Physical modeling of interchamber pillars fixity in Gubkin mine
About authors
- 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
- 2 — Ph.D. laboratory head National Mineral Resources University (Mining University)
- 3 — Ph.D. Assistant lecturer National Mineral Resources University (Mining University)
Abstract
Procedure of Korobkovsky iron-ore deposit new levels mining with the usage of physical modeling has been determined. Evaluation of interchamber pillars fixity in Gubkin mine and soil surface deformation in the process of lift mining and fractional interchamber pillars robbing on three levels has been carried out. After conducting geomechanical research the decision of foremost development and mining of bottom level reserve between –125 m / –250 m has been made.
Область исследования:
(Archived) Geotechnology for development of solid mining fields
References
- Glushikhin F.P, Kuznetsov G.N., Shklyarskij M.F. and others. Simulation in geomechanics. Moscow: Nedra, 1991. 240 p.
- Kuznetsov G.N., Budko M.N., Vasiljev Yu.I. and others. Simulation of mining pressure occurrences. Leningrad: Nedra, 1968. 280 p.
Similar articles
Experimental researches on definition energy costs of workers, depending on the parameters of the cooling microclimate
2014 A. F. Galkin, R. G. Khusainova
Comparative analysis of methods of waste disposal biological treatment of the fuel and energy complex
2014 A. E. Isakov
Influence of disjunctive dislocations on parameters of secure zones on flat-lying adjacent coal seams
2014 V. P. Zubov, E. R. Kovalskii, A. V. Nikiforov