Physical modeling of interchamber pillars fixity in Gubkin mine

Authors:
E. I. Boguslavskiy1
B. Yu. Zuev2
P. V. Korzhavykh3
About authors
  • 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
  • 2 — Ph.D. laboratory head National Mineral Resources University (Mining University)
  • 3 — Ph.D. Assistant lecturer National Mineral Resources University (Mining University)
Date submitted:
2013-07-29
Date accepted:
2013-09-24
Date published:
2014-03-17

Abstract

Procedure of Korobkovsky iron-ore deposit new levels mining with the usage of physical modeling has been determined. Evaluation of interchamber pillars fixity in Gubkin mine and soil surface deformation in the process of lift mining and fractional interchamber pillars robbing on three levels has been carried out. After conducting geomechanical research the decision of foremost development and mining of bottom level reserve between –125 m / –250 m has been made.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
physical modeling equivalent materials procedure of levels mining iron-ore deposits
Go to volume 207

References

  1. Glushikhin F.P, Kuznetsov G.N., Shklyarskij M.F. and others. Simulation in geomechanics. Moscow: Nedra, 1991. 240 p.
  2. Kuznetsov G.N., Budko M.N., Vasiljev Yu.I. and others. Simulation of mining pressure occurrences. Leningrad: Nedra, 1968. 280 p.

Similar articles

Primary forecast of density-related nonstationarity of cross-section upper part
2014 I. B. Movchan, V. Yu. Asyanina
Experience of implementing electromagnetic shielding on OJSC «Mordovcement»
2014 P. S. Sedov, S. V. Kovshov, Z. N. Cherkai
Application of the method of x-ray fluorescence for carrying out monitoring of the soil and vegetable cover
2014 M. A. Kulikova
Ways of improving waste disposal in the workings of salt mines
2014 O. V. Kovalev, S. P. Mozer
Quality management of brown coal at open-pit mine in the presence of several consumers with varios requirements to it
2014 M. M. Yakubovskii, K. Drebenshtedt
Analytical estimation of aerodynamic characteristics of the main roof collapse
2014 V. V. Smirnyakov