Submit an Article
Become a reviewer
Valeriy V. Yaroshenko
Assistant Lecturer, Ph.D.
Saint Petersburg Mining University
Personal or department link
Assistant Lecturer, Ph.D.
Personal or department link
Saint Petersburg Mining University
Saint Petersburg
Russia
25
Total cited
3
Hirsch index

Co-authors

Articles

Mining
  • Date submitted
    2020-02-19
  • Date accepted
    2020-04-17
  • Date published
    2020-10-13

Decrease in coal losses during mining of contiguous seams in the near-bottom part at Vorkuta deposit

Article preview

The problem of formation of extended zones with high rock pressure (HRP) from safety pillars at the boundaries of extraction pillars formed due to the mine layout of complex geometry is considered at the example of JSC Vorkutaugol mines. A detailed analysis of the remaining reserves of the near-bottom part of the deposit was carried out to estimate losses and the impact of HRP zones from the Chetvertyi protective seam to mining operations on the Troinoi upper seam along with the possibilities for the reduction of sizes of HRP zones at the account of expanding the underworked space. Due to research on the near-bottom part of the Vorkuta deposit, within the framework of the accepted layout, a zone at the Komsomolskaya mine and two zones at the Zapolyarnaya-2 mine were singled out, at which losses at the boundaries of the extraction pillars amount up to 13-22 % of the total resources of the mine field. The high volume of losses in these pillars indicates the relevance of research on the priority extraction impact of protective seams on the efficiency and safety of mining operations in the working area of underworked and HRP zones. Based on the analysis of foreign and Russian experience in the pillar cleaning-up at the boundaries of working areas and the methodical guidelines and instructions, a technological scheme was developed that allows increasing the coal mining recovery factor in the near-bottom part of the Vorkuta deposit from 0.75 to 0.9 without fundamental changing of the ventilation and transport networks and also without purchasing any additional mining equipment. The conducted economic calculations confirmed the effectiveness of implementing the new technological scheme for cleaning-up reserves at the boundaries of extraction districts. The economic effect is from 0.079 to1.381 billion rubles of additional profit from coaxial extraction pillars, depending on the mining and geological conditions and the size of the pillars.

How to cite: Kazanin O.I., Yaroshenko V.V. Decrease in coal losses during mining of contiguous seams in the near-bottom part at Vorkuta deposit // Journal of Mining Institute. 2020. Vol. 244. p. 395-401. DOI: 10.31897/PMI.2020.4.1