Interchamber pillars partial working off technology at the floor-and-chamber system of development of the Korobkovsky deposit of KMA

Authors:
E. I. Boguslavskii1
M. N. Andreev2
About authors
  • 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
  • 2 — Ph.D. Assistant lecturer National Mineral Resources University (Mining University)
Date submitted:
2013-07-20
Date accepted:
2013-09-20
Date published:
2014-03-17

Abstract

Article is devoted to a choice of rational technology of mining of part of stocks interchamber pillars at floor-and-chamber system of development of the Korobkovsky deposit of KMA. Authors carried out calculations and comparison of technical and economic parameters of two offered technologies of mining: horizontal layers with a stowing in an ascending order with application of a portable equipment and horizontal layers with a stowing in an ascending order with a driving of autobiases in interpanel pillars. For a choice of method of development for mining of part of interchamber pillar and determination of its parameters and indicators.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
Korobkovsky deposit ferruterous quartzites geological and hydrogeological conditions physic mechanical properties of breeds method of working off of a deposit development system stowing working off stowing
Go to volume 207

Similar articles

Optimization of work of dust supperession sprayer with use of computing modelling
2014 Yu. D. Smirnov, O. S. Dobrynin
Parameters of removing the overburden for deposits complex structure of carbonate rocks
2014 V. V. Ivanov
Water economic recultivation of sandy opencasts in Leningrad region as the complex way of decision of region’s environmental problems
2014 S. V. Kovshov, M. M. Yakubovskii, V. P. Kovshov
Ways of improving waste disposal in the workings of salt mines
2014 O. V. Kovalev, S. P. Mozer
Experience of implementing electromagnetic shielding on OJSC «Mordovcement»
2014 P. S. Sedov, S. V. Kovshov, Z. N. Cherkai
Mining units quantity determination to achieve the established open cast output and averaging ore requirements
2014 S. I. Fomin, V. A. Shevelev, M. A. Marinin