Mining units quantity determination to achieve the established open cast output and averaging ore requirements

Authors:
S. I. Fomin1
V. A. Shevelev2
M. A. Marinin3
About authors
  • 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
  • 2 — master of technique and technology, post-graduate student National Mineral Resources University (Mining University)
  • 3 — post-graduate student National Mineral Resources University (Mining University)
Date submitted:
2013-07-26
Date accepted:
2013-09-18
Date published:
2014-03-17

Abstract

The balancing stripping ratio and ore production methods include simulation in order to reduce the prestripping waste and maintain a suitable space between each bench. The reliability analysis method of mining technological system in mine design is discussed in this paper. The probabilistic approach used here takes into consideration the uncertainty associated with estimation of most economic, mining and geological variables. This paper concerns the rational distribution of reserves which can be mined and waste advancing down the open cast site at steep pitch deposit.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
reserves which can be mined opencast mine ore output deposit bench mining units
Funding:

None

Go to volume 207

References

  1. Arsentyev A.I. Holodnyakov G.A. Design of mining operations in the open mining. Мoscow: Nedra, 1994. 336 р.
  2. Bastan P.P., Azbel Е.I., Кluchkin Е.М. Theory and practice of ore reclaiming. Moscow: Nedra, 1979. 256 p.

Similar articles

Experimental researches on definition energy costs of workers, depending on the parameters of the cooling microclimate
2014 A. F. Galkin, R. G. Khusainova
Method of normal load prediction on vertical shaft lining based on nonlinear behaviour of rock mass
2014 A. G. Protosenya, Nguen Ny Bai
Stopes walls stabilization at the rich iron ore mining by the flat-back cut-and-fill method
2014 V. P. Zubov, M. D. Morozov, A. S. Malyutin
Prospects of improving technology for development of coalseams in Vietnam’s undergroundmines
2014 Kao Kuok Vet, V. P. Zubov
Experience of implementing electromagnetic shielding on OJSC «Mordovcement»
2014 P. S. Sedov, S. V. Kovshov, Z. N. Cherkai
Determination of ore reclaiming efficiency on accumulation and bedding stockyards
2014 V. A. Shevelev