The reserves depletion estimation is presented for main (base) fields in the north part of the Tumenian area. The significance of long time production of base fields is shown. The main problems of efficient use are shown for reservoirs at final stage of low-pressure gas field. The methodology associated with solving the problem is formulated for low profitability in low-pressure gas output. The recommendations for State support of subsurface users are prepared for efficient low-pressure gas production and efficient use of reserves at all.