Submit an Article
Become a reviewer
Vol 207
Pages:
17-21
Download volume:
RUS
Article

Physical modeling of interchamber pillars fixity in Gubkin mine

Authors:
E. I. Boguslavskiy1
B. Yu. Zuev2
P. V. Korzhavykh3
About authors
  • 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
  • 2 — Ph.D. laboratory head National Mineral Resources University (Mining University)
  • 3 — Ph.D. Assistant lecturer National Mineral Resources University (Mining University)
Date submitted:
2013-07-29
Date accepted:
2013-09-24
Date published:
2014-03-17

Abstract

Procedure of Korobkovsky iron-ore deposit new levels mining with the usage of physical modeling has been determined. Evaluation of interchamber pillars fixity in Gubkin mine and soil surface deformation in the process of lift mining and fractional interchamber pillars robbing on three levels has been carried out. After conducting geomechanical research the decision of foremost development and mining of bottom level reserve between –125 m / –250 m has been made.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
physical modeling equivalent materials procedure of levels mining iron-ore deposits
Funding:

None

Go to volume 207

References

  1. Glushikhin F.P, Kuznetsov G.N., Shklyarskij M.F. and others. Simulation in geomechanics. Moscow: Nedra, 1991. 240 p.
  2. Kuznetsov G.N., Budko M.N., Vasiljev Yu.I. and others. Simulation of mining pressure occurrences. Leningrad: Nedra, 1968. 280 p.

Similar articles

Increase of stability of mine workings in the permafrost zone
2014 A. F. Galkin
A new chemical method of dust suppression for the storage of the rock mass
2014 G. I. Korshunov, V. P. Kovshov, S. V. Kovshov, A. Kh. Erzin
Technology options for the preparation of new horizons
2014 G. A. Kholodnyakov, D. N. Ligotskii
Assessment of the longwall face length influence on gas emission at longwall panels of the OJSC «Vorkutaugol» coal mines
2014 O. I. Kazanin, A. M. Sufiyarov
Determination of ore reclaiming efficiency on accumulation and bedding stockyards
2014 V. A. Shevelev
Increasing efficiency and mine resource development on the Prokopevsk-Kisilevsky deposit
2014 E. A. Kochetkova, A. A. Sidorenko, V. V. Sementsov