Submit an Article
Become a reviewer

Search articles for by keywords:
low-frequency electrical prospecting

Energy industry
  • Date submitted
    2024-06-12
  • Date accepted
    2024-07-18
  • Date published
    2025-04-25

Development of parameters for an industry-specific methodology for calculating the electric energy storage system for gas industry facilities

Article preview

The issue of determining the main parameters of electric energy storage systems – power and energy intensity – is being considered, the determination of which is a fundamentally important task when introducing such devices into the power supply systems of enterprises for both technical (technological) and economic reasons. The work analyzes problems that can be solved by installing electricity storage systems at gas industry facilities. An industry-wide methodology has been developed for calculating the parameters of an electricity storage system based on traditional methods and methods aimed at minimizing the standardized cost of electricity with adaptation to the conditions of the gas industry. A distinctive feature of the presented methodology is the ability to determine the power and energy intensity of electricity storage systems when performing several functions. The methodology was tested at a typical gas industry facility – the Yarynskaya compressor station of OOO Gazprom Transgaz Ukhta, a characteristic feature of which is an autonomous power supply system. An example is given of calculating the electricity storage normalized cost using an improved LCOS indicator, which takes into account the effect of changing the fill factor of the electrical load schedule on the amount of gas consumption by a power plant for its own needs. To confirm the economic efficiency of introducing electricity storage systems calculated using the above methodology, calculations of the integral effect, net present value and efficiency index are presented.

How to cite: Tokarev I.S. Development of parameters for an industry-specific methodology for calculating the electric energy storage system for gas industry facilities // Journal of Mining Institute. 2025. Vol. 272 . p. 171-180. EDN UIZSOQ
Energy industry
  • Date submitted
    2022-10-26
  • Date accepted
    2023-02-13
  • Date published
    2023-07-19

Determination of the grid impedance in power consumption modes with harmonics

Article preview

The paper investigates the harmonic impedance determination of the power supply system of a mining enterprise. This parameter is important when calculating modes with voltage distortions, since the determined parameters of harmonic currents and voltages significantly depend on its value, which allow the most accurate modeling of processes in the presence of distortions in voltage and current. The power supply system of subsurface mining is considered, which is characterized by a significant branching of the electrical network and the presence of powerful nonlinear loads leading to a decrease in the power quality at a production site. The modernization of the mining process, the integration of automated electrical drive systems, renewable energy sources, energy-saving technologies lead to an increase in the energy efficiency of production, but also to a decrease in the power quality, in particular, to an increase in the level of voltage harmonics. The problem of determining the grid harmonic impedance is solved in order to improve the quality of design and operation of power supply systems for mining enterprises, taking into account the peculiarities of their workload in the extraction of solid minerals by underground method. The paper considers the possibility of determining the grid impedance based on the measurement of non-characteristic harmonics generated by a special nonlinear load. A thyristor power controller based on phase regulation of the output voltage is considered as such a load. Simulation computer modeling and experimental studies on a laboratory test bench are used to confirm the proposed method. The recommendations for selecting load parameters and measuring device connection nodes have been developed.

How to cite: Skamyin A.N., Dobush V.S., Jopri M.H. Determination of the grid impedance in power consumption modes with harmonics // Journal of Mining Institute. 2023. Vol. 261 . p. 443-454. DOI: 10.31897/PMI.2023.25
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2022-03-17
  • Date accepted
    2022-10-04
  • Date published
    2022-11-10

Improving the reliability of 3D modelling of a landslide slope based on engineering geophysics data

Article preview

Landslides are among the most dangerous geological processes, posing a threat to all engineering structures. In order to assess the stability of slopes, complex engineering surveys are used, the results of which are necessary to perform computations of the stability of soil masses and assess the risks of landslide development. The results of integ-rated geological and geophysical studies of a typical landslide slope in the North-Western Caucasus spurs, composed of clayey soils, are presented. The purpose of the work is to increase the reliability of assessing the stability of a landslide mass by constructing a 3D model of the slope, including its main structural elements, identified using modern methods of engineering geophysics. Accounting for geophysical data in the formation of the computed 3D model of the slope made it possible to identify important structural elements of the landslide, which significantly affected the correct computation of its stability.

How to cite: Glazunov V.V., Burlutsky S.B., Shuvalova R.A., Zhdanov S.V. Improving the reliability of 3D modelling of a landslide slope based on engineering geophysics data // Journal of Mining Institute. 2022. Vol. 257 . p. 771-782. DOI: 10.31897/PMI.2022.86
Geology
  • Date submitted
    2022-05-04
  • Date accepted
    2022-06-15
  • Date published
    2022-07-26

Prospecting models of primary diamond deposits of the north of the East European Platform

Article preview

As a result of a comprehensive study of the geological structure and diamond presense of the northern part of the East European Platform, generalization of the data accumulated by various organizations in the USSR, the Russian Federation, and other states, three main prospecting models of primary diamond deposits have been identified and characterized: Karelian, Finnish, and Arkhangelsk. Geological, structural, mineralogical, and petrographic criteria of local prediction, as well as the features of the response of kimberlite and lamproite bodies in dispersion haloes and geophysical fields, are considered using known examples, including data on the developed M.V.Lomonosov and V.P.Grib mines. It is shown that the most complicated prospecting environments occur in the covered areas of the Russian Plate, where, in some cases, the primary diamond-bearing rocks are similar in their petrophysical properties to the host formations. The buried dispersion haloes of kimberlite minerals in the continental Carboniferous and Quaternary deposits are traced at a short distance from the sources. Differences in the prospecting features of magnesian (Lomonosov mine) and ferromagnesian (Grib mine) kimberlites are also shown. Conclusions about the diamond potential of the model objects of various types are given in this paper.

How to cite: Ustinov V.N., Mikoev I.I., Piven G.F. Prospecting models of primary diamond deposits of the north of the East European Platform // Journal of Mining Institute. 2022. Vol. 255 . p. 299-318. DOI: 10.31897/PMI.2022.49
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2021-02-20
  • Date accepted
    2021-10-18
  • Date published
    2021-12-16

Thermal protection implementation of the contact overheadline based on bay controllers of electric transport traction substations in the mining industry

Article preview

The article presents the principle of thermal protection of the contact overheadlineand substantiates the possibility of practical implementation of this principle for rail electric transport in the mining industry. The algorithm for the implementation of modern digital protection of the contact overhead line as one of the functions of the controller is described. A mathematical model of thermal protection is proposed, which follows from the solution of the heat balance equation. The model takes into account the coefficient of the electrical networktopology, as well as the coefficient of consumption of the current-carrying core of the cable, which determines the reduction in the conducting section from contact erosion and the growth of oxide films. Corrections for air flows are introduced when receiving data from an external anemometer, via telemechanics protocol. The mathematical model was tested by writing a real thermal protection program in the C programming language for the bay controller, based on the circuitry of which is the STM32F407IGT6 microcontroller for the microcontroller unit. Verification tests were carried out on a serial bay controller in 2020. The graphs for comparing the calculated and actual values of temperatures, with different flow rates of the current-carrying conductor of the DC cable, are given. To obtain data, telemechanics protocols IEC 60870-104 and Modbus TCP, PLC Segnetics SMH4 were used.

How to cite: Lantsev D.Y., Frolov V.Y., Zverev S.G., Uhrlandt D., Valenta J. Thermal protection implementation of the contact overheadline based on bay controllers of electric transport traction substations in the mining industry // Journal of Mining Institute. 2021. Vol. 251 . p. 738-744. DOI: 10.31897/PMI.2021.5.13
Geology
  • Date submitted
    2020-05-28
  • Date accepted
    2021-07-27
  • Date published
    2021-10-21

On the applicability of electromagnetic monitoring of hydraulic fracturing

Article preview

The purpose of this work is to assess the possibilities of using electromagnetic monitoring to study the development of a fracture system generated by hydraulic fracturing (HF) with a specified position of the controlled source. The option with the source (a vertical electric dipole) located in the interval of the oil-bearing formation and ground-based measurements was chosen as the most promising monitoring plan. We have built a geoelectric model equivalent to the system of hydraulic fractures, divided into 11 zones corresponding to HF stages. For the selected model, mathematical simulation was performed by solving the direct problem considering the impact of the steel casing, the presence of which reduced the effect. Despite this fact, no strong distortion of electromagnetic field anomaly was observed above the HF zone. Analysis of the simulation results at different HF stages showed that as new hydraulic fractures appeared and were filled with electrically conductive proppant, the total effect increased. The data on electric field anomaly demonstrated maximum deviation from the background level of more than 2 %. Provided that the studied formation is characterized by sufficient electrical conductivity, its magnetic field also becomes informative.

How to cite: Grigorev G.S., Salishchev M.V., Senchina N.P. On the applicability of electromagnetic monitoring of hydraulic fracturing // Journal of Mining Institute. 2021. Vol. 250 . p. 492-500. DOI: 10.31897/PMI.2021.4.2
Electromechanics and mechanical engineering
  • Date submitted
    2021-03-11
  • Date accepted
    2021-05-21
  • Date published
    2021-09-20

The influence of solar energy on the development of the mining industry in the Republic of Cuba

Article preview

Cuba is traditionally considered a country with an underdeveloped industry. The share of the mining and metallurgical industries in the gross industrial production of the republic is small – about 3 % of GDP. The development of deposits and the extraction of nickel ores is an important sector of the economy of the Republic of Cuba, since the largest reserves of nickel and cobalt on the North American continent are located on the territory of the country. The development of the country energy system can serve as a growth factor in this sector of the economy. Due to climatic features and impossibility of integrating new capacities into the energy system through the construction of hydroelectric power plants, solar energy is a promising direction. Determining the feasibility of using solar tracking systems to increase the generation of electricity from solar power plants is one of the main challenges faced by engineers and renewable energy specialists. Currently, there are no solar tracking systems in Cuba that can provide information to assess the effectiveness of this technology in the country. The lack of the necessary technologies, as well as the high cost of developing solar power plants with tracking systems, limit the widespread introduction of such complexes. Hence follows the task of creating an inexpensive experimental model that allows assessing the effectiveness of tracking systems in specific weather conditions of the Republic of Cuba. This model will allow in future to increase the efficiency of electrical complexes with solar power plants, which provide power supply to the objects of the mineral resource complex and other regions.

How to cite: Shklyarskiy Y.E., Guerra D.D., Iakovleva E.V., Rassõlkin A. The influence of solar energy on the development of the mining industry in the Republic of Cuba // Journal of Mining Institute. 2021. Vol. 249 . p. 427-440. DOI: 10.31897/PMI.2021.3.12
Mining
  • Date submitted
    2020-05-19
  • Date accepted
    2021-03-02
  • Date published
    2021-04-26

Results of Comprehensive Geophysical Studies on the Search for Crypts on the Territory of Suburban Necropolis of Tauric Chersonese in the Karantinnaya Balka

Article preview

The article presents the results of comprehensive studies carried out by the research team of Saint Petersburg Mining University in cooperation with the specialists from the State Museum-Preserve "Tauric Chersonese" in 2019. The purpose of the work was to discover and map antique and medieval crypts (ancient burial structures) on the territory of suburban necropolis of Tauric Chersonese in the Karantinnaya balka. The complex of geophysical methods included continuous ground penetrating radar sounding at two center frequencies of 350 and 500 MHz and contactless electrical tomography. To minimize spatial errors in the process of studies, topographic and geodetic works were carried out. For the first time wave electromagnetic effects were identified, which indicated the positions of hidden underground crypts. Geological factors were established that are favorable for cutting crypts in the layered thickness of Sarmatian limestones. The obtained results allowed to justify the feasibility of continuing geophysical works at the necropolis in order to study interior space of the discovered crypts and to determine the boundaries of archaeological heritage.

How to cite: Glazunov V.V., Ageev A.S., Gorelik G.D., Sarapulkina T.V. Results of Comprehensive Geophysical Studies on the Search for Crypts on the Territory of Suburban Necropolis of Tauric Chersonese in the Karantinnaya Balka // Journal of Mining Institute. 2021. Vol. 247 . p. 12-19. DOI: 10.31897/PMI.2021.1.2
Electromechanics and mechanical engineering
  • Date submitted
    2018-12-25
  • Date accepted
    2019-03-02
  • Date published
    2019-06-25

Non-linear electrical load location identification

Article preview

The article discusses the issues of identifying the location of non-linear loads in electrical networks which makes the main contribution to the distortion of the non-sinusoidal voltage and current in the distribution network of an industrial enterprise, including mining enterprises. The existing methods for determining the location of the source of higher harmonic components in voltage and current are considered, their advantages and disadvantages are revealed. The main disadvantages of the methods used include the low accuracy and incorrectness of their use in existing enterprises. When developing a new method, the authors were faced with the task of simplicity of its use in the conditions of industrial operation of electrical equipment and the absolute correctness of the results obtained. The proposed method of identifying the source of higher harmonics is based on the variation of the parameters of the power system, in particular, the change in resistance of power transformers taking into account their transformation ratio. It is shown that by varying the transformation ratio during regulation under load, the total coefficient of the harmonic components of the voltage changes. Based on the constructed dependencies, the variation of the derivative of this function with different variations of the parameters of sources of higher harmonics is analyzed and a method is developed that allows determining the share contribution of consumers to the total harmonic component of the voltage.

How to cite: Pirog S., Shklyarskiy Y.E., Skamyin A.N. Non-linear electrical load location identification // Journal of Mining Institute. 2019. Vol. 237 . p. 317-321. DOI: 10.31897/PMI.2019.3.317
Geology
  • Date submitted
    2017-09-17
  • Date accepted
    2017-11-06
  • Date published
    2018-02-22

Collaborative interpretation of the data obtained by resistivity and ground penetrating radar methods for assessing the permeability of sandy clay soils

Article preview

A method for estimating the filtration factor of sandy clay soils is considered on the basis of a joint interpretation of the data of a set of methods of engineering electrical exploration, including electrical resistivity tomography and ground penetrating radar studies. The solution of this problem is based on the use of known empirical connections between the imaginary and real parts of the complex dielectric permittivity, specific electrical resistance, and Q factor. An example of the effective joint use of the ground penetrating radar and non-contact electrical resistivity tomography shows how to obtain qualitative and quantitative estimates of a changing filtration factor in a draining road layer. It is necessary to use precise engineering geological information in order to provide the required estimates. The proposed approach makes it possible to describe continuous profiles of a pavement and underlying layers by ground penetrating radar and electrical resistivity tomography, as well as to assess soil properties when conducting an electrical survey from the surface of asphalt concrete pavement. Recommendations for the implementation of the developed methods of complex engineering and geophysical research are given for solving issues of repair work design, supervision, and quality control of road construction.

How to cite: Lalomov D.A., Glazunov V.V. Collaborative interpretation of the data obtained by resistivity and ground penetrating radar methods for assessing the permeability of sandy clay soils // Journal of Mining Institute. 2018. Vol. 229 . p. 3-12. DOI: 10.25515/PMI.2018.1.3
Geology
  • Date submitted
    2016-11-18
  • Date accepted
    2016-12-28
  • Date published
    2017-04-14

Frequency electromagnetic sounding with industrial power lines on Karelia-Kola geotraverse

Article preview

The paper describes theory, method and first experimental results of research on the interaction between electromagnetic waves of extremely low and ultra low frequency (0.1-200 Hz), the Earth crust and ionosphere in the field of two mutually orthogonal industrial power lines, 109 and 120 km long, in the course of FENICS experiment (Fennoscandian Electrical conductivity from Natural and Induction Control Source soundings). The main focus was on the observation results along the line of Karelia-Kola geotraverse over a distance of 700 km from the source. High horizontal homogeneity of geoelectrical lithosphere section has been detected in the eastern part of the Baltic shield at depth range from 10-15 to 50-70 km. Parameters of «regular» lithosphere section have been specified to the depth of 60-70 km. As a result of inverse problem solution for the western part of Karelia and Central Finland, a zone of decreased transverse resistivity has been detected at the depth of 50-60 km, corresponding to the area, detected by seismic methods, where Moho boundary reaches the same depth.

How to cite: Shevtsov A.N., Zhamaletdinov A.A., Kolobov V.V., Barannik M.B. Frequency electromagnetic sounding with industrial power lines on Karelia-Kola geotraverse // Journal of Mining Institute. 2017. Vol. 224 . p. 178-188. DOI: 10.18454/PMI.2017.2.178
Geology
  • Date submitted
    2016-10-30
  • Date accepted
    2017-01-02
  • Date published
    2017-04-14

Result of combining data from impulse electrical prospecting and aeromagnetic prospecting for groundwater exploration in the south of Yakutia

Article preview

In 2014 in the south of Yakutia in the course of groundwater exploration works a complex of geophysical methods was tested: aeromagnetic and electrical prospecting was carried out using near-field transient sounding and electromagnetic sounding with induced polarization. Prospective structures for hydrogeological drilling are zones of discontinuous tectonic faults. In order to identify them, data from aeromagnetic and electrical prospecting were used. Results of drilling confirmed the presence of watered areas; however, analysis of obtained information allowed to come to the conclusion that the amount of water in the faults has no direct connection to electrical conductivity.

How to cite: Davydenko A.Y., Aikasheva N.A., Bukhalov S.V., Davydenko Y.A. Result of combining data from impulse electrical prospecting and aeromagnetic prospecting for groundwater exploration in the south of Yakutia // Journal of Mining Institute. 2017. Vol. 224 . p. 156-162. DOI: 10.18454/PMI.2017.2.156
Geology
  • Date submitted
    2016-09-21
  • Date accepted
    2016-11-04
  • Date published
    2017-02-22

Combined 2D inversion of electrotomographic and audio-magnetotellurgic sounding data to solve mining problems

Article preview

Electrical methods of exploration are widely applied in prospecting and estimation of ore mineral resources. It is not always that geoelectrical models obtained in the course of interpretation of different types of electric and electromagnetic sounding are in line with each other. This leads to difficulties in geological interpretation of electrical exploration results. In single cases a geological model can be built that with great precision satisfies data from different electrical explorations, for instance, results of geometric and inductive electromagnetic soundings. For this purpose an algorithm of combined inversion of electrotomographic and audio-megnetotellurgic sounding data has been developed and implemented by A.E.Kaminskii in software ZondRes2D. Advantage of combined inversion has been shown for investigation of sections up till 400-500 m deep on synthetic models and actual field data.

How to cite: Kulikov V.A., Kaminskii A.E., Yakovlev A.G. Combined 2D inversion of electrotomographic and audio-magnetotellurgic sounding data to solve mining problems // Journal of Mining Institute. 2017. Vol. 223 . p. 9-19. DOI: 10.18454/PMI.2017.1.9
Electromechanics and mechanical engineering
  • Date submitted
    2015-08-23
  • Date accepted
    2015-10-26
  • Date published
    2016-04-22

Low-voltage electrical apparatus

Article preview

The article describes the main trends in the development of low-voltage electrical appliances and related accessories, as well as issues of efficiency, reliability and safety. According to the authors, the main trends in the development of low-voltage apparatus can be considered: the transition from the use of certain devices to the system devices, unified by the process of installation and running in standard modules and comply with all the functional requirements of control systems; improving the standardization and normalization of the EA on an international scale; unification of constructive elements of the EA; increase the volume of production of complete device management and contactless application logic control systems and specialized computers for management purposes; increase the proportion of contactor relay equipment DC, performs a variety of control functions. Improved security service low voltage, through the use of low voltage (24 V DC, 110 V AC), voltage presence signaling devices; increase the proportion of and the use of combined control and protection devices as well as devices for the automation of recruitment and duty cycles of machines: differentsequencer, track control devices, relays, pulse counting, and so on. n.

How to cite: Apollonskii S.M., Kuklev Y.V. Low-voltage electrical apparatus // Journal of Mining Institute. 2016. Vol. 218 . p. 251-260.
Geology
  • Date submitted
    2014-12-19
  • Date accepted
    2015-02-27
  • Date published
    2015-12-25

Geological and mathematical model of secondary sulphidisation zone polarizability as a function of oil and gas deposit depth

Article preview

The differential-normalized method of electrical exploration (DNME), by means of polarization study of the secondary sulphidation zone (depth ~ 0,4-0,6 km), allows making conclusion about existence and parameters of an oil and gas deposit (depth up to ~ 2-5 km). The approximate solution of the system of nonlinear differential equations in partial derivatives for concentration of sulfur-hydrogen and pyrite (polarizability) as the function of oil-gas deposit depth has been received. The results are confirmed by experimental investigations in the North Sea.

How to cite: Putikov O.F., Ivanov S.A. Geological and mathematical model of secondary sulphidisation zone polarizability as a function of oil and gas deposit depth // Journal of Mining Institute. 2015. Vol. 216 . p. 31-37.
Problems in geodynamic and ecological safety in the exploration of fields of oil and das, their storage and transporta
  • Date submitted
    2009-10-01
  • Date accepted
    2009-12-02
  • Date published
    2010-09-22

Typization of coalbed-methane deposits оf the kuznetsk basin by promising methane output with using different technologies of gas recovery intensification of coal seams

Article preview

Experts of «Gazprom promgaz» Co based on international experience of coalbed methane (CBM) mining have developed recommendations for expedient application of various methods of coalbed gas recovery intensification under different mining conditions. It will result in reduction of wells number and increase in methane extraction degree.

How to cite: Storonskii N.M., Khryukin V.T., Shvachko E.V., Vasilev A.N., Kirilchenko A.V., Malinina N.S., Mitronov D.V. Typization of coalbed-methane deposits оf the kuznetsk basin by promising methane output with using different technologies of gas recovery intensification of coal seams // Journal of Mining Institute. 2010. Vol. 188 . p. 138-144.
Applied and fundamental research in physics and mathematics
  • Date submitted
    2009-09-17
  • Date accepted
    2009-11-21
  • Date published
    2010-06-25

The wave motions caused by oscillations of a flat wall

Article preview

The research is devoted construction analytical, in particular, exact solution of a problem on movement of the electrically conducting ideal rotating liquid modeling wave movements in a liquid kernel of the Earth. Namely, the problem about radiation of waves in rotating incompressible electrically conducting liquid by the flat wall making, since the initial moment, harmonious fluctuations is considered. Such statement of a problem can serve as the first step to research of influence of heterogeneity of the liquid environment on generation and maintenance of a magnetic field of the Earth.

How to cite: Peregudin S.I., Kholodova S.E. The wave motions caused by oscillations of a flat wall // Journal of Mining Institute. 2010. Vol. 187 . p. 113-116.
Geotechnical engineering, powerengineering and automation
  • Date submitted
    2009-08-05
  • Date accepted
    2009-10-07
  • Date published
    2010-02-01

Electrical supply of power installations of oil extracting from independent power stations

Article preview

In article the imitating model of the closed system of an independent electrical supply with the energy carrier in the form of passing oil gas, with which help probably is presented: to establish parities of capacities of microturbine installation and погружного the electric motor for system work in a nominal mode; to eliminate the higher harmonious components of a current and pressure for maintenance with the electric power of the remote areas of the oil extracting satisfying with GOST 13109-97.

How to cite: Turysheva A.V. Electrical supply of power installations of oil extracting from independent power stations // Journal of Mining Institute. 2010. Vol. 186 . p. 156-160.
Problems in conservation of resources? mine surveying and wise erth's interior utilization
  • Date submitted
    2009-07-03
  • Date accepted
    2009-09-10
  • Date published
    2010-04-22

Methods for calculation of methane reserves in coal seams as independent mineral resource

Article preview

Development of nonconventional resources of natural gas such as coalbed methane (CBM) demands new approaches to reserves’ calculation and economic estimation of coalbed methane fields. Experts of OS «Gazprom promgaz» have developed the method of CBM reserves calculation as independent mineral based on international and russian experience in CBM fields prospecting and production activity of CBM. The article is devoted to basic principles of new technique on an example of Taldinskoe CBM field reserves’ calculation.

How to cite: Storonskii N.M., Khryukin V.T., Shvachko E.V., Kirilchenko A.V., Mitronov D.V., Sizikov D.A. Methods for calculation of methane reserves in coal seams as independent mineral resource // Journal of Mining Institute. 2010. Vol. 185 . p. 199-204.
Problems in conservation of resources? mine surveying and wise erth's interior utilization
  • Date submitted
    2009-07-28
  • Date accepted
    2009-09-14
  • Date published
    2010-04-22

The use of computer technologies аt the stages of prospecting, mining and conservation of mineral deposits

Article preview

The article described the methods for the use of specialized application of software on the stages of exploration, design, planning and maintenance of mining operations and also in abandonment or conservation of mineral resources deposits.

How to cite: Morozov K.V., Lukichev S.V. The use of computer technologies аt the stages of prospecting, mining and conservation of mineral deposits // Journal of Mining Institute. 2010. Vol. 185 . p. 267-273.
Mineral raw materials complex: problems in control under new economical conditions
  • Date submitted
    2008-11-02
  • Date accepted
    2009-01-17
  • Date published
    2009-12-11

Problems of development of the diamond complex on company «ALROS»

Article preview

Diamond complex – one of the economy sectors, the kept potential of the expanded reproduction in the conditions of crisis. Russia, along with the republic of South Africa, Australia, Zaire, Botswana, Angola and Namibia is included into number of seven largest diamond-mining countries of the world and takes the second place in the world on volume of extraction of diamonds, being the world leader on stocks of diamond raw materials. Reserves of increase of efficiency at the separate enterprises and branch as a whole are revealed. Problems of strengthening of position of object of research on internal and a foreign market are defined.

How to cite: Vasiltsova V.M., Belov A.K. Problems of development of the diamond complex on company «ALROS» // Journal of Mining Institute. 2009. Vol. 184 . p. 13-17.
Economical aspects in the developments оf fuel & energy complex
  • Date submitted
    2008-11-01
  • Date accepted
    2009-01-22
  • Date published
    2009-12-11

Rate setting of electrical equipment reserve stocks on the enterprises of the gas main transport

Article preview

Minimization of economic losses from downtime of equipment and, first of all, off-schedule (breakdowns, accidents) is an actual problem whose solution can be achieved by the development and creation of a reserve stocks (irreducible level) materials and spare parts of electrical equipment. As a result of the study and comparative analysis of different methods for determining the amount of the reserve stocks has been concluded that these approaches are not fully reflect the real needs of the enterprise. In this regard, has developed an optimal method for determining the amount of irreducible level of reserve stocks of electrical equipment, taking into account the rational order of delivery of equipment, spare parts.

How to cite: Vazhenina L.V. Rate setting of electrical equipment reserve stocks on the enterprises of the gas main transport // Journal of Mining Institute. 2009. Vol. 184 . p. 121-124.
Economical aspects in the developments оf fuel & energy complex
  • Date submitted
    2008-11-11
  • Date accepted
    2009-01-08
  • Date published
    2009-12-11

Development of an economic-organizing mechanism of mineral resourсe base renewal in Russia's oil industry

Article preview

In paper there has been developed an economic-organizing mechanism of mineral resource base renewal of Russia's oil industry using financial and tax instruments and licensing system of soil use. The proposed mechanism is targeted on perfecting of soil use managing system, attracting investments into geological exploration branch, stimulating innovation constituent in exploration and extraction of oil, rational use of mineral resource base in oil industry.

How to cite: Pashkevich N.V., Nikolaychuk L.A. Development of an economic-organizing mechanism of mineral resourсe base renewal in Russia’s oil industry // Journal of Mining Institute. 2009. Vol. 184 . p. 160-166.
Geology, search and prospecting of mineral deposits
  • Date submitted
    2008-10-24
  • Date accepted
    2008-12-01
  • Date published
    2009-12-11

History and prospects for the development of the karelian isthmus facing stone mineral base

Article preview

The prerequisites for the development of the deposits, the previous studies and the current state of Karelian Isthmus facing stone sources as well as their comparison with those of other regions of Northwestern Federal Districts of Russia are considered. The objects for top-priority geological prospecting are determined.

How to cite: Tutakova A.Y. History and prospects for the development of the karelian isthmus facing stone mineral base // Journal of Mining Institute. 2009. Vol. 183 . p. 144-148.
Geophysics
  • Date submitted
    2008-10-01
  • Date accepted
    2008-12-15
  • Date published
    2009-12-11

Possibilities for localization of zones of hydrocarbon accumulation by application of АМТ-data component analysis

Article preview

Principal component method was used for qualitative interpretation of a matrix of magnetotelluric parameters. Localization of hydrocarbon congregation was the purpose of the investigations. Model of subvertical diffusion of hydrocarbon from reservoir was used as physical basis of oil and gas prospecting. The hydrocarbon роо l generates continuous spatial halation of hydrocarbon above the reservoir. Due to reducing reactions in the area the volumetric pyritization of rocks took place.

How to cite: Lozovoi A.L., Grechisheva D.V., Prikhodchenko V.F., Ingerov A.I. Possibilities for localization of zones of hydrocarbon accumulation by application of АМТ-data component analysis // Journal of Mining Institute. 2009. Vol. 183 . p. 255-259.