-
Date submitted2024-09-06
-
Date accepted2025-01-28
-
Date published2025-03-27
Results of aeromagnetic survey using unmanned aerial system at the Bunger Hills and Highjump Archipelago, Wilkes Land, East Antarctica
The paper focuses on the technique and results of an aeromagnetic survey conducted using a fixed-wing unmanned aerial system (UAS) in East Antarctica at the Bunger Hills and Highjump Archipelago (Wilkes Land) during the 69th Russian Antarctic Expedition. The above survey was carried out at a 250-meter distance between flight lines (scale 1:25,000) over the area of 600 km2 to increase the geological knowledge of the area. The magnetic anomaly map obtained after data processing is more detailed than any of known published geological maps of the area. The size of anomalies detected varies from dozens of meters up to large, kilometer-scale structures traced within the entire area under survey. The data analysis shows that the surveyed region is characterized by morphological heterogeneity and amplitude variability of anomalous magnetic field. Along with relatively calm zones one can observe strong gradient ones. Even the fluent analysis of aeromagnetic survey results proves their high information content. The UAS-based survey results demonstrate that the technique implemented is an important tool of applied geophysics and can effectively solve tasks of geological mapping in harsh weather conditions of Antarctica. It can adequately replace conventional aeromagnetic surveys that are now done using manned aircraft.
-
Date submitted2021-10-27
-
Date accepted2023-06-20
-
Date published2023-12-25
Geomechanical analysis of the impact of the new tunnels construction in the vicinity of existing underground subway structures on the state of the soil massif
The specificity of the behavior of the soil massif near the tunnel under construction in difficult mining conditions is considered. It was revealed through the joint interpretation of the results of geophysical measurements in the tunnel and computer simulation. The results of field geophysical studies to identify areas of decompacted soil behind the lining in two existing tunnels during successive drilling of two new tunnels under them are described. A method to analyze the response of the lining to impact was used providing for the calculation of its energy. It has been established that the decompaction zones are mainly located in the lateral lower areas of the tunnel. To substantiate the mechanism of formation of cavities, computer simulations were carried out using the finite element method with the COMSOL Multiphysics software. The finite element model is built on the Drucker – Prager criterion in the variant of a two-dimensional problem statement. It is shown that at the initial position of two old tunnels, the areas of decompaction can develop mainly on the sides. The position of the zones changes significantly when excavating two new tunnels. Soil decompaction zones appear between the tunnels and there is a tendency for the areas to spread to the upper point of the tunnel. According to geophysical data time delays in the impact of new tunnels on the existing line are noted, as well as a decrease in the size of decompacted soil areas over time. There is a satisfactory agreement between the positions of the decompaction areas and voids obtained by the geophysical method and the results of numerical simulation.
-
Date submitted2023-04-14
-
Date accepted2023-08-02
-
Date published2023-08-28
A method of determining the errors of segmented GRID models of open-pit mines constructed with the results of unmanned aerial photogrammetric survey
The methodology of building a digital elevation model based on the results of aerial photogrammetric survey from an unmanned aircraft is proposed, which is based on the division of the initial point cloud into equal segments. This allows, having made an assumption of the linear character of change of height of points in a separate segment, to approximate them by separate planes. RMS errors of the models from the survey data were calculated according to the scattering of the points in relation to the approximating surfaces, which made it possible to reveal the dependence of the model construction error relative to the sizes of their constituent segments, as well as to propose a method for filtering the cells containing outliers with respect to the expected model error. The proposed method was tested on the models of three mining objects – limestone quarry, phosphogypsum dump, and peat cut. The experimental results showed a multiple reduction in model error compared to standard DEM models providing the required accuracy for mining documentation.
-
Date submitted2022-10-29
-
Date accepted2023-02-13
-
Date published2023-04-25
The use of unmanned aerial photography for interpreting the technogenic transformation of the natural environment during the oilfield operation
The traditional approach to monitoring observations of the technogenic processes development in oilfields, which consists in determining the concentration of marker pollutants in various natural environments, does not provide the necessary completeness of information and the efficiency of its receipt. The paper considers an example of expanding the range of observations due to unmanned aerial photography and a number of other methods. Interpretation signs (for panchromatic survey) were determined that register such consequences of technogenic transformation of the natural environment as mechanogenesis, bitumization, and halogenesis. Technogenic mechanogenesis is understood as a physical violation of the integrity of ecosystems, the movement of soils and grounds. Bitumization is expressed in the migration of petroleum hydrocarbons through soils, ground, surface, subsurface, and underground waters, and their destruction. Salt migration in these media is defined as halogenesis. The most reliable indicators are linearly elongated areas of dead forests, dark red spots in drying microdepressions and reservoirs. It was found out that the oilfield impact on the raised bog leads to anthropogenic eutrophication, the introduction of plant species, uncharacteristic coenotic groups, the replacement of subshrubs with grasses, and morphometric changes in forest pine. In the peat deposits of the disturbed area, an unusual interlayer of whitish, undecomposed moss was recorded. The moment of the beginning of a pronounced technogenic transformation was registered in the course of work with the archive of multispectral space images. Continuous remote sensing with the help of unmanned aerial photography and interpretation by sedimentological, geobotanical methods significantly expand the possibilities of studying the technogenic transformation of the natural environment. To ensure environmental safety, it is advisable to develop remote methods and technologies to include them in the environmental monitoring system.
-
Date submitted2022-01-21
-
Date accepted2022-11-14
-
Date published2023-08-28
Strategy of mine ventilation control in optimal mode using fuzzy logic controllers
- Authors:
- Aleksei V. Kashnikov
- Yuri V. Kruglov
The issues related to improving the efficiency of automatic ventilation control systems of mines that regulate the air supply to the mine in accordance with the need are considered. During the tests of such a system in the 3RU mine of OAO Belaruskali, the shortcomings of its existing, implementation, associated with the incorrect choice of the most difficult-to-ventilate direction, were revealed. The possibilities of implementing a control strategy, in which the system automatically determines the optimal configuration of the operating modes of fans and regulators, are demonstrated. As an alternative to the implemented algorithms, it is proposed to use a fuzzy control device to account for the nonlinearity of the dependence of the input and output parameters of ventilation equipment and to set the conditions for the optimal operating mode of the system in a declarative form. To assess the effectiveness of the proposed approach, the data of simulation modeling of the current ventilation mode and the transition from one ventilation mode to another are analyzed with comparison with the actual data of the system operation. The simulation results show that the use of an upgraded control scheme for the main ventilation fan based on fuzzy logic in the implementation of automatic ventilation control systems makes it possible to eliminate the possibility of a shortage of fresh air in the regulated directions of its movement, as well as excessive power consumption of the main ventilation fan.
-
Date submitted2021-10-31
-
Date accepted2022-04-26
-
Date published2022-07-13
Identification of structural control factors of primary gold ore occurrences by method of unmanned aeromagnetic survey by the example of the Neryungrisky district of Yakutia
The long-term development of the geophysical industry, in which the methods of magnetometry are in maximum demand, as the simplest in instrumental and methodological execution, has determined the development of remote measurement methods implemented both from space and airborne carriers. The necessity to use the latter as an obligatory component of field surveys, providing coverage of significant areas, determines the need for using the unmanned low-tonnage carriers. Their use is implemented to search for predictive elements of structural (spatial, genetic) control of endogenous gold ore occurrences that allow predictive constructions, i.e., solving the problem of increasing gold reserves, which is being performed within the framework of federal programs. The purpose of the survey is to develop a system of instrumental and subsequent interpretation approaches in the organization of unmanned magnetometer survey, implemented for structural and geological mapping by the example of the Neryungrinsky district of Yakutia. Within the framework of the digital model formation of the relief and the anomalous magnetic field, a survey method using an unmanned aircraft, its technical characteristics are considered; the analysis and the author's modification of the office analysis of magnetometry data are performed. Based on the obtained materials, a physical and geological model of the investigated area was created, which is presented in the form of a geological and structural cut, accompanied by the physical characteristics of the structural and material complexes. The refinement of the physical and geological model was implemented by a joint morphostructural analysis of the remote base and the anomalous magnetic field using the results of quantative interpretation of the anomalous magnetic field. The result of the study is presented by an updated geological basis with the allocation of promising ore sites for their detailing as part of the planned large-scale geological and geophysical surveys. The scientific novelty of the work consists in the synthesis of the tried and tested methods of unmanned aeromagnetometric measurements and geostructural reconstructions, which allow the processing of both potential and non-potential geofields.
-
Date submitted2021-07-19
-
Date accepted2022-05-31
-
Date published2022-07-13
Study of a set of factors influencing the error of surveying mine facilities using a geodesic quadcopter
The factors influencing the qualitative and quantitative components of the result of surveying in open-pit mining using a quadcopter were identified and systematized, and the mathematical dependence of the influence of factors on the final error of surveying was determined. After a large number of field observations – numerous flights of a geodesic quadcopter over mining facilities – the subsequent mathematical justification of the results of the aerial photogrammetric surveying was made, which allowed to analyze the degree of participation in the final accuracy of the survey of each of the considered factors. The results of this study demonstrate the source of errors, which provide the surveyor with the opportunity to efficiently and competently carry out pre-flight preparation and planning of fieldwork. The study and subsequent consideration of the factors affecting the accuracy of surveying with the use of an unmanned aerial vehicle are the basis for the subsequent development and formation of a methodology for using a geodesic quadcopter in the conditions of open-pit mining.
-
Date submitted2021-10-08
-
Date accepted2022-01-24
-
Date published2022-04-29
Methodology for thermal desorption treatment of local soil pollution by oil products at the facilities of the mineral resource industry
- Authors:
- Mariya A. Pashkevich
- Marina V. Bykova
The analysis of the main environmental consequences of leaks and local spills of petroleum products at the enterprises of the mineral resource complex is presented. It is established that the problem of soil contamination with petroleum products at the facilities of the mineral resource complex and enterprises of other industries is caused by significant volumes of consumption of the main types of oil products. Based on the results of the author's previous field research, a series of experiments was carried out, consisting in modeling artificial soil pollution with petroleum products such as gasoline, diesel fuel, highly refined oil, motor oil, and transmission oil, followed by their purification by heat treatment at temperatures of 150, 200, and 250 °C. The 250 °C limit of the heating temperature was set due to the need to partially preserve the structure and quality of the soil after heat treatment to preserve its fertility. When the processing temperature rises to 450 °C, all humates are completely burned out and, as a result, productivity is lost. Confirmation is provided by the results of experiments to determine the humus content in uncontaminated soil and soil treated at different temperatures. It was found that at a maximum processing temperature of 250 °C, about 50 % of the initial organic carbon content is preserved. According to the results of the conducted experimental studies, the dependences of the required processing temperature on the concentration of petroleum products to reduce the concentration of petroleum products to an acceptable level have been established. The methodology of thermal desorption cleaning of soils with varying degrees of contamination at enterprises of the mineral resource complex is presented.
-
Date submitted2021-04-11
-
Date accepted2021-10-18
-
Date published2021-12-16
Comprehensive assessment and analysis of the oil and gas potential of Meso-Cenozoic sediments in the North Caucasus
- Authors:
- Igor I. Bosikov
- Andrey V. Мaier
At the present stage, the development of the oil and gas industry in the Russian Federation is impossible without replenishing the raw material base, so the urgent task is to conduct investigations, prospecting and evaluation of oil and gas bearing capacity prospects in undiscovered areas. The purpose of the investigations is to analyze facies and thicknesses, choose the methodology of prospecting and exploration in reservoirs, make a comprehensive assessment of oil and gas bearing capacity prospects based on experimental investigations and construct a map of oil and gas bearing capacity prospects of the studied sediment structure. The methodology of the conducted investigations was to identify and trace zones of increased fracturing by qualitative interpretation of time seismic sections. Methods for qualitative interpretation of time seismic sections, the model of physical, chemical and geochemical criteria developed by I.A.Burlakov, gas and geochemical surveying and correlation analysis were used in the investigations. A number of prospecting criteria, established based on the analysis of reference seismic materials on well-studied areas in comparison with the results of well tests, were also used. Structural plan for forecast prospects of oil and gas bearing capacity in the studied area was made; zonal and local objects with prospects for oil and gas were identified. Graphical plotting of Eh and pH concentrations distribution and various gas and geochemical indicators allowed identifying zones of possible oil and gas accumulations and starting their detailed survey. Processing of gas and geochemical materials by means of software allowed efficient assessment of prospects for oil and gas bearing capacity of the investigated objects.
-
Date submitted2021-06-24
-
Date accepted2021-10-18
-
Date published2021-12-16
Modeling the acid treatment of a polymictic reservoir
- Authors:
- Mars M. Khasanov
- Andrey А. Maltcev
Acid treatment of wells program is directly related to oil production efficiency. Investigations aimed at improving the efficiency of acid treatment in a terrigenous reservoir have mainly reviewed the changing and adapting the reagents to minimize bridging caused by acid-rock interaction. Under real conditions, application of new and unique acid compositions is a complex process from an organizational point of view and is therefore not widely used as compared with conventional compositions based on a mixture of hydrochloric and hydrofluoric acids. The paper is based on an approach to improve acid treatment efficiency through optimal design based on near-bottomhole zone treatment simulation. The aspects for practical application of the developed acid treatment simulator for terrigenous reservoirs based on a numerical model of hydrodynamic, physical and chemical processes in a porous medium on an unstructured PEBI-grid are described. The basic uncertainties of the model are identified and analyzed. Influence of empirical parameters within the system of equations on the calculation results and modeling of the mineralogical composition of rocks are considered. Algorithm for static modelling of near-bottomhole zone for acid treatment modelling is described, as well as an approach to optimizing the design of near-bottomhole zone treatment based on adapting the results of rock tests in the model. Using experimental data, the necessity of accounting for influence of secondary and tertiary reactions on the results of modeling physical and chemical processes during acid treatment of terrigenous reservoirs was proved. The distinctive features of West Siberian objects (polymictic reservoirs) with respect to the efficiency of near-bottomhole zone treatment with clay acid have been investigated. Series of calculations to determine the optimum volume of acid injection has been carried out. Experience of previously conducted measures under the considered conditions has been analyzed and recommendations to improve the efficiency of acid treatment have been given.
-
Date submitted2021-03-16
-
Date accepted2021-07-27
-
Date published2021-10-21
Allocation of a deep-lying brine aquifer in the rocks of a chemogenic section based on the data of geophysical well logging and 2D seismic exploration
Advancement in the production of potassium fertilizers is an important strategic task of Russian agricultural industry. Given annually growing production rates, the reserves of discovered potassium-magnesium salt deposits are noticeably decreasing, which creates the need to ensure stable replenishment of the resource base through both the discovery of new deposits and the exploitation of deep-lying production horizons of the deposits that are already under development. In most cases, deposits of potassium-magnesium salts are developed by underground mining. The main problem for any salt deposit is water. Dry salt workings do not require any additional reinforcement and can easily withstand rock pressure, but with an inflow of water they begin to collapse intensively – hence, special attention is paid to mine waterproofing. Determination of spatial location, physical and mechanical properties of the aquifer and water-blocking stratum in the geological section represent an important stage in the exploration of a salt deposit. The results of these studies allow to validate an optimal system of deposit development that will minimize environmental and economic risks. On the territory of Russia, there is a deposit of potassium-magnesium salts with a unique geological structure – its production horizon lies at a considerable depth and is capped by a regional aquifer, which imposes significant limitations on the development process. To estimate parameters of the studied object, we analyzed the data from CDP seismic reflection survey and a suite of methods of radioactive and acoustic well logging, supplemented with high-frequency induction logging isoparametric sounding (VIKIZ) data. As a result of performed analysis, we identified location of the water-bearing stratum, estimated average thickness of the aquifers and possible water-blocking strata. Based on research results, we proposed methods for increasing operational reliability of the main shaft in the designed mine that will minimize the risks of water breakthrough into the mine shaft.
-
Date submitted2020-05-12
-
Date accepted2020-09-22
-
Date published2020-11-24
Design features of coal mines ventilation using a room-and-pillar development system
- Authors:
- Sergey S. Kobylkin
- Alexander R. Kharisov
The safety of mining operations in coal mines for aerological factors depends on the quality of accepted and implemented ventilation design solutions. The current “Design Manual of coal mine ventilation” do not take into account the features of room-and-pillar development systems used in Russia. This increases the risk of explosions, fires, and gassing. The detailed study of foreign experience in designing ventilation for the considered development systems e of coal deposits allowed to formulate recommendations on the ventilation scheme organization for coal mines using a room-and-pillar development system and the procedure for ventilation during multi-entry gateroad development. Observations have shown that the use of the existing Russian procedure for airing mining sites with a room-and-pillar development system complicates the emergency rescue operations conduct. Low speeds and multidirectional air movement, difficult heat outflow, and the abandonment of coal pillars increase the risk of occurrence and late detection of endogenous fire. The results of numerical modeling have shown that the installation (parallel to the drifts) of ventilation structures in inter-chamber pillars will increase the reliability of ventilation by transferring the ventilation scheme from a complex diagonal to a complex parallel. It will also reduce the amount of air required for the mine site and the total aerodynamic drag. The research made it possible to formulate requirements for the design procedure for coal mines ventilation using a room-and-pillar development system, which consist in the order of working out blocks in the panel, and also the additional use of ventilation structures (light brattice clothes or blowing line brattice).
-
Date submitted2019-12-20
-
Date accepted2020-09-01
-
Date published2020-10-08
Features of the underground storages construction in depleted oil and gas condensate fields
The paper considers the features of the underground storages (US) construction in depleted oil and gas condensate fields (DOGCFs). The requirements for the structure of the formation, corresponding to the parameters of the object for possible US creation are presented. The influence of geological, hydrogeological, mining and technical rock formation conditions on the reliability and tightness of underground storages, including underground gas storages, has been evaluated. The necessary conditions for the US design are analyzed at the example of the Ach-Su oil and gas condensate field, in the presence of a well-explored trap with acceptable parameters for the construction of an underground storage. An important aspect is the geological conditions that meet the criteria for selecting the object: the required structure, the absence of fracturing faults, high reservoir properties of the formation, a sufficient volume of the deposit for the storage. Geological conditions lay the basis for determining the individual characteristics of the US construction technology at each DOGCF. The refined results for the current gas-saturated pore volume and the rate of pressure drop in the formation are presented, which makes it possible to select improved technological indicators in the course of operation of the created US. In order to select the optimal option for the design and construction of the US, the results of economic and geological scenarios analysis were studied concurrently with the capabilities of the technological operation of the object and transport system, which can ensure the maximum daily production of the storage.
-
Date submitted2018-11-03
-
Date accepted2019-01-21
-
Date published2019-04-23
Estimation of critical depth of deposits by rock bump hazard condition
- Authors:
- V. N. Tyupin
During the development of minerals by the underground method, dynamic manifestations of rock pressure occur at a certain depth, which significantly reduces the safety of mining operations. Regulatory documents prescribe at the exploration and design stages to establish the critical depth for classifying a deposit as liable to rock bumps. Currently, there are a number, mainly instrumental, methods for determining the liability of rock mass to rock bumps and methods based on the determination of physical and technical properties and the stress-strain state of rock massifs. The paper proposes a theoretical method for determining the critical depth for classifying a deposit as liable to rock bumps. A formula for determining the critical depth of the rock bump hazard condition is obtained. A mathematical analysis of the influence of the physical and technical parameters of the formula on the critical depth is carried out. Its physical and mathematical validity is substantiated. The numerical calculations of the critical depth for 17 developed fields were carried out using a simplified formula. It also provides a comparison of calculated and actual critical depth values. It is established that the variation of the actual and calculated critical depth is due to the lack of actual data on the value of the friction coefficient and parameters of fracturing of the rock mass in the simplified formula. A simplified calculation formula can be used to estimate the critical depth of a field at the survey and design stages. More accurate results can be obtained if there are actual data on fracture parameters, friction coefficients and stress concentration near the working areas.
-
Date submitted2018-01-15
-
Date accepted2018-03-24
-
Date published2018-06-22
Designing of well trajectory for efficient drilling by rotary controlled systems
- Authors:
- M. V. Dvoinikov
The main directions of increasing the efficiency of drilling wells by improving methods for designing profiles of directional and horizontal wells are identified. The feasibility and necessity of using at drilling with rotary controlled systems the trajectories of directed wells' profiles with continuous curving, that do not contain conjugated sections, on the basis of plane transcendental curves are theoretically substantiated and experimentally confirmed. An algorithm and software are developed that allow optimal selection of a profile or a trajectory section, taking into account minimization of twisting, bending, compressive and tensile stresses that ensure the efficiency of technical and technological parameters of well drilling.
-
Date submitted2016-11-16
-
Date accepted2017-01-01
-
Date published2017-04-14
Complex use of heat-exchange tunnels
- Authors:
- A. F. Galkin
The paper presents separate results of complex research (experimental and theoretical) on the application of heat-exchange tunnels – in frozen rocks, among other things – as underground constructions serving two purposes. It is proposed to use heat-exchange tunnels as a separate multi-functional module, which under normal conditions will be used to set standards of heat regime parameters in the mines, and in emergency situations, natural or man-made, will serve as a protective structure to shelter mine workers. Heat-exchange modules can be made from mined-out or specially constructed tunnels. Economic analysis shows that the use of such multi-functional modules does not increase operation and maintenance costs, but enhances safety of mining operations and reliability in case of emergency situations. There are numerous theoretic and experimental investigations in the field of complex use of mining tunnels, which allows to develop regulatory design documents on their basis. Experience of practical application of heat-exchange tunnels has been assessed from the position of regulating heat regime in the mines.
-
Date submitted2014-12-10
-
Date accepted2015-02-20
-
Date published2015-12-25
Opencast mine parameters sensitivity analysis at preliminary study of a mining project
- Authors:
- S. I. Fomin
- E. I. Bazarova
The article describes sensitivity analysis, aimed at variables dependence detection: to what extent open cast mine ultimate efficiency or performance will be affected when one of the key input variables is changed. The stronger the dependence effect, the higher the project implementation risk. The sensitivity analysis objective is demonstrated – principle factors identification – critical variables, capable of having a serious influence on the project implementation results, and impact verification of progressive (single) factorial changes. Sensitivity analysis in its content is a single-factor analysis. Output, as a basic performance indicator of an open cast mine, characterizes mine development intensity and is determined by mining-engineering and economic factors. It is proved that the impact degree from various parameters on the open cast mine output is characterized by elasticity ratio. The project indicators sensitivity analysis, which was carried out, allowed to establish the impact degree that various parameters have on the open cast mine output, which takes place in a high-angle ore deposit, characterized by elasticity ratio.
-
Date submitted2014-11-01
-
Date accepted2015-01-18
-
Date published2015-10-26
On the design features of underground multiple gassy coal seam mining
- Authors:
- O. I. Kazanin
The analysis of the industry regulatory requirements and the world design experience of underground multiple coal seam mining is provided. The main problems of intensive longwall mining of multiple flat gassy coal seams as well as methods for determination of high rock pressure zone parameters and seams interaction are considered. The examples of a number of mines in the Kuzbass and Pechora coal basins show that the design of multiple seam mining and the choice of longwall panel parameters were often made without taking into consideration influence of surrounded seams that leads to essential complication of conditions for mining operations and decreases the technical and economic indicators of mining. The existing industry regulations do not allow considering complex influence of factors in multiple coal seams mining fully. On the basis of field, laboratory, and numeric research results it is noted that recommendations for pillar positioning in contiguous seams ensuring efficiency and safety of multiple seam longwall mining can significantly differ in case of liability of coal seams to spontaneous combustion, high natural gas content, influence of multiple seam mining onto daily surface, and difficult conditions of entries maintenance. The importance of having information on the stress-strain condition of the rock mass at a design stage and its changes in the process of multiple seam mining is shown. The need for industry regulations updating for the purpose of a more detailed definition of a form, size and a location of high rock pressure zones as well as stress parameters in these zones is noted. A set of recommendations for effective and safe multiple seam mining is developed.
-
Date submitted2013-07-27
-
Date accepted2013-09-03
-
Date published2014-03-17
Gas balance definition of working area with face zone isolation
- Authors:
- V. V. Smirnyakov
The article describes the methods for gas balance definition of working area with face zone isolation from mined-out space, that have allowed to change the air distribution in face zone and to determine the part of evolved gas from bed and marked bed.
-
Date submitted2009-07-28
-
Date accepted2009-09-14
-
Date published2010-04-22
The use of computer technologies аt the stages of prospecting, mining and conservation of mineral deposits
- Authors:
- K. V. Morozov
- S. V. Lukichev
The article described the methods for the use of specialized application of software on the stages of exploration, design, planning and maintenance of mining operations and also in abandonment or conservation of mineral resources deposits.
-
Date submitted2009-07-22
-
Date accepted2009-09-22
-
Date published2010-04-22
Surveying methods for providing geodynamical safety of mining operations
- Authors:
- E. N. Kuznetsova
It is impossible to solve the main task of geodynamics without using technologies including traditional measurements of bench marks excursion, as well as new technologies of the end of XX – beginning of XXI century, such as photogrammetry, global positioning system, laser measurements and technologies of geophysical well logging. The paper concerns with the analysis of the mine surveying methods facilitating the solution of tasks related to the geodynamical safety assurance.
-
Date submitted2009-07-17
-
Date accepted2009-09-22
-
Date published2010-04-22
MINEFRAME is the modern tool for mining maintenance
- Authors:
- L. S. Lomako
- G. G. Korol
Today an automation of the basic technological processes in production is successfully introduced into various sectors of the national economy, including in mining practice. One of the modern software products intended for automated planning, designing and support of works at the mining enterprises, is integrated package – MINEFRAME which is put in industrial operation.
-
Date submitted2009-07-04
-
Date accepted2009-09-12
-
Date published2010-04-22
New technologies of conducting mine surveying works
- Authors:
- S. P. Smirnov
The paper presents principles for arrangement of mine surveying works. It is shown the role of new mine surveying and geodetic instruments and also new methods for application of these instruments in mineral mining.
-
Date submitted2009-07-02
-
Date accepted2009-09-30
-
Date published2010-04-22
On mechanisms for improvement of mine surveying works
- Authors:
- V. V. Gritskov
The article considers the aspects concerned with the improvement of mine surveying under conditions of market relations. It is shown that the financing of the urgent problems in safe mining operations related to the utilization of the Earth's interior, is practically absent on the federal level. In this connection, the development of the federal programme «Safe Utilization of Mineral Resources and Conservation of Reserves» is a high-priority task, which should include also the aspects of geodynamic safety in mining.
-
Date submitted1951-07-01
-
Date accepted1951-09-29
-
Date published1952-03-26
Notes on the derivation of formulas for determining the direction error from the eccentricity of the theodolite or signals
- Authors:
- Z. D. Nizguretskii
For assessing the impact of a design error on the accuracy of transmitting directions to a mine, existing mine surveying guidelines usually recommend formula (1) (see article). Using the same reasoning, a well-known formula is usually derived for assessing the accuracy of measuring angles in polygons depending on the impact of signal and instrument eccentricity. The above conclusion does not answer the question: what kind of error should be understood by the value of ex, which in existing guidelines is usually called the "average linear error" [1] or simply "linear error" [2]. Clarification of the meaning of the error ex is absolutely necessary when making practical calculations, since several characteristics of position accuracy are used in error theory, among which the most commonly used are the average linear error of position and the average linear error in direction.