Submit an Article
Become a reviewer

Search articles for by keywords:
reserve estimation

Geotechnical Engineering and Engineering Geology
  • Date submitted
    2024-04-16
  • Date accepted
    2024-09-24
  • Date published
    2024-11-12

Deep-buried Lower Paleozoic oil and gas systems in eastern Siberian Platform: geological and geophysical characteristics, estimation of hydrocarbon resources

Article preview

The study of deep-buried oil and gas systems is a promising trend in the preparation of hydrocarbon resources. The study of the factors determining oil and gas potential is extremely important. The Lena-Vilyui sedimentary basin in the eastern Siberian Platform has a potential for the discovery of large oil and gas fields in deep-buried Cambrian deposits. The use of original methodological approaches to the analysis of black shale and overlying deposits, generalization of the results of lithological, biostratigraphic and geochemical studies of Cambrian deposits in territories adjoining the study area, modern interpretation of geophysical data showed that siliceous, carbonate, mixed rocks (kerogen-mixtite) of the Kuonamka complex and clastic clinoform-built Mayan deposits are most interesting in terms of oil and gas potential. Oil and gas producing rocks of the Lower and Middle Cambrian Kuonamka complex subsided to the depths of 14 km. The interpretation of modern seismic surveying data confirms the hypothesis of a limited occurrence of the Upper Devonian Vilyui rift system. Based on generalization of geological, geophysical and geochemical archival and new materials on the Lower Paleozoic deposits of the eastern Siberian Platform, a probabilistic estimation of geological hydrocarbon resources of the Cambrian and younger Paleozoic complexes in the Lena-Vilyui sedimentary basin was performed. Based on basin modelling results it was concluded that the resources were mainly represented by gas. It is presumed that oil resources can be discovered in traps of the barrier reef system as well as on the Anabar and Aldan slopes of the Vilyui Hemisyneclise. With a confidence probability of 0.9, it can be stated that total initial resources of oil and gas (within the boundaries of the Vilyui Hemisyneclise) exceed 5 billion t of conventional hydrocarbons. The recommended extremely cautious estimate of resources of the pre-Permian complexes is 2.2 billion t of conventional hydrocarbons. In the study area, it is necessary to implement a program of deep and super-deep parametric drilling without which it is impossible to determine the oil and gas potential of the Lower Paleozoic.

How to cite: Kontorovich A.E., Burshtein L.M., Gubin I.A., Parfenova T.M., Safronov P.I. Deep-buried Lower Paleozoic oil and gas systems in eastern Siberian Platform: geological and geophysical characteristics, estimation of hydrocarbon resources // Journal of Mining Institute. 2024. Vol. 269 . p. 721-737. EDN WDBEOS
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2022-10-04
  • Date accepted
    2024-03-05
  • Date published
    2024-08-26

Localization and involvement in development of residual recoverable reserves of a multilayer oil field

Article preview

During waterflooding of a multilayer oil field there is a constant deterioration of the structure and composition of residual reserves due to geological and technological reasons. The largest share of residual reserves is localized in pillars, which arise from uneven development of the production facility and are undrained or poorly drained zones. The results of a quantitative assessment of the distribution of residual oil reserves in the Middle and Upper Devonian deposits of the Romashkinskoe oil field of the Republic of Tatarstan are presented. A retrospective method is proposed to identify reserves by analyzing and summarizing historical exploration data and the long history of reservoir development, and a calculation algorithm is proposed to quantify them. It has been established that residual oil reserves are localized in rows of dividing and injection wells, as well as in the central rows of producing wells in a three-line drive, in abandoned and piezometric wells, in the areas adjacent to the zones of reservoir confluence, pinch-out, oil-bearing contours, distribution of reservoirs with deteriorated porosity and permeability properties. Depending on geological conditions, algorithms for selecting geological and technical measures to include localized reserves in development and forecasting production profiles were proposed. According to the proposed method, residual recoverable reserves were identified and a number of wells were recommended for experimental works on their additional recovery: in well 16 (hereinafter in the text, conventional well numbers are used) after isolation of overlying high-water-cut formations, the additional perforation was carried out and oil flow was obtained. Additional perforation in well 6 resulted in oil recovery during development as well. Thus, the developed approaches to identifying residual recoverable reserves and patterns of their spatial distribution can be recommended in other multilayer oil fields with a long history of development.

How to cite: Burkhanov R.N., Lutfullin A.A., Raupov I.R., Maksyutin A.V., Valiullin I.V., Farrakhov I.M., Shvydenko M.V. Localization and involvement in development of residual recoverable reserves of a multilayer oil field // Journal of Mining Institute. 2024. Vol. 268 . p. 599-612. EDN DKXZSP
Energy industry
  • Date submitted
    2024-06-12
  • Date accepted
    2024-07-18
  • Date published
    2024-07-26

Development of parameters for an industry-specific methodology for calculating the electric energy storage system for gas industry facilities

Article preview

The issue of determining the main parameters of electric energy storage systems – power and energy intensity – is being considered, the determination of which is a fundamentally important task when introducing such devices into the power supply systems of enterprises for both technical (technological) and economic reasons. The work analyzes problems that can be solved by installing electricity storage systems at gas industry facilities. An industry-wide methodology has been developed for calculating the parameters of an electricity storage system based on traditional methods and methods aimed at minimizing the standardized cost of electricity with adaptation to the conditions of the gas industry. A distinctive feature of the presented methodology is the ability to determine the power and energy intensity of electricity storage systems when performing several functions. The methodology was tested at a typical gas industry facility – the Yarynskaya compressor station of OOO Gazprom Transgaz Ukhta, a characteristic feature of which is an autonomous power supply system. An example is given of calculating the electricity storage normalized cost using an improved LCOS indicator, which takes into account the effect of changing the fill factor of the electrical load schedule on the amount of gas consumption by a power plant for its own needs. To confirm the economic efficiency of introducing electricity storage systems calculated using the above methodology, calculations of the integral effect, net present value and efficiency index are presented.

How to cite: Tokarev I.S. Development of parameters for an industry-specific methodology for calculating the electric energy storage system for gas industry facilities // Journal of Mining Institute. 2024. p. EDN UIZSOQ
Economic Geology
  • Date submitted
    2022-10-14
  • Date accepted
    2022-12-13
  • Date published
    2023-02-27

Carbon capture and storage: net zero contribution and cost estimation approaches

Article preview

Carbon capture, utilization, and storage (CCUS) are a combination of necessary and promising technologies that can help reduce CO2 emissions, which are not used on a large scale due to the high cost of solutions. This article aims to review and analyze carbon capture and storage (CCS) projects in terms of their net zero contribution and cost estimates. The study identified a wide range of cost estimation methods that can be applied to CCS projects and revealed such issues as a lack of standardization, limited data, and cost data variability. Still, several common trends were found, including the classification of CCS adopters into low-cost and high-cost industries, cost estimation by CCS step (capture, transportation, storage) and industry (power generation, other sectors), and calculation of relative indices to make comparisons with other decarbonization options. The results of the study can serve as a foundation for developing approaches to estimating the costs of CCS in Russia, which are necessary for planning government support measures and involving businesses in the implementation of these initiatives.

How to cite: Skobelev D.O., Cherepovitsyna A.A., Guseva T.V. Carbon capture and storage: net zero contribution and cost estimation approaches // Journal of Mining Institute. 2023. Vol. 259 . p. 125-140. DOI: 10.31897/PMI.2023.10
Economic Geology
  • Date submitted
    2022-03-09
  • Date accepted
    2022-11-17
  • Date published
    2023-02-27

Development of methodology for economic evaluation of land plots for the extraction and processing of solid minerals

Article preview

The Russian economy has a pronounced resource specialization; in many regions, subsoil use is a backbone or one of the main areas of the economy. In these conditions, the improvement of the methodology for the economic evaluation of lands on which mining enterprises are located is of particular relevance. On the basis of the existing experience in assessing industrial land, the authors present a developed methodology for determining the cadastral value of land plots where mining enterprises are located, taking into account their industry characteristics and the specifics of production and commercial activities. At the same time, cadastral valuation is considered as a specific form of economic valuation. Particular emphasis is placed on the importance of taking into account the cost factors that have the greatest impact on the formation of the cost of land for the extraction and processing of solid minerals, and the method of assessment depending on the characteristics of the object. To carry out theoretical research, the methods of analysis and synthesis of legal and scientific and technical literature in the field of cadastral and market valuation of land were used in the work. The practical part is based on the application of expert methods, including the method of analysis of hierarchies, system and logical analysis. The method of M.A.Svitelskaya was chosen as the basis, which presents a combination of modified methods of statistical (regression) modeling and modeling based on specific indicators of cadastral value. The use of this technique in economic practice contributes to increasing the efficiency of cadastral valuation and the objectivity of its results.

How to cite: Bykowa E.N., Khaykin М.М., Shabaeva Y.I., Beloborodova М.D. Development of methodology for economic evaluation of land plots for the extraction and processing of solid minerals // Journal of Mining Institute. 2023. Vol. 259 . p. 52-67. DOI: 10.31897/PMI.2023.6
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2022-05-23
  • Date accepted
    2022-07-21
  • Date published
    2023-02-27

Alluvial tin mining by spray-suction borehole method: a case study on remaining alluvial tin reserves in Bangka Belitung, Indonesia

Article preview

The area of the Bangka Belitung Islands, which is a potential area for alluvial tin deposits in Indonesia, has been affected by the destruction of tin reserves on the mainland due to rampant artisanal mining, which has left remnants of small-dimensional reserves. The remnants of these reserves can no longer be mined using the hydraulic mining of open pit method due to the small dimensions of the deposits. The hypothesis is that such sedimentary conditions can only be mined by the borehole method. This research aimed to design tools and perform test mining using the borehole method with a spray-suction mechanism. This research produced a novelty, namely, a method and parameters for alluvial tin deposits mining using borehole mining methods, such as the excavation capacity, excavation radius, mining recovery, and dilution factor. The benefit of this research is expected to provide an opportunity to increase the amount of onshore alluvial tin reserves to support tin production.

How to cite: Ichwan A., Wibowo A.P., Anggayana K., Widodo N.P. Alluvial tin mining by spray-suction borehole method: a case study on remaining alluvial tin reserves in Bangka Belitung, Indonesia // Journal of Mining Institute. 2023. Vol. 259 . p. 3-12. DOI: 10.31897/PMI.2022.70
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2021-07-07
  • Date accepted
    2021-10-18
  • Date published
    2021-12-16

Influence of hydraulic compression on porosity and permeability properties of reservoirs

Article preview

Active development of hard-to-recover oil reserves causes the need for an innovative approach to methods of oil recovery and intensification of its production, based on taking into account the specifics of filtration processes in low-productive reservoirs and complex geological and physical conditions. Pilot works for studying the mechanism of changes in porosity and permeability properties of reservoirs during swabbing of wells are presented. Based on the hydrodynamic investigations performed, the results of the work are analyzed. The method of oil production intensification using hydraulic compression of formation has been developed. It has been shown that when using hydraulic compression technology in the pore space of the formation, the effect of capillary and gravitational forces is strongly reduced. The influence of these forces decreases when significant pressure gradients with changing direction are formed during well swabbing for depression impact on the bottomhole zone of the formation. Hydraulic compression induced an increase in well productivity and flow rate; insights into how how permeability and porosity properties change during well swabbing were clarified. The range of compressive durability (minimum and maximum values) was determined for the Verean deposits of the Melekeskaya Depression and the South Tatar arch. The impact of formation hydraulic compression caused changes in permeability and porosity properties of the reservoir in the bottomhole zone on a qualitative level. Piezo- and hydraulic conductivity increased by 20 %. Experimental work in well 1545 of Keremetyevskoe field showed an increase of piezo- and hydraulic conductivity coefficients, effective formation thickness, change of filtration flows character.

How to cite: Khuzin R.R., Andreev V.E., Mukhametshin V.V., Kuleshova L.S., Dubinskiy G.S., Safiullina А.R. Influence of hydraulic compression on porosity and permeability properties of reservoirs // Journal of Mining Institute. 2021. Vol. 251 . p. 688-697. DOI: 10.31897/PMI.2021.5.8
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2021-02-24
  • Date accepted
    2021-10-18
  • Date published
    2021-12-16

A probabilistic approach to the dynamic cut-off grade assessment

Article preview

Cut-off grade is an important conditioning parameter that determines the quantity and quality of recoverable reserves and development efficiency. Today, Russian mining companies operate with certified quality requirements. By setting permanent quality requirements, the government seeks to prevent depletion of reserves, reduced production during periods of falling prices, and decreased budget revenues, expressing the interests of all members of society. But to what extent do the permanent quality requirements protect the interests of the state? The answer to this question is ambiguous and does not lie on the surface. The State Commission for Reserves and domestic researchers are working to find a rational solution to the problem of quality requirements. One solution is dynamic quality requirements. The effectiveness of their application has been proven for individual mining companies, but it is incorrect to transfer these conclusions to the entire mineral resource base of the country. This article presents a new approach to determining the dynamic cut-off grade, which varies depending on the price of minerals. The dynamic cut-off grade is proposed to be determined based on the indicators of constant requirements to the quality of exploration work, using the maximum allowable costs in the region. The approach allows to calculate the effect of the introduction of dynamic cut-off grade in the practice of subsurface use for the state (in the form of the amount of taxes received) and for subsoil users (in the form of the amount of income). For a group of gold-bearing deposits with open-pit mining method, it was established that the development of reserves using dynamic values of the cut-off grade in periods of price changes ensures compliance with the interests of the state and subsoil users.

How to cite: Bragin V.I., Kharitonova M.Y., Matsko N.A. A probabilistic approach to the dynamic cut-off grade assessment // Journal of Mining Institute. 2021. Vol. 251 . p. 617-625. DOI: 10.31897/PMI.2021.5.1
Oil and gas
  • Date submitted
    2019-05-30
  • Date accepted
    2019-09-03
  • Date published
    2020-02-25

Study on influence of two-phase filtration transformation on formation of zones of undeveloped oil reserves

Article preview

In order to study the process of fluid filtration during flooding of an oil field, article uses Rapoport – Lis model of non-piston oil displacement by water. During plane-radial filtration in a homogeneous formation, radii of disturbance zones are determined with and without taking into account the end effect. Influence of changes in value of capillary pressure gradient on distribution of water saturation coefficient in the non-piston displacement zone for high and low permeability reservoirs is revealed. Application of an element model for a five-point injection and production well placement system showed that, using traditional flooding technology, flat-radial fluid filtration is transformed into rectilinear-parallel. At solving equation of water saturation, Barenblatt method of integral relations was used, which allows determining the transformation time. By solving the saturation equation for rectilinear-parallel filtration, change in the value of water saturation coefficient at bottomhole of production well for an unlimited and closed deposit is determined. It is shown that an increase in water cut coefficient of a production well is possible only for a closed formation. To determine coefficient of water saturation in a closed deposit, a differential equation with variable coefficients is obtained, an iterative solution method is proposed. In the element of the five-point system, oil-saturated zones not covered by development were identified. For channels of low filtration resistance, conditions for their location in horizontal and vertical planes are established. It is shown that, at maintaining formation pressure, there is an isobar line in formation, corresponding to initial formation pressure, location of which determines direction of fluid crossflow rates. Intensity of crossflows affects application efficiency of hydrodynamic, physical and chemical, thermal and other methods of enhanced oil recovery.

How to cite: Grachev S.I., Korotenko V.A., Kushakova N.P. Study on influence of two-phase filtration transformation on formation of zones of undeveloped oil reserves // Journal of Mining Institute. 2020. Vol. 241 . p. 68-82. DOI: 10.31897/PMI.2020.1.68
Geoeconomics and Management
  • Date submitted
    2018-05-22
  • Date accepted
    2018-07-04
  • Date published
    2018-10-24

Cost assessment of gold ore deposits adjusted for capital investment

Article preview

The paper focuses on the problems of geologic and economic assessment of mineral deposits. Existing methods have certain advantages and disadvantages, but always rely on unified assessment criteria that fail to take into account specific parameters of each deposit. The author proposes a method of quick and simple cost assessment of gold ore deposits based on ore reserves data. Suggested approach allows to evaluate a true price of gold ore deposits that takes into account field preparation and development costs, as well as to calculate threshold (recommended) amount of investment. Besides that, the method permits to assess the contribution that mineral reserves and resources make to the cumulative market price of the mining company. The method is based on the analysis of empirical data from actual purchases of gold ore (and associated metals) deposits made by Polymetal International PLC. The results of statistical research are incorporated in a formula of threshold deposit price taking into account field preparation and development costs. Comparison between deposit prices obtained from actual purchase deals and forecast results demonstrates high convergence rate (R = 0.97). The greatest error in the forecast results is attributed to insufficient attention to the geographical position of deposits, existence of infrastructure and relevant facilities. The method has been tested on three purchases of gold ore assets made by Polymetal International PLC and demonstrated high convergence with actual deal prices.

How to cite: Zaitsev A.Y. Cost assessment of gold ore deposits adjusted for capital investment // Journal of Mining Institute. 2018. Vol. 233 . p. 547-553. DOI: 10.31897/PMI.2018.5.547
Mining
  • Date submitted
    2016-09-05
  • Date accepted
    2016-10-27
  • Date published
    2017-02-22

Impact of the shape of geological contact on mining losses in the process of near-contact zone development

Article preview

In Russia development of mineral resources is carried out on a truly grand scale, and mining industry is in its essence a basic sector, supporting and facilitating the development of national economy. It predetermines the need of safe and responsible attitude towards riches of our subsoil – mineral resources. With this in mind, one of the key requirements to extraction technologies is minimization of mining losses and ore dilution. The biggest ore losses in the mining block take place in the process of development of contact areas between the ore body and surrounding rocks, due to differences between development pattern and surface of geological contact. Complexity of the contact between ore and surrounding rocks is traditionally characterized by so called «stochastic contact zone». Technological difficulty of extracting ore from the ore – wallrock contact is determined by volatility of geometric parameters in «stochastic contact zone» in the plane of geological contact. Current paper focuses on the issues of standard-setting for mining losses and ore dilution in the process of near-contact zone development. A method is suggested to estimate standard values of losses and ore dilution in stochastic zones. Authors have developed an algorithm of defining the shape of the contact. In the stochastic zone the contact can have a rectangular, sinusoidal, serrate and straight-line shapes. Research has established a relation between the contact shape and amounts of mining losses and ore dilution, formulas to calculate standard values are presented. Using suggested method, standard values for contact ore losses can be obtained in a quicker and more reliable way.

How to cite: Kurchin G.S., Vokhmin S.A., Kytmanov A.A. Impact of the shape of geological contact on mining losses in the process of near-contact zone development // Journal of Mining Institute. 2017. Vol. 223 . p. 37-43. DOI: 10.18454/PMI.2017.1.37
Geo-nanomaterials
  • Date submitted
    2015-08-13
  • Date accepted
    2015-10-29
  • Date published
    2016-04-22

Multicriteria estimation of bearing capacity of geomaterials

Article preview

In the article the problem of an estimation of bearing capacity of geomaterials as a deform-able solid is considered in the current configuration, which may be as the reference (undeformed) or the actual (deformed). We propose an original variational approach to the problem for stresses in selected subdomains, in which, depending on different engineering considerations, average in-tegral values of different component of stresses are estimated and from their aggregate the bearing capacity of the current configuration of the solid is estimated regarding to given external influ-ences. In each of the selected subdomain the weakest stress field is obtained which is globally bal-anced with external influences. For example, the assessment of the average integral hydrostatic pressure is needed for study of bearing capacity of geomaterials.

How to cite: Brigadnov I.A. Multicriteria estimation of bearing capacity of geomaterials // Journal of Mining Institute. 2016. Vol. 218 . p. 289-295.
Geoeconomics and Management
  • Date submitted
    2014-11-27
  • Date accepted
    2015-01-15
  • Date published
    2015-10-26

Socio-economic potential of large-scale projects to develop offshore oil and gas: risks and stakeholder expectations

Article preview

The development of the Arctic shelf is a strategic long-term objective of the energy development of the Russian Federation. At the present time, resource and economic potential of offshore oil and gas development projects is huge. However, it is constrained by the complexity of developing offshore oil and gas resources due to climatic, geological and technological conditions. In addition, the current unstable situation with world oil prices is also a constraint on largescale involvement in the industrial development of offshore oil and gas resources. The aim of the research is to determine socioeconomic potential of large-scale projects to develop oil fields in the Arctic shelf of Russia. The article presents the peculiarities of developing offshore fields, which are characterized by severe climatic conditions, high environmental risks, unique technological solutions, lack of infrastructure in coastal areas. A comparative analysis of projects to develop land and shelf is performed. The regional authorities’ and businesses capability of implementing large-scale projects to develop offshore fields on economic, social and environmental criteria is identified. The positive and negative effects of socio-economic development of the territory implementing projects of hydrocarbon field development are evaluated. A schematic diagram of the socio-economic potential of hydrocarbon resources development projects reflecting the opportunities and risks of such projects from the perspective of key stakeholders is developed. A set of strategic objectives to successfully implement projects in the Arctic shelf of Russia are proposed. The findings of the research can be used by the departments of energy, industry and mineral resources in the preparation of long-term strategic development programs for the oil and gas industry.

How to cite: Cherepovitsyn A.E. Socio-economic potential of large-scale projects to develop offshore oil and gas: risks and stakeholder expectations // Journal of Mining Institute. 2015. Vol. 215 . p. 140-149.
Development of solid mineral deposits
  • Date submitted
    2010-07-21
  • Date accepted
    2010-09-08
  • Date published
    2011-03-21

Calculation methodology of physical parameters of the artificial pillar barrier

Article preview

The article is devoted to the calculation methodology of physical parameters of the artificial barrier pillar needed when developing underquarry deposits of kimberlitic pipes in difficult hydrogeological conditions.

How to cite: Adreev M.N. Calculation methodology of physical parameters of the artificial pillar barrier // Journal of Mining Institute. 2011. Vol. 189 . p. 125-129.
Development of solid mineral deposits
  • Date submitted
    2010-07-15
  • Date accepted
    2010-09-26
  • Date published
    2011-03-21

Development of the stowing material and testing of its mechanical properties

Article preview

Article is in touch with analysis of backfill materials applied on diamond mines, description of research of its mechanical properties to create the optimal compound in conditions of Yakutian kimberlitic tubes.

How to cite: Andreev M.N., Boguslavskiy E.I. Development of the stowing material and testing of its mechanical properties // Journal of Mining Institute. 2011. Vol. 189 . p. 130-133.
Geomechanics, geodesy, mine surveying and cadastre
  • Date submitted
    2010-07-24
  • Date accepted
    2010-09-17
  • Date published
    2011-03-21

Features technology of modelling waste bank phosphite by results to laser-scanning survey

Article preview

Features of a technique of lazer – scanning survey of waste bank and processing of its re- sults are stated. The estimation of accuracy of survey is executed and the constructed three- dimensional model on which define geometrical parameters for an estimation of stability of highwall slope.

How to cite: Vasiliev M.Y. Features technology of modelling waste bank phosphite by results to laser-scanning survey // Journal of Mining Institute. 2011. Vol. 189 . p. 198-201.
Problems in geodynamic safety in the exploration of solid deposits
  • Date submitted
    2009-10-13
  • Date accepted
    2009-12-29
  • Date published
    2010-09-22

Assessment of the level of technological production of coal reserves in mine fields with intensive mining of fiat-lying coal seams

Article preview

The levels of technological production of coal reserves in the stoping faces have been determined depending on the main determining factors, such as suitability of conditions, their preparation and equipment of longwalls.

How to cite: Baranov S.G., Rozenbaum M.A. Assessment of the level of technological production of coal reserves in mine fields with intensive mining of fiat-lying coal seams // Journal of Mining Institute. 2010. Vol. 188 . p. 43-46.
Problems in geodynamic and ecological safety in the exploration of fields of oil and das, their storage and transporta
  • Date submitted
    2009-10-02
  • Date accepted
    2009-12-23
  • Date published
    2010-09-22

The problems of efficient use of the tumenian reservoirs at final stage of low-pressure gas production and prospects in their solutions

Article preview

The reserves depletion estimation is presented for main (base) fields in the north part of the Tumenian area. The significance of long time production of base fields is shown. The main problems of efficient use are shown for reservoirs at final stage of low-pressure gas field. The methodology associated with solving the problem is formulated for low profitability in low-pressure gas output. The recommendations for State support of subsurface users are prepared for efficient low-pressure gas production and efficient use of reserves at all.

How to cite: Bugriy O.E. The problems of efficient use of the tumenian reservoirs at final stage of low-pressure gas production and prospects in their solutions // Journal of Mining Institute. 2010. Vol. 188 . p. 214-217.
Applied and fundamental research in physics and mathematics
  • Date submitted
    2009-09-01
  • Date accepted
    2009-11-20
  • Date published
    2010-06-25

Mathematical models of technical state estimation of ship elements

Article preview

The methods of mathematical models estimation of ship elements technical state were worked out in this work. The latter were realized for different conditions of ship elements work.

How to cite: Nikolaenkov I.I., Gospodarikov A.P. Mathematical models of technical state estimation of ship elements // Journal of Mining Institute. 2010. Vol. 187 . p. 101-103.
Geodesy, geomechanics and underground construction
  • Date submitted
    2009-08-16
  • Date accepted
    2009-10-29
  • Date published
    2010-02-01

Definition of dependent cadastral value estimation indicators of urban land sections (on the example of Kostomuksha)

Article preview

The work is devoted to the analyze of the connection between indices of urban parcels cadastral value. By using several mail factors composite analyze of urban parcels was done. With the help of statistic methods distribution laws of indices were determined. As a result correlation coefficients were calculated and dependent indices were exposed. In the end of the research the main question was answered: is it right to use analyze of hierarchy method for calculating weights of the indices as it is done in the methods of urban area state cadastral valuation?

How to cite: Lepikhina O.Y. Definition of dependent cadastral value estimation indicators of urban land sections (on the example of Kostomuksha) // Journal of Mining Institute. 2010. Vol. 186 . p. 107-111.
Economics and management
  • Date submitted
    2009-08-28
  • Date accepted
    2009-10-22
  • Date published
    2010-02-01

Peculiarity of economic investment at gold ore deposit

Article preview

In clause dynamics investment development branch is studied. Methodical bases the analysis of the factors influencing acceptance investment decisions and algorithm of a complex estimation investment appeal of the enterprise are offered.

How to cite: Zhigulevich P.A. Peculiarity of economic investment at gold ore deposit // Journal of Mining Institute. 2010. Vol. 186 . p. 221-223.
Problems in conservation of resources? mine surveying and wise erth's interior utilization
  • Date submitted
    2009-07-29
  • Date accepted
    2009-09-29
  • Date published
    2010-04-22

State examination of mineral reserves in the system of wise utilization of the earth’s interior

Article preview

The major problem of bodies of the government in sphere of regulation of attitudes protection of reserves creation of conditions for rational use of resources. The basic role in its decision is played with examination protection of reserves. Maintenance of effective carrying out of examination demands its constant perfection with reference to market conditions with use of the international criteria regarding both calculation and an estimation of stocks, and drawing up design and the engineering specifications on development of mineral deposits.

How to cite: Podturkin Y.A. State examination of mineral reserves in the system of wise utilization of the earth’s interior // Journal of Mining Institute. 2010. Vol. 185 . p. 188-190.
Problems in conservation of resources? mine surveying and wise erth's interior utilization
  • Date submitted
    2009-07-03
  • Date accepted
    2009-09-10
  • Date published
    2010-04-22

Methods for calculation of methane reserves in coal seams as independent mineral resource

Article preview

Development of nonconventional resources of natural gas such as coalbed methane (CBM) demands new approaches to reserves’ calculation and economic estimation of coalbed methane fields. Experts of OS «Gazprom promgaz» have developed the method of CBM reserves calculation as independent mineral based on international and russian experience in CBM fields prospecting and production activity of CBM. The article is devoted to basic principles of new technique on an example of Taldinskoe CBM field reserves’ calculation.

How to cite: Storonskii N.M., Khryukin V.T., Shvachko E.V., Kirilchenko A.V., Mitronov D.V., Sizikov D.A. Methods for calculation of methane reserves in coal seams as independent mineral resource // Journal of Mining Institute. 2010. Vol. 185 . p. 199-204.
Problems in conservation of resources? mine surveying and wise erth's interior utilization
  • Date submitted
    2009-07-12
  • Date accepted
    2009-09-08
  • Date published
    2010-04-22

Account and movement of reserves in the information system of Silvinit co.

Article preview

At ore mines of the Silvinit Co. for accounting and movement of reserves are developed and used special tools, using GIS within the information system. Their use allows to automate accounting and monitoring of status and movement of stocks, including the formation of the reporting tables.

How to cite: Kataev A.V., Kutovoi S.N., Efimov E.M., Gilev M.V. Account and movement of reserves in the information system of Silvinit co. // Journal of Mining Institute. 2010. Vol. 185 . p. 279-284.
Problems in conservation of resources? mine surveying and wise erth's interior utilization
  • Date submitted
    2009-07-02
  • Date accepted
    2009-09-30
  • Date published
    2010-04-22

On mechanisms for improvement of mine surveying works

Article preview

The article considers the aspects concerned with the improvement of mine surveying under conditions of market relations. It is shown that the financing of the urgent problems in safe mining operations related to the utilization of the Earth's interior, is practically absent on the federal level. In this connection, the development of the federal programme «Safe Utilization of Mineral Resources and Conservation of Reserves» is a high-priority task, which should include also the aspects of geodynamic safety in mining.

How to cite: Gritskov V.V. On mechanisms for improvement of mine surveying works // Journal of Mining Institute. 2010. Vol. 185 . p. 209-211.