Calculation methodology of physical parameters of the artificial pillar barrier
Authors:
About authors
- post-graduate student Saint Petersburg State Mining Institute (Technisal University)
Abstract
The article is devoted to the calculation methodology of physical parameters of the artificial barrier pillar needed when developing underquarry deposits of kimberlitic pipes in difficult hydrogeological conditions.
Область исследования:
(Archived) Development of solid mineral deposits
Funding:
None
References
- Alborov Z.B. Development of foreign deposits beneath the ponds and rivers. Moscow: Nedra, 1965.
- Borisov A.A. Rock mechanics and arrays. Moscow: Nedra, 1980.
- Kazikaev D.M. Joint development of ore deposits of the open pit and underground. Moscow: Nedra, 1967.
- Kaplunov D.R. Design principles of combined technologies during the development of major mineral deposits //
- Mining magazine. №10. 2003.
- Kaplunov D.R. Development of design theory, the integrated development of mineral resources in the development
- of the development of ore deposits // Mining magazine. 2005.
- Kartashov Y.M. Strength and deformability of rocks / Y.M.Kartashov, B.V.Matveev, G.V.Mikheev, A.B.Fadeev. Moscow: Nedra, 1980.
- Klishin V.I. Optimization of the depth of the transition from open to underground method of mining of kimberlite deposits / V.I.Klishin., A.A.Ordin, A.S.Zelberg.// Mining magazine. 2003. № 4.
Similar articles
Development of innovative potential of subjects of economic system on the basis of principles klasterization (on the example of the almazno- diamond complex)
2011 A. K. Belov, V. S. Vasiltsov
Implementation of green building standards for major territory development projects: SC «Olympstroy» experience
2011 A. O. Kharchenko, I. B. Sergeev
Experimental and theoretical studies and justification of geotechnology of stock pile formation from pelletized gold-bearing ores in order to enhance its filtration properties
2011 S. B. Tataurov