-
Date submitted2023-11-15
-
Date accepted2024-09-24
-
Date published2024-12-25
Development and validation of an approach to the environmental and economic assessment of decarbonization projects in the oil and gas sector
- Authors:
- Nadezhda A. Sheveleva
This article addresses the problem of selecting a priority decarbonization project for an oil and gas company aiming to reduce greenhouse gas emissions. The wide range of decarbonization options and assessment methods prompted the development of a comprehensive ranking system for project selection. This system incorporates both internal and external factors of project implementation, a two-stage algorithm that filters out unsuitable projects taking into account sustainable development goals, and a quantitative evaluation approach using absolute and relative indicators. The proposed system evaluates decarbonization projects by considering not only the reduction of emissions in both absolute and relative terms, but also the broader environmental, social, and economic aspects relevant to the oil and gas company and the national economy. It includes a ranking mechanism for identifying priority projects and integrates carbon regulation incentives and green taxonomy tools into the economic assessment for more precise comparative analysis. The quantitative assessment in absolute terms involves a specialized net present value calculation, which accounts for revenue from both carbon credit sales and the potential sale of new low-carbon products, if applicable. The proposed assessment provides for targeted analysis of specific performance indicators, such as the cost per unit of emissions reduced, tax and social security contributions per unit of emissions reduced, energy efficiency improvements, and other indicators used for additional assessments of projects under otherwise equal conditions.
-
Date submitted2022-10-04
-
Date accepted2024-03-05
-
Date published2024-08-26
Localization and involvement in development of residual recoverable reserves of a multilayer oil field
During waterflooding of a multilayer oil field there is a constant deterioration of the structure and composition of residual reserves due to geological and technological reasons. The largest share of residual reserves is localized in pillars, which arise from uneven development of the production facility and are undrained or poorly drained zones. The results of a quantitative assessment of the distribution of residual oil reserves in the Middle and Upper Devonian deposits of the Romashkinskoe oil field of the Republic of Tatarstan are presented. A retrospective method is proposed to identify reserves by analyzing and summarizing historical exploration data and the long history of reservoir development, and a calculation algorithm is proposed to quantify them. It has been established that residual oil reserves are localized in rows of dividing and injection wells, as well as in the central rows of producing wells in a three-line drive, in abandoned and piezometric wells, in the areas adjacent to the zones of reservoir confluence, pinch-out, oil-bearing contours, distribution of reservoirs with deteriorated porosity and permeability properties. Depending on geological conditions, algorithms for selecting geological and technical measures to include localized reserves in development and forecasting production profiles were proposed. According to the proposed method, residual recoverable reserves were identified and a number of wells were recommended for experimental works on their additional recovery: in well 16 (hereinafter in the text, conventional well numbers are used) after isolation of overlying high-water-cut formations, the additional perforation was carried out and oil flow was obtained. Additional perforation in well 6 resulted in oil recovery during development as well. Thus, the developed approaches to identifying residual recoverable reserves and patterns of their spatial distribution can be recommended in other multilayer oil fields with a long history of development.
-
Date submitted2023-07-07
-
Date accepted2023-09-20
-
Date published2024-02-29
Isotherm and kinetic adsorption of rice husk particles as a model adsorbent for solving issues in the sustainable gold mining environment from mercury leaching
One of the techniques used in extracting gold in small-scale gold mining is mercury amalgamation. However, the use of mercury presents significant health and environmental hazards, as well as suboptimal efficiency in gold extraction. This study explores the possibility of the use of rice husk as a prototype adsorbent for mercury removal from its leaching in mining environments. To support the analysis, the rice husk adsorbent was characterized by Fourier-transform infrared spectroscopy, scanning electron microscopy, electron dispersive X-ray spectroscopy, atomic absorption spectrophotometers and Brunauer − Emmett − Teller analysis. To investigate the removal of Hg from aqueous solutions, batch adsorption experiments were conducted, and the efficiency was optimized under various parameters such as contact time, rice husk dosage, and initial concentration of mercury. Kinetic and isotherm investigations were also carried out to gain a better understanding of the adsorption properties. The kinetic adsorption was analyzed using the pseudo-first-order and pseudo-second-order. Furthermore, the isotherm adsorption was analyzed using ten adsorption isotherm models (i.e., Langmuir, Freundlich, Temkin, Dubinin – Radushkevich, Flory – Huggins, Fowler – Guggenheim, Hill – de Boer, Jovanovic, Harkin – Jura, and Halsey). The amount of mercury absorption increased with increasing contact time, adsorbent mass, and initial concentration of mercury. The pseudo-second-order kinetic model is the best model that can be applied to describe the adsorption process. Analysis of the adsorption results obtained shows that the adsorption pattern is explained through the formation of a monolayer without any lateral interaction between the adsorbate and adsorbent. In addition, the formation of multilayers due to inhomogeneous pore distribution also occurs which causes a pore filling mechanism. We found that the isotherm phenomena are near the Jovanovic models with the maximum adsorption capacity) of rice husk found to be 107.299 mg/g. As a result, rice husk could be a promising option for wastewater treatment due to its fast and efficient removal capacity, as well as its affordability and eco-friendliness. The predicted thermodynamic studies using the Flory – Huggins isotherm model show that the adsorption process is endothermic, spontaneous, and physisorption. The impact shows that the utilization of rice husk can be used and fit for the current issues in the sustainable development goals (SDGs).
-
Date submitted2021-10-31
-
Date accepted2023-03-02
-
Date published2023-12-25
Improvement of technological schemes of mining of coal seams prone to spontaneous combustion and rock bumps
On the example of the Alardinskaya mine, the problem of underground mining of seams prone to spontaneous combustion and rock bumps in the conditions of the Kondomsky geological and economic region of the Kuznetsk coal basin is considered. The contradictions in the requirements of regulatory documents for the width of the inter-panel coal pillars in the mining of seams with longwalls in conditions of endogenous fire hazard and in the mining of seams that are dangerous due to geodynamical phenomena are discussed. These contradictions impede the safe mining of seams using traditionally used layouts with the danger of spontaneous combustion of coal and rock bumps. A mining-geomechanical model is presented, which is used for numerical three-dimensional simulation of the stress-strain state of a rock mass with various layouts for longwall panels using the finite element method. The results of the numerical analysis of the stress state of the rock mass immediately before the rock bump are presented, and the main factors that contributed to its occurrence during the mining of the seam are established. A dangerous degree of stress concentration in the coal seam near the leading diagonal entries is shown, especially in conditions of application of abutment pressure from the edge of panels’ gob. The analysis of the features of stress distribution in the inter-panel pillar at different widths is carried out. Recommendations for improving the layout for the development and mining of coal seams that are prone to spontaneous combustion and dangerous in terms of rock bumps in the conditions of Alardiskaya mine have been developed. The need for further studies of the influence of pillars for various purposes, formed during the mining of adjacent seams, on the stress-strain state of previously overmined and undermined seams is shown.
-
Date submitted2022-04-05
-
Date accepted2022-07-21
-
Date published2022-11-10
Development of resource-saving technology for excavation of flat-lying coal seams with tight roof rocks (on the example of the Quang Ninh coal basin mines)
- Authors:
- Vladimir P. Zubov
- Le Quang Phuc
It is shown that the creation of the variants of resource-saving systems for the development of long-column mining is one of the main directions for improving the technological schemes for mining operations in the mines of the Kuang Nin coal basin. They provide a reduction in coal losses in the inter-column pillars and the cost of maintaining preliminary workings fixed with anchorage. The implementation of these directions is difficult (and in some cases practically impossible) when tight rocks are lying over the coal seam, prone to significant hovering in the developed space. In the Quang Ninh basin, 9-10 % of the workings are anchored, the operational losses of coal reach 30 % or more; up to 50 % of the workings are re-anchored annually. It is concluded that the real conditions for reducing coal losses and the effective use of anchor support as the main support of reusable preliminary workings are created when implementing the idea put forward at the St. Petersburg Mining University: leaving the coal pillar of increased width between the reused mine working and the developed space and its subsequent development on the same line with the stoping face simultaneously with the reclamation of the reused mine working.
-
Date submitted2021-07-05
-
Date accepted2022-01-24
-
Date published2022-04-29
Ensuring the excavation workings stability when developing excavation sites of flat-lying coal seams by three workings
- Authors:
- Oleg I. Kazanin
- Andrei A. Ilinets
On the basis of analysis of mining plans and field studies at mines of JSC SUEK-Kuzbass, it is shown that in conditions of increasing the size of excavation columns during the development of flat-lying coal seams the stress-strain state of the rock mass along the workings length changes significantly. The necessity of predicting the stress-strain state at the design stage of the workings timbering standards, as well as subsequent monitoring of the workings roof state and its changes in the mining operations using video endoscopes, is noted. The results of numerical studies of the stress-strain state of the rock mass during the development of excavation sites by three workings for various combinations of width of the pillars between the workings for mining-geological and mining-technical conditions of the “Taldinskaya-Zapadnaya-2” mine are provided. The stresses in the vicinity of the three workings are compared with the values obtained during the development of the excavation sites by double drift. A set of recommendations on the choice of the location of the workings, the width of pillars, timbering standards that ensure the stable condition of the workings throughout the entire service life at the minimal losses of coal in the pillars is presented.
-
Date submitted2021-06-15
-
Date accepted2021-08-27
-
Date published2021-10-21
Prospects for the use of modern technological solutions in the flat-lying coal seams development, taking into account the danger of the formation of the places of its spontaneous combustion
- Authors:
- Vladimir P. Zubov
- Dmitrii D. Golubev
Spontaneous combustion of coal remains an important problem for coal mines, which can lead to an explosion of methane and coal dust. Accidents associated with spontaneous combustion of coal can cause significant economic losses to coal mining companies, as well as entail social damage – injuries and loss of life. Accidents are known at the Kuzbass mines, which occurred as a result of negligent attitude to the danger of spontaneous combustion of coal, the victims of which were dozens of people. The analysis of emergency situations associated with spontaneous combustion of coal shows that the existing wide range of means of preventing endogenous fires does not provide complete safety when working out coal seams prone to spontaneous combustion, therefore, spontaneous combustion places continue to occur in mines. The consequences that may arise as a result of a methane explosion initiated by a self-ignition place indicate the need to improve the used technologies. The purpose of the work is to determine the impact of modern technological solutions used in functioning mines during underground mining of flat-lying coal seams prone to spontaneous combustion, and to develop new solutions that reduce endogenous fire hazard. Conclusions on the influence of leaving coal pillars in the developed space, isolated air removal from the stoping face through the developed space, the length of the stoping face and the excavation pillar, and other factors on the danger of the formation of spontaneous combustion places are presented. Conclusions about the possibility of using modern technological solutions in future are also drawn.
-
Date submitted2020-02-19
-
Date accepted2020-04-17
-
Date published2020-10-08
Decrease in coal losses during mining of contiguous seams in the near-bottom part at Vorkuta deposit
- Authors:
- Oleg I. Kazanin
- Valeriy V. Yaroshenko
The problem of formation of extended zones with high rock pressure (HRP) from safety pillars at the boundaries of extraction pillars formed due to the mine layout of complex geometry is considered at the example of JSC Vorkutaugol mines. A detailed analysis of the remaining reserves of the near-bottom part of the deposit was carried out to estimate losses and the impact of HRP zones from the Chetvertyi protective seam to mining operations on the Troinoi upper seam along with the possibilities for the reduction of sizes of HRP zones at the account of expanding the underworked space. Due to research on the near-bottom part of the Vorkuta deposit, within the framework of the accepted layout, a zone at the Komsomolskaya mine and two zones at the Zapolyarnaya-2 mine were singled out, at which losses at the boundaries of the extraction pillars amount up to 13-22 % of the total resources of the mine field. The high volume of losses in these pillars indicates the relevance of research on the priority extraction impact of protective seams on the efficiency and safety of mining operations in the working area of underworked and HRP zones. Based on the analysis of foreign and Russian experience in the pillar cleaning-up at the boundaries of working areas and the methodical guidelines and instructions, a technological scheme was developed that allows increasing the coal mining recovery factor in the near-bottom part of the Vorkuta deposit from 0.75 to 0.9 without fundamental changing of the ventilation and transport networks and also without purchasing any additional mining equipment. The conducted economic calculations confirmed the effectiveness of implementing the new technological scheme for cleaning-up reserves at the boundaries of extraction districts. The economic effect is from 0.079 to1.381 billion rubles of additional profit from coaxial extraction pillars, depending on the mining and geological conditions and the size of the pillars.
-
Date submitted2019-09-29
-
Date accepted2020-02-24
-
Date published2020-04-24
Vs sustainable development: scenarios for the future
Issues of sustainable development began to concern mankind starting from the 20th century, when mass industrialization and the depletion of natural resource potential contributed to the formulation of environmental issues at one of the leading places in scientific discourse. However, what if the goals of sustainable development would not be achieved to 2030? What other way we can identify for humanity to survive? So, the study is about the problems of studying the understanding of the term “sustainable development”, considering the evolution of the formation of the concept of sustainable development and analyzing the modern goals of sustainable development for attainability. From an analysis of domestic and foreign experience, possible scenarios of the development of mankind are identified (such as 1. Creating an environmental framework, 2. Implementation of sustainable nature management practices in the conditions of natural and man-made objects, 3. Implementation of “geoengineering projects”, 4. Construction of autonomous ecosystems, 5. Space exploration in search of a new planet for life, provided that the goals of sustainable development would not be achieved. It has been established that today probability of achieving all the sustainable development goals by 2030 is too small, and the indicated scenarios require, firstly, the development of science and technology, and secondly, a competent assessment of the value of nature and solving the issue of specifying property rights for natural goods.
-
Date submitted2019-02-26
-
Date accepted2019-05-22
-
Date published2019-08-23
Systemic Diagnostics of the Arctic Industry Development Strategy
The article analyzes organizational and economic problems of the industry in the Arctic and discloses methods and tools for researching these problems. An attempt to use the method of system diagnostics is made, which has established itself as a basis for determining the development strategy of industry in the Arctic zone of the Russian Federation (AZRF). This method allows to explore the mechanism of natural resources development in the Arctic, such as hydrocarbons and marine biological resources; as well as the organization of logistics and transport corridors for trade of goods produced in the North and in the central regions of Russia. The role, significance and content of the strategy as an essential element of the system for managing natural wealth development in the Arctic in the context of its growing importance in development of global transport corridor are revealed. Importance of a systematic approach to the development of industry in the Arctic is substantiated, it will ensure development of all investors interested in this region; will allow the state, large corporations, small and medium-sized businesses to work together for the long term. The proposed method for system diagnostics of strategizing the development of industrial potential in the AZRF can be used in the implementation of «Development Strategy for the Arctic Region» as part of roadmap realization for the Arctic region.
-
Date submitted2018-11-14
-
Date accepted2019-01-06
-
Date published2019-04-23
Prospects of geomechanics development in the context of new technological paradigm
- Authors:
- V. L. Trushko
- A. G. Protosenya
The article describes the role of geomechanics for forecasting the development of geosystems and ensuring the safety of mining operations during the transition to a new technological paradigm. The state and prospects of development of the mineral resource base, including the Arctic zone of the Russian Federation, are considered. The directions of technological breakthroughs and the possibility of transforming industrial production based on «cross-cutting» technology and the digital economy are presented. The analysis of geomechanical problems was carried out considering advanced technological changes and the rapid growth of requirements for the preservation of the Earth’s interior and natural landscapes. The concept of the development of geomechanics and geodynamics to ensure rational subsoil use in terms of the use of «breakthrough» technology is proposed, and the need to integrate scientific and industry collaboration into the system of engineering and professional education is shown.
-
Date submitted2018-07-22
-
Date accepted2018-09-07
-
Date published2018-12-21
Game theory model of state in-vestment into territories of advanced development in the regions of mineral resources specialization
- Authors:
- A. V. Kozlov
- A. B. Teslya
- S. A. Chernogorskii
Historically developed and non-compliant with modern conditions, the structure of industry placement and related inequality in economic development of certain territories are additional negative factors that hinder economic development of the country. Hence, the search for new organizational forms and methods of territorial development, facilitation of industrial growth in regions with mineral resources specialization become more and more relevant. Another no less important issue is justification of economic feasibility of using such tools and assessment of critical consequences of their application. Suggested by the authors, game theory model of state investment into territories of advanced development describes the method of limited resources distribution and becomes an instrument to assess the feasibility of investment into creation of advanced development territories under the conditions of insufficient information and actions of specific interest groups. Application of the suggested game theory model of state investment into creation of advanced development territories allows to forecast behavior of program participants, to model consequences of management decisions both for government structures and separate program participants.
-
Date submitted2018-07-18
-
Date accepted2018-09-22
-
Date published2018-12-21
Forecasting rock burst hazard of tectonically disturbed ore massif at the deep horizons of Nikolaevskoe polymetallis deposit
- Authors:
- D. V. Sidorov
- M. I. Potapchuk
- A. V. Sidlyar
The subject of the research is the stress-strain and rock burst hazardous state of the ore massif of the Nikolaevskoe polymetallic deposit, formed under the influence of complex mining-geological and mining-technical factors. The purpose of the research is to establish the peculiarities of the formation of technogenic stress fields at the deposit, which is characterized by a block structure, a complex tectonic system and the presence of a large volume of developed spaces. Volumetric geodynamic modeling of the stress-strain state of the massif at different stages of the development of the deep horizons of the deposit was carried out by collecting information on the structure, properties and geodynamic state of the rock mass. The assessment of stress changes taking into account the effect of hypsometry, the configuration of the selvages, the physical-mechanical properties of the ore deposit and host rocks, the presence of tectonic disturbances was made using the developed numerical algorithms, the automation equipment of the initial data and the PRESS 3D URAL software. The simulation made it possible to establish that tectonic faults in the massif lead to a qualitative change in the stress-strain state in certain parts of the ore massif and in the pillars, namely, the reduction of stresses along the tectonic faults and their growth in nearby pillars. The identified features of the distribution of stresses in the tectonically disturbed rock massif of the Nikolaevskoe deposit will allow to identify in advance potentially hazardous areas both at the planning stage of mining operations and during development, as well as to work out effective rock burst measures to increase the safety of mining. The results of research can be used in enterprises with similar mining-geological and mining-technical conditions.
-
Date submitted2017-11-09
-
Date accepted2018-01-02
-
Date published2018-04-24
Analyis of government support tools for mining companies in the Russian Arctic zone
The paper focuses on the development of mining companies in the Russian Arctic zone in the context of searching for new ways to improve government control over the development of the Arctic zone. Existing outer restrictions imposed upon Russia and changes in the global financial market not only determined a paradigm shift to regional government control, but also dictated the need to search for new mechanisms of state influence on the regional economy. Primarily it concerns the development of growth zones based on utilizing resource potential, creation and implementation of tools aimed at attracting investments to the Arctic zone and offsetting the factors of northern appreciation for mining companies. With this in mind, government support of specific regional development projects is becoming an urgent issue. The authors analyze new approaches to the development of public management in the Russian Arctic zone, for mining companies in particular, aimed at creating special economic conditions that would stimulate the operation of plants extracting mineral resources. Research methodology is based upon the analysis of factors restricting economic development and growth of the Russian Arctic zone and mining companies in the first place, as well as analysis of possible tools to support mining plants operating in the Arctic territories (advanced development zones, industrial clusters, «supporting zones»). The authors define priority goals and prospects of implementing such operation mode for mining companies in the Arctic zone, and propose a list of possible measures of government support needed to stimulate development of mining companies and the entire Arctic economy of Russia.
-
Date submitted2013-07-20
-
Date accepted2013-09-20
-
Date published2014-03-17
Interchamber pillars partial working off technology at the floor-and-chamber system of development of the Korobkovsky deposit of KMA
- Authors:
- E. I. Boguslavskii
- M. N. Andreev
Article is devoted to a choice of rational technology of mining of part of stocks interchamber pillars at floor-and-chamber system of development of the Korobkovsky deposit of KMA. Authors carried out calculations and comparison of technical and economic parameters of two offered technologies of mining: horizontal layers with a stowing in an ascending order with application of a portable equipment and horizontal layers with a stowing in an ascending order with a driving of autobiases in interpanel pillars. For a choice of method of development for mining of part of interchamber pillar and determination of its parameters and indicators.
-
Date submitted2010-07-23
-
Date accepted2010-09-28
-
Date published2011-03-21
Sistaining mining in whole different rigidity
- Authors:
- L. K. Gorshkov
- S. G. Kokoev
Studies conducted in the mines «Rostovugol», showed that, for assessing the sustainability of preparatory excavations in the management of sewage treatment works is enough to determine the allowable values of convergence of the roof and ground-level workings and potential energy of elastic deformation of the pillars. These indicators can be used in the coal mines of other basins.
-
Date submitted2010-07-29
-
Date accepted2010-09-30
-
Date published2011-03-21
Research of opencast reloading point’s influence оn bench turnover rate
- Authors:
- G. A. Kholodnyakov
- M. M. Yakubovskiy
In article it is considered influence of reloading points on bench turnover rate. The scheme of ore reloading with alternation of concentration horizon on the adjacent ledges is offered. It allows limit depth of distribution temporarily non-working rock pillar to work space.
-
Date submitted2009-10-14
-
Date accepted2009-12-07
-
Date published2010-09-22
Determination of coal pillar sizes in preparation of seams with paired mine workings
- Authors:
- N. V. Krotov
- F. P. Ivchenko
- D. V. Sidorov
The results of introduction at coal mines of the methods for determination of coal pillar sizes in preparation of rockburst-hazardous seams with paired workings are discussed in the paper. Safe values of advancing in drivage of development workings with formation of yielding have been established.
-
Date submitted2009-10-29
-
Date accepted2009-12-09
-
Date published2010-09-22
Problems and ways of exploration of the raw material resources base of the Zapoliarny branch of the Norilsk Nickel CO
Consideration is given to the geological, mining and operating conditions of the Norilsk industrial district. The analysis is made of the present-day state of mining production of the Zapoliarny branch of the Norilsk Nickel Co. The principal trends in the safe and efficient exploration of the raw material resources base have been stated within the Norilsk industrial district .
-
Date submitted2009-10-07
-
Date accepted2009-12-22
-
Date published2010-09-22
Providing of safe conditions for mining of shaftbottom protective pillars in deep ore mines at Тalnakh
- Authors:
- V. A. Zvezdkin
- A. G. Anokhin
- R. B. Galaov
Consideration is given to the causes complicating the mining of shaftbottom pillar and protection of shaft lining. The analysis is given to the formation of stress-strain state of the protective pillar and its enclosing rocks. Practical recommendations are given for control of deformation and stresses in the shaftbottom mass during extraction of protective pillars in deep ore mines at Talnakh.
-
Date submitted2009-10-25
-
Date accepted2009-12-19
-
Date published2010-09-22
Principal technologies for prevention of natural dangers at coal mines
- Authors:
- Jozef Dubinsky
Modern mining of mineral resources to be the industry accepted by the society must meet the criteria for sustainable development. Work safety is its important element, which is a particular sphere in underground coal mines in the view of natural hazards occurring numerously, including the catastrophic failures. Among them are gas hazard, fires and rock burst hazard. The selected methodological solutions in terms of their recognition and technologies applicable for the actively combat of these threats, which are featured by high efficiency, have been pointed out.
-
Date submitted2009-09-06
-
Date accepted2009-11-14
-
Date published2010-06-25
The estimation of mass velocities in a layered roof and dividing pillars of the mining system in the time of influence of shock stress waves
- Authors:
- V. V. Karpenko
- G. A. Kolton
The mass velocity diagrams transformation in the layered border zone of the mining system in the time of tension explosion waves influence is considered. The explosion wave front is suggested to be parallel to the proximate handing roof environs discontinuity. Under the admitted assumption the mass velocity epures transformation is investigated in the layered roof stone of the mining system and in the dividing pillar.
-
Date submitted2009-09-07
-
Date accepted2009-11-17
-
Date published2010-06-25
The transformation of zone of potentially dangerous accumulative wrecks in a layeked mining roof when combined effect of the rock pressure and shock stress waves
- Authors:
- V. V. Karpenko
The transformation of potentially dangerous zone of wrecks accumulation in the layeredroof of the mining system is considered, in the time of combined action of geostatic pressure and tension shok wave. The explosion wave front is suggested to be parallel to the proximate handing roof environs discontinuity. Under this condition in the article is considered the influence of levels of critical stress and the depth of opening location on the change of implicitly dangerous zone of faults accumulation in the layers of the root stone.
-
Date submitted2009-08-13
-
Date accepted2009-10-30
-
Date published2010-02-01
Reducing losses ore between whole chamber for the design of lower layers mine by Gubkin of open joint-stock company «Industrial complex KMAruda»
- Authors:
- E. I. Boguslavskiy
- P. V. Korzhavykh
Technological decisions on decrease in losses of ore in between chamber walls are considered at designing of the bottom horizons of mine of Gubkin. It is offered two variants of decrease in losses of the ore technologically compatible with each other for their simultaneous use. Results of calculation of losses of ore and economic consequences are resulted. The basic actions which are necessary for carrying out, before introduction of technological decisions in manufacture are described.
-
Date submitted2009-07-20
-
Date accepted2009-09-24
-
Date published2010-04-22
Methods for presetting of artificial yielding to anthracite pillars
- Authors:
- S. G. Stradanchenko
- N. V. Titov
- Yu. V. Turuk
The article contains the results of in situ investigation of influence of yielding pillars on the stability of protected workings with different modes of preset yielding. Graphs of roof movements in the workings protected with yielding pillars, are given.