Determination of coal pillar sizes in preparation of seams with paired mine workings
About authors
- 1 — Saint Petersburg State Mining Institute (Technical University)
- 2 — Saint Petersburg State Mining Institute (Technical University)
- 3 — Saint Petersburg State Mining Institute (Technical University)
Abstract
The results of introduction at coal mines of the methods for determination of coal pillar sizes in preparation of rockburst-hazardous seams with paired workings are discussed in the paper. Safe values of advancing in drivage of development workings with formation of yielding have been established.
Similar articles
Prediction of dynamic manifestations of rock pressure in the all over automated longwalls
2010 M. Roiter, V. Kurfyurst, K. Mairkhofer, Yu. Veksler
Reuse of development workings as an element of providing the effective coal output
2010 M. A. Ilyashov
Control of dynamic rock pressure manifestations in mining the «Antey» deposit
2010 I. Yu. Rasskazov, G. A. Kursakin, B. G. Saksin, A. A. Filinkov, V. S. Svyatetskii, B. A. Prosekin