Interchamber pillars partial working off technology at the floor-and-chamber system of development of the korobkovsky deposit of KMA
About authors
- 1 — National Mineral Resources University (Mining University)
- 2 — National Mineral Resources University (Mining University)
Abstract
Article is devoted to a choice of rational technology of mining of part of stocks interchamber pillars at floor-and-chamber system of development of the Korobkovsky deposit of KMA. Authors carried out calculations and comparison of technical and economic parameters of two offered technologies of mining: horizontal layers with a stowing in an ascending order with application of a portable equipment and horizontal layers with a stowing in an ascending order with a driving of autobiases in interpanel pillars. For a choice of method of development for mining of part of interchamber pillar and determination of its parameters and indicators.
References
- Андреев М.Н. Процессы очистных работ при разработке рудных месторождений. Доставка руды погрузочно-доставочными машинами: Учеб. пособие / М.Н.Андреев, Э.И.Богуславский, П.В.Коржавых; Национальный минерально-сырьевой университет «Горный». СПб, 2013. 69 с.
- Баранов А.О. Проектирование технологических схем и процессов при подземной добыче руд. М.: Недра, 1993. 282 с.
- Прикладные аспекты изучения механических процессов в массивах при подземной разработке месторождений полезных ископаемых / О.В.Ковалев, С.П.Мозер, И.Ю.Тхориков, Е.Б.Куртуков, Е.Р.Ковальский. СПб: Недра, 2012. 166 с.
- Тонких А.И. Технико-экономические расчеты при подземной разработке рудных месторождений: Учеб. пособие /А.И.Тонких, В.Н.Макишин, И.Г.Ивановский. Владивосток: Изд-во ДВГТУ, 2007. 137 с.