Calculation methodology of physical parameters of the artificial pillar barrier
Authors:
About authors
- post-graduate student Saint Petersburg State Mining Institute (Technisal University)
Abstract
The article is devoted to the calculation methodology of physical parameters of the artificial barrier pillar needed when developing underquarry deposits of kimberlitic pipes in difficult hydrogeological conditions.
Область исследования:
(Archived) Development of solid mineral deposits
References
- Alborov Z.B. Development of foreign deposits beneath the ponds and rivers. Moscow: Nedra, 1965.
- Borisov A.A. Rock mechanics and arrays. Moscow: Nedra, 1980.
- Kazikaev D.M. Joint development of ore deposits of the open pit and underground. Moscow: Nedra, 1967.
- Kaplunov D.R. Design principles of combined technologies during the development of major mineral deposits //
- Mining magazine. №10. 2003.
- Kaplunov D.R. Development of design theory, the integrated development of mineral resources in the development
- of the development of ore deposits // Mining magazine. 2005.
- Kartashov Y.M. Strength and deformability of rocks / Y.M.Kartashov, B.V.Matveev, G.V.Mikheev, A.B.Fadeev. Moscow: Nedra, 1980.
- Klishin V.I. Optimization of the depth of the transition from open to underground method of mining of kimberlite deposits / V.I.Klishin., A.A.Ordin, A.S.Zelberg.// Mining magazine. 2003. № 4.
Similar articles
Distribution of products of destruction of granite files
2011 G. P. Paramonov, Yu. I. Vinogradov, A. A. Kamenskiy
Modern technology concentration platinum metals from industrial waste by processing of sulphide copper-nickel ores
2011 V. N. Kovalev
Assessment of alluvial gold-bearing raw materials from the permafrost zone for justification of combined geotechnology of gold heap leaching
2011 S. B. Tataurov