Research of opencast reloading point’s influence оn bench turnover rate

Authors:
G. A. Kholodnyakov1
M. M. Yakubovskiy2
About authors
  • 1 — Ph.D., Dr.Sci. professor Saint Petersburg State Mining Institute (Technical University)
  • 2 — post-graduate student Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2010-07-29
Date accepted:
2010-09-30
Date published:
2011-03-21

Abstract

In article it is considered influence of reloading points on bench turnover rate. The scheme of ore reloading with alternation of concentration horizon on the adjacent ledges is offered. It allows limit depth of distribution temporarily non-working rock pillar to work space.

Keywords:
haulage level temporarily non-working rock pillar intensity of exploitation
Go to volume 189

References

  1. Арсентьев А.И. Проектирование горных работ при открытой разработке месторождений / А.И. Арсентьев, Г.А. Холодняков. М.: Недра, 1994. 336 с.
  2. Галкин В.И. Инженерная логистика погрузочно-разгрузочных транспортных и складских работ на горных предприятиях / В.И.Галкин, Е.Е.Шешко. МГГУ. М., 2009. 156 с.
  3. Линев В.П. Определение параметров рабочего борта карьера на участке размещения перегрузочных пунктов // Сб. науч. тр. ИГД МЧМ СССР. 1986. № 81. С. 71-79.
  4. Якубовский М.М. Совмещенный перегрузочный пункт при комбинированном автомобильно-железнодорожном транспорте / М.М.Якубовский, Г.А.Холодняков // Записки Горного института. 2010. Т.186. С. 90-93.

Similar articles

The problem of cadastral valuation of the forest land
2011 E. A. Lagutenko
Application of seismic reflection method for engineering-geological issues solving in Saint Petersburg and Leningrad region
2011 A. S. Yakovlev
Sistaining mining in whole different rigidity
2011 L. K. Gorshkov, S. G. Kokoev
Improvement development of technology for processing electronic scrap concentrates
2011 T. A. Aleksandrova, A. N. Telyakov
Selection of parameters camouflet blasting to reduce bump hazard by development uranium deposits
2011 D. Yu. Dordzhiev
Parameters of underground operations in combined mining of kimberlite deposits
2011 G. F. Piven