Submit an Article
Become a reviewer
Vol 207
Pages:
81-83
Download volume:
RUS
Article

Technology options for the preparation of new horizons

Authors:
G. A. Kholodnyakov1
D. N. Ligotskii2
About authors
  • 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
  • 2 — Ph.D. associate professor National Mineral Resources University (Mining University)
Date submitted:
2013-07-13
Date accepted:
2013-09-03
Date published:
2014-03-17

Abstract

The paper considers the advantages and disadvantages of technological options for the training of new horizons in the fields of mineral resources with large water production using excavators such as direct and backhoes.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
opening and preparation of a new horizon water production pulp the bottom of the pit trench and pit parameters
Funding:

None

Go to volume 207

Similar articles

Increasing efficiency and mine resource development on the Prokopevsk-Kisilevsky deposit
2014 E. A. Kochetkova, A. A. Sidorenko, V. V. Sementsov
Modern technology of consumption waste management in the mining agglomeration
2014 M. Sh. Barkan, A. B. Makhovikov, E. I. Kabanov
Mining units quantity determination to achieve the established open cast output and averaging ore requirements
2014 S. I. Fomin, V. A. Shevelev, M. A. Marinin
Status and development of mining and enrichment of rare earth metals in Russia
2014 M. N. Andreev
Endogenous fire hazard Kuzbass mines
2014 A. A. Sidorenko
Justification of effective dust control in the open-pits of cryolithozone
2014 E. P. Dalbaeva