Sistaining mining in whole different rigidity
About authors
- 1 — Ph.D., Dr.Sci. professor Petersburg State Mining Institute (Technical University)
- 2 — Petersburg State Mining Institute (Technical University)
Abstract
Studies conducted in the mines «Rostovugol», showed that, for assessing the sustainability of preparatory excavations in the management of sewage treatment works is enough to determine the allowable values of convergence of the roof and ground-level workings and potential energy of elastic deformation of the pillars. These indicators can be used in the coal mines of other basins.
Keywords:
coal seam
preliminary mining
pillar
convergence
the potential energy of elastic deformation
roofing
soil
yielding pillar
References
- Артемьев В.Б. Охрана подготовительных выработок целиками на угольных шахтах / В.Б.Артемьев, Г.И.Коршунов, А.К.Логинов и др. СПб.: Наука, 2009.
- Горшков Л.К. Опыт охраны подготовительных выработок на угольных шахтах / Л.К.Горшков, В.Н.Монахов, С.Г.Кокоев // Народное хозяйство Республики Коми. Воркута-Сыктывкар-Ухта, 2010. Т.19. № 1.
- Горшков Л.К. Прогноз и оценка удароопасности угольных пластов / Л.К.Горшков, В.Н.Монахов, Е.В.Шишкин, С.Г.Кокоев // Экология и развитие общества. МАНЭБ. Санкт-Петербург, 2010.
- Петухов И.М. Горные удары на угольных шахтах. М.: Недра, 1972
Similar articles
Value Δ34S in millerite and genesys of clinochlore-brindleyite-chamosite nickel ores in the Elov supergene deposit (North Urals)
2011 O. P. Mezentseva, I. V. Talovina
Application of the gpr method for investigetion of barring condition and outbarring spaces «Оctyabr’skiy» mine
2011 V. V. Glazunov, S. M. Danilev
Algorithm of control of the electric drive with ventilniy electric motor and the converter of frequency with the active rectifier
2011 A. P. Emelyanov, A. O. Sviridenko