Determination of coal pillar sizes in preparation of seams with paired mine workings

Authors:
N. V. Krotov1
F. P. Ivchenko2
D. V. Sidorov3
About authors
  • 1 — Ph.D. leading research assistant Saint Petersburg State Mining Institute (Technical University)
  • 2 — Ph.D. leading research assistant Saint Petersburg State Mining Institute (Technical University)
  • 3 — Ph.D. laboratory head Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2009-10-14
Date accepted:
2009-12-07
Date published:
2010-09-22

Abstract

The results of introduction at coal mines of the methods for determination of coal pillar sizes in preparation of rockburst-hazardous seams with paired workings are discussed in the paper. Safe values of advancing in drivage of development workings with formation of yielding have been established.

Область исследования:
(Archived) Problems in geodynamic safety in the exploration of solid deposits
Keywords:
rock bursts coal pillars yielding pillars
Go to volume 188

Similar articles

Some geomechanical aspects in the development of calculation methods of rock pressure in permanent mine workings
2010 A. M. Kozel
Systematization of factors to be considered in mine abandonment design
2010 S. P. Reshetnyak, Yu. V. Fedotova, V. V. Doroshenko
Stress condition of prefabricated tunnel linning with initial release
2010 E. A. Karasev
Influence of blocky-hierarchy structure of geological medium on the forming of natural and technogenic geodynamic fields in the North-West part of the Amur geoblock
2010 I. Yu. Rasskazov, B. G. Saksin
Prediction of dynamic manifestations of rock pressure in the all over automated longwalls
2010 M. Roiter, V. Kurfyurst, K. Mairkhofer, J. Veksler
Regularities of progressing of technogenic seismic activity in mining areas
2010 S. V. Tsirel