creating such control are considered, based on the application of the inverse linear-angular notch. Errors in the source data are one of the main errors that affect the accuracy of geodetic constructions, including the solution of the inverse linear-angular notch. When creating a geodetic network in several stages, the errors of the initial data of the first stage affect the values of the root-mean-square errors (RMS) of determining the position of the second stage points, the errors of which affect the value of the RMS of the position of the third stage points, etc. The reason for their occurrence is the errors of geodetic measurements that occur at each stage of control creating, as well as the stability violation of the points during the production of excavation, construction and installation works. When determining the coordinates of a separate project point at the stage of its removal in-situ by a total station, the entire network is not equalized in the vast majority of cases, and the coordinates of the starting points to which the total station is oriented are considered error-free. As a result, the RMS determination of the points coordinates of the control network or the removal of the design points of the elements of building structures and equipment will also be considered satisfying the requirements, i.e. the measurement accuracy will be artificially overestimated and will not correspond to the actual one obtained. This is due to the fact that the accumulation of errors in the initial data is not taken into account when the number of steps (stages) of control creating increases. The purpose of this work is to analyze the influence of measurement errors and initial data when creating a geodetic control on an industrial site by several stages of its construction based on inverse linear-angular notches and a priori estimation of the accuracy of the determined points position.

How to cite: Ustavich G.A., Nevolin A.G., Padve V.A., Salnikov V.G., Nikonov A.V. Analysis of technological schemes for creating a geodetic control at the industrial site // Journal of Mining Institute. 2021. Vol. 249. p. 366-376. DOI: 10.31897/PMI.2021.3.5