Submit an Article
Become a reviewer
Vol 188
Pages:
125-126
Download volume:
RUS

Determination of coal pillar sizes in preparation of seams with paired mine workings

Authors:
N. V. Krotov1
F. P. Ivchenko2
D. V. Sidorov3
About authors
  • 1 — Ph.D. leading research assistant Saint Petersburg State Mining Institute (Technical University)
  • 2 — Ph.D. leading research assistant Saint Petersburg State Mining Institute (Technical University)
  • 3 — Ph.D. laboratory head Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2009-10-14
Date accepted:
2009-12-07
Date published:
2010-09-22

Abstract

The results of introduction at coal mines of the methods for determination of coal pillar sizes in preparation of rockburst-hazardous seams with paired workings are discussed in the paper. Safe values of advancing in drivage of development workings with formation of yielding have been established.

Keywords:
rock bursts coal pillars yielding pillars
Go to volume 188

Similar articles

Prediction of geodynamic processes in exploitation of the rockburst-dangerous North-Urals bauxite deposit
2010 D. V. Sidorov, O. B. Shonin
Regularities of progressing of technogenic seismic activity in mining areas
2010 S. V. Tsirel
Problems and ways of exploration of the raw material resources base of the Zapoliarny branch of the Norilsk Nickel CO
2010 M. N. Bogdanov, R. B. Galaov, A. N. Shabarov, V. A. Zvezdkin
Investigation of regularities of rock inrush forming in productive faces of сoal mines
2010 Yu. M. Khalimendik, A. V. Brui, M. V. Chemakina
Principal technologies for prevention of natural dangers at coal mines
2010 Jozef Dubinsky
Investigation of present-day stress-strain state of rock mass by the results of observations at geodynamic polygons
2010 S. N. Savchenko, E. V. Kasparyan, Yu. G. Smagina