To the estimation of the rate of discounting for complex manufacture
Authors:
About authors
- Saint Petersburg State Mining Institute (Technical University)
Abstract
Various methods and approaches to definition of the rate of discounting are analysed. On the basis of the given models calculation of the rate of discounting for the project of processing nepheline a concentrate is carried out.
Область исследования:
(Archived) Economics and management
Funding:
None
Similar articles
Electrical methods for nondestructive quality control of capacitors metal-oxide structures
2011 N. S. Pshchelko, S. D. Khanin
Stress-strain condition of the ore massive within the second working modeling
2011 A. G. Protosenya, K. G. Sinyakin
New features of deep structure Ozerninskiy ore cluster based on magnetotelluric sounding
2011 A V. Kozlov, M. M. Pechenkin, A. A. Savichev, T. S. Bambaev
The depth estimation of 2D conductive isometrical bodies by singular points at the tipper frequency characteristic
2011 E. Yu. Ermolin, O. Ingerov