Submit an Article
Become a reviewer
Vol 207
Pages:
70-73
Download volume:
RUS
Article

Mining units quantity determination to achieve the established open cast output and averaging ore requirements

Authors:
S. I. Fomin1
V. A. Shevelev2
M. A. Marinin3
About authors
  • 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
  • 2 — master of technique and technology, post-graduate student National Mineral Resources University (Mining University)
  • 3 — post-graduate student National Mineral Resources University (Mining University)
Date submitted:
2013-07-26
Date accepted:
2013-09-18
Date published:
2014-03-17

Abstract

The balancing stripping ratio and ore production methods include simulation in order to reduce the prestripping waste and maintain a suitable space between each bench. The reliability analysis method of mining technological system in mine design is discussed in this paper. The probabilistic approach used here takes into consideration the uncertainty associated with estimation of most economic, mining and geological variables. This paper concerns the rational distribution of reserves which can be mined and waste advancing down the open cast site at steep pitch deposit.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
reserves which can be mined opencast mine ore output deposit bench mining units
Funding:

None

Go to volume 207

References

  1. Arsentyev A.I. Holodnyakov G.A. Design of mining operations in the open mining. Мoscow: Nedra, 1994. 336 р.
  2. Bastan P.P., Azbel Е.I., Кluchkin Е.М. Theory and practice of ore reclaiming. Moscow: Nedra, 1979. 256 p.

Similar articles

Parameters of removing the overburden for deposits complex structure of carbonate rocks
2014 V. V. Ivanov
Development free-chemical metod of cltaning water out from oil on the cmf companies
2014 M. A. Pashkevich, I. A. Golubev
Application of the method of x-ray fluorescence for carrying out monitoring of the soil and vegetable cover
2014 M. A. Kulikova
Determination of ore reclaiming efficiency on accumulation and bedding stockyards
2014 V. A. Shevelev
Open cast geological conditions analysis and the mining units formation in ore losses and dilution determining
2014 S. I. Fomin, P. B. Kava, M. A. Marinin
Certain periodicity organizational and technical preventive measures, aimed at improving the effective management of safety on coal open pit mining
2014 E. B. Gridina, A. V. Pasynkov