Mining units quantity determination to achieve the established open cast output and averaging ore requirements
About authors
- 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
- 2 — master of technique and technology, post-graduate student National Mineral Resources University (Mining University)
- 3 — post-graduate student National Mineral Resources University (Mining University)
Abstract
The balancing stripping ratio and ore production methods include simulation in order to reduce the prestripping waste and maintain a suitable space between each bench. The reliability analysis method of mining technological system in mine design is discussed in this paper. The probabilistic approach used here takes into consideration the uncertainty associated with estimation of most economic, mining and geological variables. This paper concerns the rational distribution of reserves which can be mined and waste advancing down the open cast site at steep pitch deposit.
Область исследования:
(Archived) Geotechnology for development of solid mining fields
References
- Arsentyev A.I. Holodnyakov G.A. Design of mining operations in the open mining. Мoscow: Nedra, 1994. 336 р.
- Bastan P.P., Azbel Е.I., Кluchkin Е.М. Theory and practice of ore reclaiming. Moscow: Nedra, 1979. 256 p.
Similar articles
Assessment of the longwall face length influence on gas emission at longwall panels of the OJSC «Vorkutaugol» coal mines
2014 O. I. Kazanin, A. M. Sufiyarov
Interchamber pillars partial working off technology at the floor-and-chamber system of development of the Korobkovsky deposit of KMA
2014 E. I. Boguslavskii, M. N. Andreev
Physical modeling of interchamber pillars fixity in Gubkin mine
2014 E. I. Boguslavskiy, B. Yu. Zuev, P. V. Korzhavykh
Research of technogenic migration of manganese in water objects of the Kovdor area
2014 V. A. Petrova, M. A. Pashkevich