Use of coefficient of output at pit delimitation
About authors
- 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
- 2 — post-graduate student National Mineral Resources University (Mining University)
Abstract
In work it is settled an invoice the final depth of a pit of the conditional complex occurrence presented by three minerals. It is shown that when developing complex occurrence it is more expedient to use coefficient of output, instead of overburden ratio.
Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
open-pit boundary
overburden ratio
coefficient of output
possible producing cost
final depth of a pit
Funding:
None
References
- Holodnyakov G.A. Borders of open-cast mining of complex mineral deposits. Leningrad Mining Institute. Leningrad, 1986.
- Arsentyev A.I. Determination of productivity and borders of pits. Мoscow: Nedra, 1970.
Similar articles
Interchamber pillars partial working off technology at the floor-and-chamber system of development of the Korobkovsky deposit of KMA
2014 E. I. Boguslavskii, M. N. Andreev
Development free-chemical metod of cltaning water out from oil on the cmf companies
2014 M. A. Pashkevich, I. A. Golubev
Analysis of accident and stages of effective safety management system on the example of «Vorkutaugol»
2014 E. G. Buldakova, E. B. Gridina
About the long-range programme for industrial and ecological safety in coal branch of industry