Submit an Article
Become a reviewer
Vol 207
Pages:
106-109
Download volume:
RUS
Article

Certain periodicity organizational and technical preventive measures, aimed at improving the effective management of safety on coal open pit mining

Authors:
E. B. Gridina1
A. V. Pasynkov2
About authors
  • 1 — Ph.D. associate professor National Mineral Resources University (Mining University)
  • 2 — post-graduate student National Mineral Resources University (Mining University)
Date submitted:
2013-07-09
Date accepted:
2013-09-01
Date published:
2014-03-17

Abstract

Developing preventative preventive measures is one of the key ways to increase the effectiveness of occupational health and safety of miners. Integrated use of probabilistic and expert - analytical methods for analysis of injury, in particular it allows to develop a plan and to deter-mine the frequency of short-term preventive measures.

Область исследования:
(Archived) Industrial safety and health care in mining
Keywords:
safety injuries prevention coal mine a probabilistic method expert-analytical method
Funding:

None

Go to volume 207

References

  1. Ushakov K.Z., Kaledin N.O., Kirin B.F. et al. Life safety: Textbook for Universities. 2nd ed., sr. Moscow: Publ. house of the Moscow State Mining University, 2005. 429 p.
  2. Koch R. The 80/20 / Translated from English D.I.Kapgkan. 2nd ed. Moscow: «Popouri» Ltd, 2004. 352 p.

Similar articles

Technology options for the preparation of new horizons
2014 G. A. Kholodnyakov, D. N. Ligotskii
Identification of degradation of soil and vegetable communities testing technogenic loading on materials of space shooting
2014 D. S. Korelskii
Reducing environmental hazard drilling works
2014 M. M. Malyshkin
Tracing the forecast structural elements while interpretation of remote sensing data within Fresnillo city (Central Mexica)
2014 I. B. Movchan, V. Yu. Asyanina
Assessment of the longwall face length influence on gas emission at longwall panels of the OJSC «Vorkutaugol» coal mines
2014 O. I. Kazanin, A. M. Sufiyarov
Physical modeling of interchamber pillars fixity in Gubkin mine
2014 E. I. Boguslavskiy, B. Yu. Zuev, P. V. Korzhavykh