Determination of coal pillar sizes in preparation of seams with paired mine workings
About authors
- 1 — Ph.D. leading research assistant Saint Petersburg State Mining Institute (Technical University)
- 2 — Ph.D. leading research assistant Saint Petersburg State Mining Institute (Technical University)
- 3 — Ph.D. laboratory head Saint Petersburg State Mining Institute (Technical University)
Abstract
The results of introduction at coal mines of the methods for determination of coal pillar sizes in preparation of rockburst-hazardous seams with paired workings are discussed in the paper. Safe values of advancing in drivage of development workings with formation of yielding have been established.
Область исследования:
(Archived) Problems in geodynamic safety in the exploration of solid deposits
Similar articles
Some geomechanical aspects in the development of calculation methods of rock pressure in permanent mine workings
2010 A. M. Kozel
Geomechanical foundations of the safe extraction in joint mining of rich, coppery and ore patches in deep ore mines at Тalnakh
2010 V. A. Zvezdkin, A. A. Andreev
Geologo-geomechanical developments of structures of deep vertical shafts at coal mines in Donbass
2010 V. V. Levit, S. V. Borshchevskii
Modeling of geomechanical processes in mining the steeply pitching ore bodies of rockburst-hazardous deposits
2010 I. Yu. Rasskazov, M. I. Rasskazova, V. I. Miroshnikov, B. G. Saksin