Determination of coal pillar sizes in preparation of seams with paired mine workings
About authors
- 1 — Saint Petersburg State Mining Institute (Technical University)
- 2 — Saint Petersburg State Mining Institute (Technical University)
- 3 — Saint Petersburg State Mining Institute (Technical University)
Abstract
The results of introduction at coal mines of the methods for determination of coal pillar sizes in preparation of rockburst-hazardous seams with paired workings are discussed in the paper. Safe values of advancing in drivage of development workings with formation of yielding have been established.
Similar articles
Preconditions for prediction of technogenic seismic activity by cycles of objects of the solar system
2010 B. G. Tarasov, A. G. Olovyannyi, L. V. Bugalenko
Some geomechanical aspects in the development of calculation methods of rock pressure in permanent mine workings
2010 A. M. Kozel
Monitoring of deformation processes of the earth surface with methods of differential interferometric treatment of radar data
2010 A. A. Krivenko, Yu. A. Kashnikov
Research of deformation, strength and filtration characteristics of Nizhnechutinskoe oil field’s reservoirs in case of depression making in the process of oilwells exploitation
2010 A. V. Petukhov, A. A. Petukhov