Submit an Article
Become a reviewer

Search articles for by keywords:
norm of reserve

Geotechnical Engineering and Engineering Geology
  • Date submitted
    2023-09-05
  • Date accepted
    2024-11-07
  • Date published
    2025-02-25

Investigation of the accuracy of constructing digital elevation models of technogenic massifs based on satellite coordinate determinations

Article preview

At all stages of the life cycle of buildings and structures, geodetic support is provided by electronic measuring instruments – a laser scanning system, unmanned aerial vehicles, and satellite equipment. In this context, a set of geospatial data is obtained that can be presented as a digital model. The relevance of this work is practical recommendations for constructing a local quasigeoid model and a digital elevation model (DEM) of a certain accuracy. A local quasigeoid model and a DEM were selected as the study objects. It is noted that a DEM is often produced for vast areas, and, therefore, it is necessary to build a local quasigeoid model for such models. The task of assessing the accuracy of constructing such models is considered; its solution will allow obtaining a better approximation to real data on preassigned sets of field materials. A general algorithm for creating both DEM and local quasigeoid models in the Golden Software Surfer is presented. The constructions were accomplished using spatial interpolation methods. When building a local quasigeoid model for an area project, the following methods were used: triangulation with linear interpolation (the least value of the root mean square error (RMSE) of interpolation was 0.003 m) and kriging (0.003 m). The least RMSE value for determining the heights by control points for an area project was obtained using the natural neighbour (0.004 m) and kriging (0.004 m) methods. To construct a local quasigeoid model for a linear project, the following methods were applied: kriging (0.006 m) and triangulation with linear interpolation (0.006 m). Construction of the digital elevation model resulted in the least aggregate value of the estimated parameters: on a flat plot of the earth’s surface – the natural neighbour method, for a mountainous plot with anthropogenic topography – the quadric kriging method, for a mountainous plot – quadric kriging.

How to cite: Bryn M.Y., Mustafin M.G., Bashirova D.R., Vasilev B.Y. Investigation of the accuracy of constructing digital elevation models of technogenic massifs based on satellite coordinate determinations // Journal of Mining Institute. 2025. Vol. 271 . p. 95-107. EDN ZDVPPC
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2022-10-04
  • Date accepted
    2024-03-05
  • Date published
    2024-08-26

Localization and involvement in development of residual recoverable reserves of a multilayer oil field

Article preview

During waterflooding of a multilayer oil field there is a constant deterioration of the structure and composition of residual reserves due to geological and technological reasons. The largest share of residual reserves is localized in pillars, which arise from uneven development of the production facility and are undrained or poorly drained zones. The results of a quantitative assessment of the distribution of residual oil reserves in the Middle and Upper Devonian deposits of the Romashkinskoe oil field of the Republic of Tatarstan are presented. A retrospective method is proposed to identify reserves by analyzing and summarizing historical exploration data and the long history of reservoir development, and a calculation algorithm is proposed to quantify them. It has been established that residual oil reserves are localized in rows of dividing and injection wells, as well as in the central rows of producing wells in a three-line drive, in abandoned and piezometric wells, in the areas adjacent to the zones of reservoir confluence, pinch-out, oil-bearing contours, distribution of reservoirs with deteriorated porosity and permeability properties. Depending on geological conditions, algorithms for selecting geological and technical measures to include localized reserves in development and forecasting production profiles were proposed. According to the proposed method, residual recoverable reserves were identified and a number of wells were recommended for experimental works on their additional recovery: in well 16 (hereinafter in the text, conventional well numbers are used) after isolation of overlying high-water-cut formations, the additional perforation was carried out and oil flow was obtained. Additional perforation in well 6 resulted in oil recovery during development as well. Thus, the developed approaches to identifying residual recoverable reserves and patterns of their spatial distribution can be recommended in other multilayer oil fields with a long history of development.

How to cite: Burkhanov R.N., Lutfullin A.A., Raupov I.R., Maksyutin A.V., Valiullin I.V., Farrakhov I.M., Shvydenko M.V. Localization and involvement in development of residual recoverable reserves of a multilayer oil field // Journal of Mining Institute. 2024. Vol. 268 . p. 599-612. EDN DKXZSP
Energy industry
  • Date submitted
    2024-06-12
  • Date accepted
    2024-07-18
  • Date published
    2024-07-26

Development of parameters for an industry-specific methodology for calculating the electric energy storage system for gas industry facilities

Article preview

The issue of determining the main parameters of electric energy storage systems – power and energy intensity – is being considered, the determination of which is a fundamentally important task when introducing such devices into the power supply systems of enterprises for both technical (technological) and economic reasons. The work analyzes problems that can be solved by installing electricity storage systems at gas industry facilities. An industry-wide methodology has been developed for calculating the parameters of an electricity storage system based on traditional methods and methods aimed at minimizing the standardized cost of electricity with adaptation to the conditions of the gas industry. A distinctive feature of the presented methodology is the ability to determine the power and energy intensity of electricity storage systems when performing several functions. The methodology was tested at a typical gas industry facility – the Yarynskaya compressor station of OOO Gazprom Transgaz Ukhta, a characteristic feature of which is an autonomous power supply system. An example is given of calculating the electricity storage normalized cost using an improved LCOS indicator, which takes into account the effect of changing the fill factor of the electrical load schedule on the amount of gas consumption by a power plant for its own needs. To confirm the economic efficiency of introducing electricity storage systems calculated using the above methodology, calculations of the integral effect, net present value and efficiency index are presented.

How to cite: Tokarev I.S. Development of parameters for an industry-specific methodology for calculating the electric energy storage system for gas industry facilities // Journal of Mining Institute. 2024. p. EDN UIZSOQ
Geology
  • Date submitted
    2023-02-10
  • Date accepted
    2023-09-20
  • Date published
    2024-04-25

Depth distribution of radiation defects in irradiated diamonds by confocal Raman spectroscopy

Article preview

Five colored diamonds were investigated. According to the results of the study by FTIR, UV-Vis-NIR and Photoluminescence spectroscopy, they are natural type Ia diamonds. The depth distribution of the color intensity was carried out by measuring the intensity of the PL peak at 741 nm (GR1 center) upon excitation by a laser with a wavelength of 633 nm of Raman Confocal microscope. To minimise the perturbation due to geometrical effects, defect distribution profiles were normalised with respect to diamond Raman peak intensity (691 nm) point by point. For two diamonds, the intensity of the GR1 peak (741 nm) sharply decreased to a depth of 10 µm, and then became equal to the background level, which is typical for irradiation with alpha particles from natural sources like uranium. In other diamonds, the profiles vary slightly with depth, and the color intensity is close to uniform, which is for irradiation with accelerated electrons or neutrons. The source of radiation has not been determined. However, long duration radioactivity measurements of the diamonds suggested that neutrons were not used for colour centers production in the diamonds studied.

How to cite: Ardalkar R.M., Salunkhe Y.D., Gaonkar M.P., Mane S.N., Ghaisas O.A., Desai S.N., Reddy A.V.R. Depth distribution of radiation defects in irradiated diamonds by confocal Raman spectroscopy // Journal of Mining Institute. 2024. Vol. 266 . p. 179-187. EDN XGGRVF
Economic Geology
  • Date submitted
    2022-03-09
  • Date accepted
    2022-11-17
  • Date published
    2023-02-27

Development of methodology for economic evaluation of land plots for the extraction and processing of solid minerals

Article preview

The Russian economy has a pronounced resource specialization; in many regions, subsoil use is a backbone or one of the main areas of the economy. In these conditions, the improvement of the methodology for the economic evaluation of lands on which mining enterprises are located is of particular relevance. On the basis of the existing experience in assessing industrial land, the authors present a developed methodology for determining the cadastral value of land plots where mining enterprises are located, taking into account their industry characteristics and the specifics of production and commercial activities. At the same time, cadastral valuation is considered as a specific form of economic valuation. Particular emphasis is placed on the importance of taking into account the cost factors that have the greatest impact on the formation of the cost of land for the extraction and processing of solid minerals, and the method of assessment depending on the characteristics of the object. To carry out theoretical research, the methods of analysis and synthesis of legal and scientific and technical literature in the field of cadastral and market valuation of land were used in the work. The practical part is based on the application of expert methods, including the method of analysis of hierarchies, system and logical analysis. The method of M.A.Svitelskaya was chosen as the basis, which presents a combination of modified methods of statistical (regression) modeling and modeling based on specific indicators of cadastral value. The use of this technique in economic practice contributes to increasing the efficiency of cadastral valuation and the objectivity of its results.

How to cite: Bykowa E.N., Khaykin М.М., Shabaeva Y.I., Beloborodova М.D. Development of methodology for economic evaluation of land plots for the extraction and processing of solid minerals // Journal of Mining Institute. 2023. Vol. 259 . p. 52-67. DOI: 10.31897/PMI.2023.6
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2022-05-23
  • Date accepted
    2022-07-21
  • Date published
    2023-02-27

Alluvial tin mining by spray-suction borehole method: a case study on remaining alluvial tin reserves in Bangka Belitung, Indonesia

Article preview

The area of the Bangka Belitung Islands, which is a potential area for alluvial tin deposits in Indonesia, has been affected by the destruction of tin reserves on the mainland due to rampant artisanal mining, which has left remnants of small-dimensional reserves. The remnants of these reserves can no longer be mined using the hydraulic mining of open pit method due to the small dimensions of the deposits. The hypothesis is that such sedimentary conditions can only be mined by the borehole method. This research aimed to design tools and perform test mining using the borehole method with a spray-suction mechanism. This research produced a novelty, namely, a method and parameters for alluvial tin deposits mining using borehole mining methods, such as the excavation capacity, excavation radius, mining recovery, and dilution factor. The benefit of this research is expected to provide an opportunity to increase the amount of onshore alluvial tin reserves to support tin production.

How to cite: Ichwan A., Wibowo A.P., Anggayana K., Widodo N.P. Alluvial tin mining by spray-suction borehole method: a case study on remaining alluvial tin reserves in Bangka Belitung, Indonesia // Journal of Mining Institute. 2023. Vol. 259 . p. 3-12. DOI: 10.31897/PMI.2022.70
Modern Trends in Hydrocarbon Resources Development
  • Date submitted
    2022-04-12
  • Date accepted
    2022-11-17
  • Date published
    2022-12-29

Development of technological solutions for reliable killing of wells by temporarily blocking a productive formation under ALRP conditions (on the example of the Cenomanian gas deposits)

Article preview

Modern field operation conditions are characterized by a decline in gas production due to the depletion of its reserves, a decrease in reservoir pressure, an increase in water cut, as well as due to the depreciation of the operating well stock. These problems are especially specific at the late stage of development of the Cenomanian deposits of Western Siberia fields, where the anomaly factor below 0.2 prevails, while gas-bearing formations are represented mainly by complex reservoirs with high-permeability areas. When killing such wells, the classical reduction of overbalance by reducing the density of the process fluid does not provide the necessary efficiency, which requires the search for new technical and technological solutions. In order to prevent the destruction of the reservoir and preserve its reservoir properties during repair work in wells with abnormally low reservoir pressure, AO “SevKavNIPIgaz” developed compositions of special process fluids. A quantitative description of the process of blocking the bottomhole formation zone is proposed by means of mathematical modeling of injection of a gel-forming solution into a productive horizon. The well killing technology includes three main stages of work: leveling the injectivity profile of the productive strata using three-phase foam, pumping the blocking composition and its displacement with the creation of a calculated repression. Solutions obtained on the basis of a mathematical model allow optimizing technological parameters to minimize negative consequences in the well killing process.

How to cite: Gasumov R.А., Minchenko Y.S., Gasumov E.R. Development of technological solutions for reliable killing of wells by temporarily blocking a productive formation under ALRP conditions (on the example of the Cenomanian gas deposits) // Journal of Mining Institute. 2022. Vol. 258 . p. 895-905. DOI: 10.31897/PMI.2022.99
Energy industry
  • Date submitted
    2021-03-11
  • Date accepted
    2021-04-12
  • Date published
    2022-04-29

Operation mode selection algorithm development of a wind-diesel power plant supply complex

Article preview

The power supply system is affected by external disturbances, so it should be stable and operate normally in compliance with power quality standards. The power supply system goes into abnormal modes operation when, after a short-term failure or disturbance, it does not restore normal mode. The electrical complex, which includes a wind power plant, as well as a battery and a diesel generator connected in parallel, is able to provide reliable power supply to consumers which meets the power quality indicators. The article develops an algorithm that is implemented by an automatic control system to select the operating mode depending on climatic factors (wind) and the forecast of energy consumption for the day ahead. Forecast data is selected based on the choice of the methods, which will have the smallest forecast error. It is concluded that if the energy consumption forecast data is added to the automatic control system, then it will be possible to increase the efficiency of the power supply complex. In the developed algorithm the verification of normal and abnormal modes of operation is considered based on the stability theory. The criteria for assessing the normal mode of operation are identified, as well as the indicators of the object’s load schedules for assessing the load of power supply sources and the quality standards for power supply to consumers for ranking the load by priority under critical operating conditions and restoring normal operation are considered.

How to cite: Shklyarskiy Y.E., Batueva D.E. Operation mode selection algorithm development of a wind-diesel power plant supply complex // Journal of Mining Institute. 2022. Vol. 253 . p. 115-126. DOI: 10.31897/PMI.2022.7
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2021-07-07
  • Date accepted
    2021-10-18
  • Date published
    2021-12-16

Influence of hydraulic compression on porosity and permeability properties of reservoirs

Article preview

Active development of hard-to-recover oil reserves causes the need for an innovative approach to methods of oil recovery and intensification of its production, based on taking into account the specifics of filtration processes in low-productive reservoirs and complex geological and physical conditions. Pilot works for studying the mechanism of changes in porosity and permeability properties of reservoirs during swabbing of wells are presented. Based on the hydrodynamic investigations performed, the results of the work are analyzed. The method of oil production intensification using hydraulic compression of formation has been developed. It has been shown that when using hydraulic compression technology in the pore space of the formation, the effect of capillary and gravitational forces is strongly reduced. The influence of these forces decreases when significant pressure gradients with changing direction are formed during well swabbing for depression impact on the bottomhole zone of the formation. Hydraulic compression induced an increase in well productivity and flow rate; insights into how how permeability and porosity properties change during well swabbing were clarified. The range of compressive durability (minimum and maximum values) was determined for the Verean deposits of the Melekeskaya Depression and the South Tatar arch. The impact of formation hydraulic compression caused changes in permeability and porosity properties of the reservoir in the bottomhole zone on a qualitative level. Piezo- and hydraulic conductivity increased by 20 %. Experimental work in well 1545 of Keremetyevskoe field showed an increase of piezo- and hydraulic conductivity coefficients, effective formation thickness, change of filtration flows character.

How to cite: Khuzin R.R., Andreev V.E., Mukhametshin V.V., Kuleshova L.S., Dubinskiy G.S., Safiullina А.R. Influence of hydraulic compression on porosity and permeability properties of reservoirs // Journal of Mining Institute. 2021. Vol. 251 . p. 688-697. DOI: 10.31897/PMI.2021.5.8
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2021-02-24
  • Date accepted
    2021-10-18
  • Date published
    2021-12-16

A probabilistic approach to the dynamic cut-off grade assessment

Article preview

Cut-off grade is an important conditioning parameter that determines the quantity and quality of recoverable reserves and development efficiency. Today, Russian mining companies operate with certified quality requirements. By setting permanent quality requirements, the government seeks to prevent depletion of reserves, reduced production during periods of falling prices, and decreased budget revenues, expressing the interests of all members of society. But to what extent do the permanent quality requirements protect the interests of the state? The answer to this question is ambiguous and does not lie on the surface. The State Commission for Reserves and domestic researchers are working to find a rational solution to the problem of quality requirements. One solution is dynamic quality requirements. The effectiveness of their application has been proven for individual mining companies, but it is incorrect to transfer these conclusions to the entire mineral resource base of the country. This article presents a new approach to determining the dynamic cut-off grade, which varies depending on the price of minerals. The dynamic cut-off grade is proposed to be determined based on the indicators of constant requirements to the quality of exploration work, using the maximum allowable costs in the region. The approach allows to calculate the effect of the introduction of dynamic cut-off grade in the practice of subsurface use for the state (in the form of the amount of taxes received) and for subsoil users (in the form of the amount of income). For a group of gold-bearing deposits with open-pit mining method, it was established that the development of reserves using dynamic values of the cut-off grade in periods of price changes ensures compliance with the interests of the state and subsoil users.

How to cite: Bragin V.I., Kharitonova M.Y., Matsko N.A. A probabilistic approach to the dynamic cut-off grade assessment // Journal of Mining Institute. 2021. Vol. 251 . p. 617-625. DOI: 10.31897/PMI.2021.5.1
Oil and gas
  • Date submitted
    2019-05-30
  • Date accepted
    2019-09-03
  • Date published
    2020-02-25

Study on influence of two-phase filtration transformation on formation of zones of undeveloped oil reserves

Article preview

In order to study the process of fluid filtration during flooding of an oil field, article uses Rapoport – Lis model of non-piston oil displacement by water. During plane-radial filtration in a homogeneous formation, radii of disturbance zones are determined with and without taking into account the end effect. Influence of changes in value of capillary pressure gradient on distribution of water saturation coefficient in the non-piston displacement zone for high and low permeability reservoirs is revealed. Application of an element model for a five-point injection and production well placement system showed that, using traditional flooding technology, flat-radial fluid filtration is transformed into rectilinear-parallel. At solving equation of water saturation, Barenblatt method of integral relations was used, which allows determining the transformation time. By solving the saturation equation for rectilinear-parallel filtration, change in the value of water saturation coefficient at bottomhole of production well for an unlimited and closed deposit is determined. It is shown that an increase in water cut coefficient of a production well is possible only for a closed formation. To determine coefficient of water saturation in a closed deposit, a differential equation with variable coefficients is obtained, an iterative solution method is proposed. In the element of the five-point system, oil-saturated zones not covered by development were identified. For channels of low filtration resistance, conditions for their location in horizontal and vertical planes are established. It is shown that, at maintaining formation pressure, there is an isobar line in formation, corresponding to initial formation pressure, location of which determines direction of fluid crossflow rates. Intensity of crossflows affects application efficiency of hydrodynamic, physical and chemical, thermal and other methods of enhanced oil recovery.

How to cite: Grachev S.I., Korotenko V.A., Kushakova N.P. Study on influence of two-phase filtration transformation on formation of zones of undeveloped oil reserves // Journal of Mining Institute. 2020. Vol. 241 . p. 68-82. DOI: 10.31897/PMI.2020.1.68
Oil and gas
  • Date submitted
    2018-11-20
  • Date accepted
    2019-01-14
  • Date published
    2019-04-23

Low-density cement compositions for well cementing under abnormally low reservoir pressure conditions

Article preview

The paper considers variants of lightweight cement compositions with additives of various substances, such as clay components, ash systems, silica additives, kerogen, gilsonite, microspheres, as well as the process of cement slurry aeration. Recommendations on the use of compositions in different conditions are presented. A decrease in the density of the solution is achieved not only due to the low density of the materials used, but also as a result of an increase in the water-cement ratio. In such conditions, it is not possible to ensure the formation of a durable and impermeable cement stone in the well, which creates high quality inter-reservoir insulation. The characteristics of the physical and mechanical properties of existing lightening additives are given, which allows determining the most rational conditions for the use of cement slurries for improvement of the well cementing quality.

How to cite: Nikolaev N.I., Leusheva E.L. Low-density cement compositions for well cementing under abnormally low reservoir pressure conditions // Journal of Mining Institute. 2019. Vol. 236 . p. 194-200. DOI: 10.31897/PMI.2019.2.194
Geoeconomics and Management
  • Date submitted
    2018-05-22
  • Date accepted
    2018-07-04
  • Date published
    2018-10-24

Cost assessment of gold ore deposits adjusted for capital investment

Article preview

The paper focuses on the problems of geologic and economic assessment of mineral deposits. Existing methods have certain advantages and disadvantages, but always rely on unified assessment criteria that fail to take into account specific parameters of each deposit. The author proposes a method of quick and simple cost assessment of gold ore deposits based on ore reserves data. Suggested approach allows to evaluate a true price of gold ore deposits that takes into account field preparation and development costs, as well as to calculate threshold (recommended) amount of investment. Besides that, the method permits to assess the contribution that mineral reserves and resources make to the cumulative market price of the mining company. The method is based on the analysis of empirical data from actual purchases of gold ore (and associated metals) deposits made by Polymetal International PLC. The results of statistical research are incorporated in a formula of threshold deposit price taking into account field preparation and development costs. Comparison between deposit prices obtained from actual purchase deals and forecast results demonstrates high convergence rate (R = 0.97). The greatest error in the forecast results is attributed to insufficient attention to the geographical position of deposits, existence of infrastructure and relevant facilities. The method has been tested on three purchases of gold ore assets made by Polymetal International PLC and demonstrated high convergence with actual deal prices.

How to cite: Zaitsev A.Y. Cost assessment of gold ore deposits adjusted for capital investment // Journal of Mining Institute. 2018. Vol. 233 . p. 547-553. DOI: 10.31897/PMI.2018.5.547
Geology
  • Date submitted
    2014-12-19
  • Date accepted
    2015-02-27
  • Date published
    2015-12-25

Geological and mathematical model of secondary sulphidisation zone polarizability as a function of oil and gas deposit depth

Article preview

The differential-normalized method of electrical exploration (DNME), by means of polarization study of the secondary sulphidation zone (depth ~ 0,4-0,6 km), allows making conclusion about existence and parameters of an oil and gas deposit (depth up to ~ 2-5 km). The approximate solution of the system of nonlinear differential equations in partial derivatives for concentration of sulfur-hydrogen and pyrite (polarizability) as the function of oil-gas deposit depth has been received. The results are confirmed by experimental investigations in the North Sea.

How to cite: Putikov O.F., Ivanov S.A. Geological and mathematical model of secondary sulphidisation zone polarizability as a function of oil and gas deposit depth // Journal of Mining Institute. 2015. Vol. 216 . p. 31-37.
Geoeconomics and Management
  • Date submitted
    2014-11-27
  • Date accepted
    2015-01-15
  • Date published
    2015-10-26

Socio-economic potential of large-scale projects to develop offshore oil and gas: risks and stakeholder expectations

Article preview

The development of the Arctic shelf is a strategic long-term objective of the energy development of the Russian Federation. At the present time, resource and economic potential of offshore oil and gas development projects is huge. However, it is constrained by the complexity of developing offshore oil and gas resources due to climatic, geological and technological conditions. In addition, the current unstable situation with world oil prices is also a constraint on largescale involvement in the industrial development of offshore oil and gas resources. The aim of the research is to determine socioeconomic potential of large-scale projects to develop oil fields in the Arctic shelf of Russia. The article presents the peculiarities of developing offshore fields, which are characterized by severe climatic conditions, high environmental risks, unique technological solutions, lack of infrastructure in coastal areas. A comparative analysis of projects to develop land and shelf is performed. The regional authorities’ and businesses capability of implementing large-scale projects to develop offshore fields on economic, social and environmental criteria is identified. The positive and negative effects of socio-economic development of the territory implementing projects of hydrocarbon field development are evaluated. A schematic diagram of the socio-economic potential of hydrocarbon resources development projects reflecting the opportunities and risks of such projects from the perspective of key stakeholders is developed. A set of strategic objectives to successfully implement projects in the Arctic shelf of Russia are proposed. The findings of the research can be used by the departments of energy, industry and mineral resources in the preparation of long-term strategic development programs for the oil and gas industry.

How to cite: Cherepovitsyn A.E. Socio-economic potential of large-scale projects to develop offshore oil and gas: risks and stakeholder expectations // Journal of Mining Institute. 2015. Vol. 215 . p. 140-149.
Development of solid mineral deposits
  • Date submitted
    2010-07-21
  • Date accepted
    2010-09-08
  • Date published
    2011-03-21

Calculation methodology of physical parameters of the artificial pillar barrier

Article preview

The article is devoted to the calculation methodology of physical parameters of the artificial barrier pillar needed when developing underquarry deposits of kimberlitic pipes in difficult hydrogeological conditions.

How to cite: Adreev M.N. Calculation methodology of physical parameters of the artificial pillar barrier // Journal of Mining Institute. 2011. Vol. 189 . p. 125-129.
Development of solid mineral deposits
  • Date submitted
    2010-07-15
  • Date accepted
    2010-09-26
  • Date published
    2011-03-21

Development of the stowing material and testing of its mechanical properties

Article preview

Article is in touch with analysis of backfill materials applied on diamond mines, description of research of its mechanical properties to create the optimal compound in conditions of Yakutian kimberlitic tubes.

How to cite: Andreev M.N., Boguslavskiy E.I. Development of the stowing material and testing of its mechanical properties // Journal of Mining Institute. 2011. Vol. 189 . p. 130-133.
Problems in geodynamic safety in the exploration of solid deposits
  • Date submitted
    2009-10-23
  • Date accepted
    2009-12-11
  • Date published
    2010-09-22

Aspects in geomechanics and safety in exploration of solid mineral deposits

Article preview

The paper deals with the aspects of safety in mining at the ore mine «Norilsk nickel», the Yakovlevsky iron ore deposit, the Verkhnekamsk potassium-magnesium deposit of salts. It was shown that with due account of state of mining at the objects related to the utilization of the Earth's interior, the normative-legal support of mining regulation in the field of geomechanics is rather actual and it requires researches into the activities of mining enterprises as well as in the control work carried out by supervisory bodies of Mining Supervision.

How to cite: Perepelitsyn A.I. Aspects in geomechanics and safety in exploration of solid mineral deposits // Journal of Mining Institute. 2010. Vol. 188 . p. 23-25.
Problems in geodynamic safety in the exploration of solid deposits
  • Date submitted
    2009-10-13
  • Date accepted
    2009-12-29
  • Date published
    2010-09-22

Assessment of the level of technological production of coal reserves in mine fields with intensive mining of fiat-lying coal seams

Article preview

The levels of technological production of coal reserves in the stoping faces have been determined depending on the main determining factors, such as suitability of conditions, their preparation and equipment of longwalls.

How to cite: Baranov S.G., Rozenbaum M.A. Assessment of the level of technological production of coal reserves in mine fields with intensive mining of fiat-lying coal seams // Journal of Mining Institute. 2010. Vol. 188 . p. 43-46.
Problems in geodynamic and ecological safety in the exploration of fields of oil and das, their storage and transporta
  • Date submitted
    2009-10-02
  • Date accepted
    2009-12-23
  • Date published
    2010-09-22

The problems of efficient use of the tumenian reservoirs at final stage of low-pressure gas production and prospects in their solutions

Article preview

The reserves depletion estimation is presented for main (base) fields in the north part of the Tumenian area. The significance of long time production of base fields is shown. The main problems of efficient use are shown for reservoirs at final stage of low-pressure gas field. The methodology associated with solving the problem is formulated for low profitability in low-pressure gas output. The recommendations for State support of subsurface users are prepared for efficient low-pressure gas production and efficient use of reserves at all.

How to cite: Bugriy O.E. The problems of efficient use of the tumenian reservoirs at final stage of low-pressure gas production and prospects in their solutions // Journal of Mining Institute. 2010. Vol. 188 . p. 214-217.
Innovative approaches to the teaching of philology and the culture of disciplines in technical colleges
  • Date submitted
    2009-09-17
  • Date accepted
    2009-11-07
  • Date published
    2010-06-25

Test as the form of the economics departments students final knowledge checking at studying the discipline «Business russian as the foreign language»

Article preview

The problems, appearing when compiling test materials for the students-foreigners of the economic professions, studying sphere of business communication, are analyzed in this article. The types of mistakes, allowed students in process of the performing the checking tasks, are systematized. It is offered the examples of the exercises, presented in test.

How to cite: Kolesova E.A. Test as the form of the economics departments students final knowledge checking at studying the discipline «Business russian as the foreign language» // Journal of Mining Institute. 2010. Vol. 187 . p. 326-328.
Problems in conservation of resources? mine surveying and wise erth's interior utilization
  • Date submitted
    2009-07-03
  • Date accepted
    2009-09-10
  • Date published
    2010-04-22

Methods for calculation of methane reserves in coal seams as independent mineral resource

Article preview

Development of nonconventional resources of natural gas such as coalbed methane (CBM) demands new approaches to reserves’ calculation and economic estimation of coalbed methane fields. Experts of OS «Gazprom promgaz» have developed the method of CBM reserves calculation as independent mineral based on international and russian experience in CBM fields prospecting and production activity of CBM. The article is devoted to basic principles of new technique on an example of Taldinskoe CBM field reserves’ calculation.

How to cite: Storonskii N.M., Khryukin V.T., Shvachko E.V., Kirilchenko A.V., Mitronov D.V., Sizikov D.A. Methods for calculation of methane reserves in coal seams as independent mineral resource // Journal of Mining Institute. 2010. Vol. 185 . p. 199-204.
Problems in conservation of resources? mine surveying and wise erth's interior utilization
  • Date submitted
    2009-07-29
  • Date accepted
    2009-09-29
  • Date published
    2010-04-22

State examination of mineral reserves in the system of wise utilization of the earth’s interior

Article preview

The major problem of bodies of the government in sphere of regulation of attitudes protection of reserves creation of conditions for rational use of resources. The basic role in its decision is played with examination protection of reserves. Maintenance of effective carrying out of examination demands its constant perfection with reference to market conditions with use of the international criteria regarding both calculation and an estimation of stocks, and drawing up design and the engineering specifications on development of mineral deposits.

How to cite: Podturkin Y.A. State examination of mineral reserves in the system of wise utilization of the earth’s interior // Journal of Mining Institute. 2010. Vol. 185 . p. 188-190.
Problems in conservation of resources? mine surveying and wise erth's interior utilization
  • Date submitted
    2009-07-28
  • Date accepted
    2009-09-21
  • Date published
    2010-04-22

Legislation-legal and normative-technical support of the utilization of the earth's interior

Article preview

The article considers the aspects of the legislation-legal and normative-technical support of the Earth's interior utilization. It is noted that mineral resources in Russia appear to be the basic source for the economic development. It is shown that there is no due attention to the development of the normative-methodological base of the Earth's interior utilization.

How to cite: Zimich V.S., Vasilchuk M.P. Legislation-legal and normative-technical support of the utilization of the earth’s interior // Journal of Mining Institute. 2010. Vol. 185 . p. 191-195.
Problems in conservation of resources? mine surveying and wise erth's interior utilization
  • Date submitted
    2009-07-04
  • Date accepted
    2009-09-12
  • Date published
    2010-04-22

New technologies of conducting mine surveying works

Article preview

The paper presents principles for arrangement of mine surveying works. It is shown the role of new mine surveying and geodetic instruments and also new methods for application of these instruments in mineral mining.

How to cite: Smirnov S.P. New technologies of conducting mine surveying works // Journal of Mining Institute. 2010. Vol. 185 . p. 212-215.