Physical modeling of interchamber pillars fixity in Gubkin mine
About authors
- 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
- 2 — Ph.D. laboratory head National Mineral Resources University (Mining University)
- 3 — Ph.D. Assistant lecturer National Mineral Resources University (Mining University)
Abstract
Procedure of Korobkovsky iron-ore deposit new levels mining with the usage of physical modeling has been determined. Evaluation of interchamber pillars fixity in Gubkin mine and soil surface deformation in the process of lift mining and fractional interchamber pillars robbing on three levels has been carried out. After conducting geomechanical research the decision of foremost development and mining of bottom level reserve between –125 m / –250 m has been made.
Область исследования:
(Archived) Geotechnology for development of solid mining fields
Funding:
None
References
- Glushikhin F.P, Kuznetsov G.N., Shklyarskij M.F. and others. Simulation in geomechanics. Moscow: Nedra, 1991. 240 p.
- Kuznetsov G.N., Budko M.N., Vasiljev Yu.I. and others. Simulation of mining pressure occurrences. Leningrad: Nedra, 1968. 280 p.
Similar articles
Stopes walls stabilization at the rich iron ore mining by the flat-back cut-and-fill method
2014 V. P. Zubov, M. D. Morozov, A. S. Malyutin
Mathematical modelling of applied problems of rock mechanics and rock massifs
2014 A. P. Gospodarikov, M. A. Zatsepin
Method of normal load prediction on vertical shaft lining based on nonlinear behaviour of rock mass
2014 A. G. Protosenya, Nguen Ny Bai
Primary forecast of density-related nonstationarity of cross-section upper part
2014 I. B. Movchan, V. Yu. Asyanina